HomeMy WebLinkAboutCOM2008-00114 Replace Dock and Pilings - COM Permit / Conditions - 10/16/2008 t
MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Inspection Line(360)427-7262
Mason County Bldg. 3 426 W. Cedar P.O. Box 186 Phone: (360)427-9670,ext.352
r
Shelton, WA 98584
COMMERCIAL BUILDING PERMIT COM2008-00114
OWNER: ALDERBROOK RESORT& SPA RECEIVED: 9/23/2008
CONTRACTOR: MARINE FLOATS 253-383-2740 LICENSE: MARINF*085QP EXP.- 3/11/2009 ISSUED: 10/16/200E
SITE ADDRESS: 7101 E STATE ROUTE 106 UNION EXPIRES: 4/16/2009
PARCEL NUMBER: 322335000014
LEGAL DESCRIPTION: SUNNY BEACH PCL 1 OF BLA#04-58
PROJECT DESCRIPTION: DIRECTIONS TO SITE:
Replace Dock and Pilings. SR 106
General Information Construction &Occupancy Information
No. of Units: Type of Constr.:
Type of Use: Insp.Area: of Bathrooms: Occ. Group:
Type of Work: ACC Fire Dist.: No.No.of Stories: Occ. Load:
Valuation: $ 231,131.90 Building Height:
Pre-Manufactured Unit Information Square Footage Information
Make: Length: Lot Size:
Model: Width: Building: :
Year: Serial No.: Basement: Parking Spaces:
Setback Information
Shoreline&Planning Information
Front: Ft. Shoreline: Ft.
Rear: Ft. Slope: Ft. Water Body:Hood Canal Shoreline Desig.: Urban
Side 1: Ft. SEPA?:Yes Comp. Plan Desig.: Rural
Side 2: Ft.
Fire Protection System Information
Auto Fire Alarm System?: Emergency Key Box?: Standpipe?:
Auto Fire Sprinkler System?: Access Road?: Fire Extinguishers?:
Fixed Fire Suppression System?: Fire Hydrants?:Y Fire Lanes?:
COM2008-00114 Please refer to the following pages for conditions of this permit. 1 of 5
Ar
Plumbing Fixtures Mechanical Fixtures FEES
c
Type Qty. Type Qty. Type By Date Amount Receipt
Plan Check Fee KKK Qig ionnR (41 19R A9 gg9nnRnn
Planning Review Fee KKK Qi9,iignnR RR1n nn g99nnAnn
IFC Plan Check Fee I A%A/ Q/Rn/gnnR 91 C1gnnRnn
Building State Fee ARr. 1n/1/9nnR ad Sn C1gnnRnn
Building Permit Fee ARr. 1Nt/9nnR a1 T19 Qs S19nngnn
Total $3,737.08
CASE NOTES FOR
COM2008-00114
CONDITIONS FOR
COM2008-00114
1) The plans do not indicate any fuel dispensing is to be done on site. If this changes a full an complete set of plans detailing the despening operation
will need to be sub tted for review and permitting prior to the installation of the system.
X�,���-
A least one fire hydrant is required to be installed on site providing the required fire flow. A separate submittal is required for review, per section
4604.3 of the 2006 In ernational fire code.
X i-7�
Install 4A40BC fire extinguisher so that the maximum distance of travel does not exceed 75 feet in any direction and mounted no more than 48
inches to the top of
t�he�nit to the walking surface of the dock.
X .�a%
A key box/knox box is required to be installed per section 506 of the 2006 IFC. Please contact the local fire district for more information and
inspection.
X��f/'Z-?
2) PER TITLE 14 MASON COUNTY BUILDING CODE -CHAPTER 14.17, STANDARDS FOR FIRE APPARATUS ACCESS ROADS - 14.17.110:
A fire apparatus access road in excess of 14% grade and more than 150' to new residential or commercial structures will require an automatic fire
sprinkler system installed. Contact the Mason County Fire Marshal at(360) 427-9670, extension 273, for further information.
y
3) Proper disposal of construction debris must be on land in such a manner that debris cannot enter Hood Canal, Alderbrook Creek or cause water
quality degredation of state waters.
# 4) Any discharge of sediment-laden runoff or other pollutants to waters of the state is in violation of Chapter 90.48, Water Pollution Control and WAC
/� 173-201A, Water Quality Standards for surface waters of the State of Washington and is subject to enforcement action.
COM2008-00114 2 of 5
5) The recommendations made within Section 8 of the Biological Assessment/Evaluation prepared by Allison Reak of Sea-Run Consulting and dated
December 2007 with Addendum dated April 2008, are to be implemented throughout the project.
Water quality is not to be degraded to the detriment of the aquatic environment as a result of this project.
;, -- Erosion control measures must be in place prior to any clearing, grading or construction. These control measures must be effective to prevent
stormwater runoff from carrying soil and other pollutants into surface water or storm drains that lead to waters of the state. Sand, silt, clay particles
and soil will damage aquatic habitat and are considered to be pollutants.
8 Construction debris must be safely managed, especially if it contains painted wood or concrete, treated wood or other possibly dangerous
materials. All dock materials not suitable for re-use will be disposed of at a permitted upland waste facility.
9) During construction, all releases of oils, hydraulic fluids, other petroleum products, paints, solvents and other deleterious materials must be
contained and removed in a manner that will prevent their discharge to waters and soils of the state. The cleanup of spills should take precedence
over other work on the site.
10) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance
Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be
obtained at 1-800-647-09§2,.,The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to
WA state law. X 4,%I, I I
11) All approved plans are required to be on-site for inspection purposes. If inspection is called for and plans are not on site, Approval WILL NOT be
granted. In addition, a reinspection fee, based on the current fee schedule, minimum one-hour will be charged and collected by the Mason County
Building Department prior to any further inspections being performed or approvals granted. X
12) Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title
14.28. �;Z
13) The approved site plan is required to be on-site for inspection purposes. If inspection is called for and the site plan is not on site, Approval WILL
NOT be granted. In addition, a reinspection fee, based on the current fee schedule, minimum one-hour will be charged and collected by the Mason
County BuildingjDepartment prior to any further inspections being performed or approvals granted.
X�
14) A structural observation, as defined in Chapter 17 of the International Code, shall be provided to the Mason County Building Department. Reports
shall be prepared by the engineer or architect of record responsible for the structural design or another engineer or architect designated by the
engineer or architect or record.
Reports shall be submitted to the Mason County Building Department within 2 weeks following each structural observation. A final observation
report shall be submitted prior to the final inspection of the structure. Written statements shall indicate the permit number, type of inspection, and
identify any repgged deficiencies.
X
15) In addition to the inspections required in IBC, Section 109, the owner, the engineer or architect of record acting as the owner's agent shall employ
one or more special inspectors who shall provide inspections during construction on the types of work listed under Chapter 17 and as specified by
the design professional. The special inspectors duties & responsibilities shall be as specified in Chapter 17.
Special inspection reports shall be submitted to the Mason County Building Department, PO Box 186, Shelton WA 98584 and available for
inspection. Inspection reports shall be completed and submitted to the dept. in a timely manner and shall be submitted prior to the framing and
final occupanc insjpections.
X 2)�`� I
COM2008-00114 3 of 5
16) Any changes in construction shall be reviewed by engineer of record and submitted in writing to the Mason County Building Department prior to
construction. All engineering documents are a part of the approved set of plans and must remain attached thereto. If engineering documents are
removed, approval will not be granted. In addition, a reinspection fee, based on the current fee schedule, minimum one-hour will be charged and
collecZMI
he Mason County Building Department prior to any further inspections being performed or approvals granted.
X
- 17) ALL CONSTRUCTION MUST MEET OR EXCEED ALL LOCAL CODES AND THE INTERNATIONAL CODE REQUIREMENTS AND
OCCUPANCY IS LIMITED TO THE PERMITTED AND APPROVED CLASSIFICATION. ANY CHANGE OF US OCCUPANCY WOULD
RESULT IN PERMIT REVOCATION. CHANGE OF USE MUST BE APPROVED PRIOR TO CHANGE. x
18) Changes to approved building plans that affect compliance to the current Washington State Energy Code (WSEC), ventilation and Indoor Air
Quality Code (VI Building/Plumbing/Mechanical Codes and/or Mason County Regulations shall be approved prior to construction.
J
19) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE
ADOPTED BUILDING CODE.
The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in
conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a
Mason Coun� Build g Inspector shall be made prior to requesting additional inspections.
20) All property lines shall be clearly identified at the time of foundation inspection. X �
21) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The
failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being
non-complia;it,vsith Mason County ordinances and building regulations.
22) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the
time for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control
of the permit nh Wer have prevented action from being taken. No more than one extension may be granted.
X f�9
23) Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal
fasteners, connectors, and flashing. Install metal connectors approved for contact with the new types of pressure treated material.
This permit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended fora period of 180 days at any time after work is
commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of
work is by means of a progress inspection.The owner or the agent on the owners behalf, represents that the information provided is accurate and grants employees of Mason County access to
the above described property and structure for review and inspection.
OWN ER OR AGENT: DATE: ll
COM2008-00114 4 of 5