HomeMy WebLinkAboutMIS99-0416 Demo Interior Walls - MIS Permit / Conditions - 7/19/1999 MASON COUNTY
Mason County Bldg. III 426 W. Cedar
P.O. Box 186 Shelton, Washington 98584
FOR INSPECTIONS CALL 427--9670
M 1599--0416 PARCEL :32233500001 +4 PLAT :SUPL.0 D I V : BL K : LOT :
JOB ADDRESS : 7101 E STATE ROUTE 143E UNION
APPLICANT : CHRISTA MINISTRIES
OWNER : CHRISTA MINISTRIES
LEGAL. : 8f111'I BEAEY T1 6-11 El A19 TAX 896
PROJECT DESCRIPTION
DEMOLITION ( INTERIOR WALLS)
PROJECT LOCATION :
REALTY OFFICE
T
�
PROJECT NOTES : r!U 8
DA
TYPE. AMOUNT ICY DATF RECEIPT
STFE 4 .50 KS 07/ 19/99 50947
DEMO 1: 42 .00 KS 07/ 19/99 50948
TOTAL 46 .50 bWNER ON tNT DATE:
1IS ?$V , rev: #41#1192 COMPLIANCE TO ATTACHED CONDITIONS IS
REOU I RED
CONCRETE MECHANICAL MOBILE HOME
Footings-Setback date by Ribbons
date by Gas Piping date b
Foundation Walls date by Set Up
date by INSULATION date by
BG/SLAB Insulation Floors Final
date by
by date by date by
Walls FIRE DEPT.
date by date by date by
PLUMBING OTHER
Groundwork Attic
` date b date by
D.W.V. WALLBOARD NAILING
date by date by
Watei line FINAL INSPECTION
date by date by date by
I
I
MASON COUNTY
Mason County Bldg. III 426 W. Cedar
P.O. Box 186 Shelton, Washington 98584
Case No . : MIS99-0416
For - CHRISTA IfAiNISTRIES
Page : 1
1 ) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDINGS
DEPARTMENT AND UNIFORM BUILDING CODE .x
PURSUANT TO 1997 UNIFORM BUILDING CODE , ALL SITE MUST BE MACiKED WITH APPROVED NUMBERS
OR ADDRESSES PROVIDED IN SUCH A POSITION AS TO BE PLAINLY VISIBLE AND LEGIBLE FROM THE
STREET OR ROAD FRONTING THE PROPERTY . MASON COUNTY BUILDING DEPARTMENT REQUIRES 'THAT
THIS BE COMPLETED PRIOR TO GALLING FOR ANY SITE INSPECTIONS , A RE: INSPECTION FEE , BASED
ON RATES ADOPTED FEE SCHEDULES AND THE 1997 UNIFORM BUILDING CODE WILL BE ASSESSED IF
OWNERICONTRACTOR FAILS TO POST ADDRESS ON SITE PRI014 TO REQUESTING INSPECTIONS .
x____ ._� '�
3 > THE DEMOLITION AND DISPOSAL OF DEMOLITION DEBRIS MUST MEET PEOUIREMENTS AS PER MASON
COUNTY REGULATIONS .
X-- z1, �- >->js y
CONCRETE MECHANICAL MOBILE HOME
Footings-Setback
date by Ribbons
date by Gas Piping date b
Foundation Walls date by Set Up
date by INSULATION date by
BG/SLAB Insulation Floors Final
date by
FRAMING date by date by
date by Walls FIRE DEPT.
PLUMBING date by OTHER date by
Groundwork Attic
date by date by
D.W.V. WALLBOARD NAILING
date by date by
Water Line FINAL INSPECTION
date by date by date by
II
1
I�
I
1
MASON COUNTY
Mason County Bldg. III 426 W. Cedar
P.O. Box 186 Shelton, Washington 98584
4 ) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUiRFD PER MASON COUNTY BUILDING
DEPARTMENT AND UNIFORM BUILDING CODE . x t� •J `i' �7- . �' __._..�___�
CONCRETE MECHANICAL MOBILE HOME
Footings-Setback date by Ribbons
date by Gas Piping date b
Foundation Walls date by Set Up
date by INSULATION date by
BG/SLAB Insulation Floors Final
date by date by date by
FRAMING Walls FIRE DEPT.
date by date by date by
PLUMBING OTHER
Groundwork Attic
date by date by
I D.W.V. WALLBOARD NAILING
date by date by
Water Line FINAL INSPECTION
date by date by date by
I
I