Loading...
HomeMy WebLinkAboutGeoTech Review for FPA2003-00007 and GRD2003-00008,00009 - COM Engineering / Geo-Tech Reports - 10/10/2001 MASON COUNTY PUBLIC WORKS DIRECTORICOUNTY ROAD ENGINEER Shehon,Wuhi oon 98584 DATE: May 12t', 2003 INTER-DEPARTMENTAL COMMUNICATIONS TO: Jenny Nickerson, DCD—Building Official Michael, MacSems, DCD - Planner FROM: Alan A. Tahja, P/W - Co. Hydr. Engr. WO# PLG-03 & BLD-03 SUBJ: Alderbrook-Hi hway 106 Re-Alignment, Grading, Geotechnical, & Stormwater Reviews FPA2003-00007. GRD2003-00008 & 9 Plans for the proposed State Highway 106 re-alignment in the vicinity of the Alderbrook Resort on the South Shore of Hood Canal have been received and reviewed by Public Works. Included in the reviewed materials is a Drainage Analysis, a Geotechnical Report with addendum, road re- alignment plans for Highway 106, and road intersection plans and details for the reconstruction of the Dalby Road—Hwy 106 intersection. The geotechnical report appears to adequately address stability issues. Recommendations made in the geotechnical report should be made conditions for project approval. A drainage analysis (copy included to DCD)prepared by Pat McCullough, P.E., of ESA was received directly from the engineer. The proposed drainage features appear to meet minimum State and County Stormwater Runoff treatment and attenuation requirements. Because of the size and complexity of the overall project, inspection of the stormwater control features through completion is an activity most easily and effectively handled by the project's construction inspectors and/or engineer(s). Public Works may perform random inspections during construction to verify that adequate and appropriate Erosion and Sediment Control features are being employed and maintained. At completion of the stormwater control facilities, Public Works requests that the project engineer provide the County a report indicating his satisfaction with the completed stormwater control facilities, and his acknowledgement that the completed facilities conform with the approved plans, or he has submitted as-built drawings detailing any changes or diversions from the approved plans. Operation and maintenance of the privately owned stormwater control features is expected to be provided by the facility's owner. Attached please find a copy of the Operation and Maintenance (O&M) Covenant Public Works has been employing to fulfill this requirement. The covenant form should be completed, signed (and notarized) by the responsible person, the signed covenant recorded with the County Auditor's Office, and a copy of the recorded covenant delivered to Public Works for monitoring and administration. Electronic copies of the covenant form may be acquired from Public Works at the following email address: AlanT@co.mason.wa.us RECEIVED File: H: \WP\PAC-Rows\Alderbrook-l.doc MAY 1 z 7003 MASON CO.PLAWING DEFT. An intersection re-alignment plan prepared by THE SHEA GROUP, a PARAMETRIX Company, for the proposed Highway 106—Dalby Road intersection has been received directly from the Shea Group. The County Engineer has reviewed the intersection plans (attached), and given his approval (attached) (Plans dated 4/24/03 Shea Group filename: 04454001 C- PLAN.DWG). To summarize, Public Works has reviewed grading, geotechnical, hydraulic, road alignment(s), and other features and plans pertaining to the proposed Highway 106 re-alignment, and feel the proposals to this point, are acceptable. - Please feel free to contact me at County extension 461 if you have any questions regarding these comments, or if you feel additional features need further consideration or discussion. S erely, z A n A. Tahja Attachments: 1) Highway 106/Dalby Road intersection plans sheet 2) County Engineer's approval of the intersection design 3) Alderbrook Resort Drainage Analysis 4) O&M Covenant Form 040"o GQO— V(A Q,- t ) 96 = e - hCWV3 at v;e cv gcly4�6- Yo A5,5;w Craw� File: H: \WP\PAC-Rows\Alderbrook-l.doc i