HomeMy WebLinkAboutCOM2003-00035 ReRoof Cottage 18 - COM Permit / Conditions - 2/25/2003 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Inspection Line(360)427-7262
352 ext.
� Mason County Bldg. 3 426 W. Cedar P.O. Box 186 Phone: (360)427-9670, i
Shelton,WA 98%4
COMMERCIAL BUILDING PERMIT
COM2003-00035
OWNER: ALDERBROOK INN RECEIVED: 2/25/2003
CONTRACTOR: JORNADA ROOFING CO LLC LICENSE: JORNARC983016 EXP: 8/26/2004 ISSUED: 2/25/2003
SITE ADDRESS: 7101 E STATE ROUTE 106 UNION EXPIRES: 8/25/2003
PARCEL NUMBER: 322336000014
LEGAL DESCRIPTION: SUNNY BEACH TR 8-11 EX AND TAX 895 SEE SP#1664
PROJECT DESCRIPTION: DIRECTIONS TO SITE:
REROOF UNIT 18 OFF HWY 106 NORTH OF UNION
General Information Construction &Occupancy Information
Type of Use: Insp.Area:
No. of Units: Type of Constr.:
Type of Work: RRF Fire Dist.: No. of Bathrooms: Occ. Group:
Valuation: No.of Stories: Occ. Load:
Building Height:
Pre-Manufactured Unit Information Square Footage Information
Make: Length: Lot Size:
Model: Width: Building:
Year: Serial No.: Basement: Parking Spaces:
Setback Information
Shoreline&Planning Information
Front: Ft. Shoreline: Ft.
Rear: Ft. Slope: Ft. Water Body: Shoreline Desig.:
Side 1: Ft. SEPA?: Comp. Plan Desi .:
Side 2: Ft.
Fire Protection System Information
Auto Fire Alarm System?: Emergency Key Box?: Standpipe?:
Auto Fire Sprinkler System?: Access Road?: Fire Extinguishers?:
Fixed Fire Suppression System?: Fire Hydrants?: Fire Lanes?:
COM2003-00035
Please refer to the following pages for conditions of this permit. 1 of 3
W
Plumbing Fixtures Mechanical Fixtures FEES
Qty. Type Qty. Type By Date Amount Receipt
Building State Fee KR ?nsi?nna ea Rn RIQ77
Re-Roof Fee KR w9rugnna err;Rn RlQn
Total $61.30
CASE NOTES FOR
COM2003-00035
CONDITIONS FOR
COM2003-00035
1) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance
Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be
obtained at 1-800-647-0982. The on signing this condition is either the homeowner, agent for the owner or a registered contractor according to
WA state law. X
2) PURSUANT TO 1997 UNIFORM BUILDING CODE, ALL SITES MUST HAVE APPROVED NUMBERS OR ADDRESSES PROVIDED IN SUCH A
POSITION AS TO BE PLAINLY VISIBLE AND LEGIBLE FROM THE STREET OR ROAD FRONTING THE PROPERTY. MASON COUNTY
BUILDING DEPARTMENT REQUIRES THAT THIS BE COMPLETED PRIOR TO CALLING FOR ANY SITE INSPECTIONS. A REINSPECTION
FEE, BASED ON RATES AS ADOPTED BY THE JURISDICTION AND THE 1997 UNIFORM BUILDING CODE WILL BE ASSESSED IF
OWNER/CONTRA%O�R FAILS TO POST ADDRESS ON SITE PRIOR TO REQUESTING INSPECTIONS.
X 1 `""
3) ENCLOSED ROOF SYSTAMS THAT ARE EXPOSED TO THE SHEATHING SHALL BE INSULATED TO A MINIMUM R-30 AND INSPECTED
PRIOR TO COVER. X
4) SINGLE RAFTER JOIST ROOF REPLACEMENT SHALL BE INSULATED TO A MI I UM OF R-30 ALLOWING FOR A MINIMUM OF ONE INCH
CONTINUOUS VENTED AIRSPACE ABOVE THE LEVEL OF INSULATION. X
5) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The
failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being
non-compliant with M n County ordinances and building regulations.
X
This permit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at any time after work is
commenced. Evidence of continuatio f work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied.
OWNER OR AGENT: DATE: 2' Z t�3
�COM2003-00035 2 of 3
K CONCRETE MECHANICAL MANUFACTURED HOME
N
o Footings / Setbacks Date By Ribbons
Date B Gas Piping Date B
o y 1P� g y
o Foundation Walls Date B y Set-up
Date By INSULATION Date By
B G / Slab Insulation Floors Final
Date By Date By Date By
FRAMING Walls FIRE DEPT
Date By Date By Date By
PLUMBING Attic OTHER
Groundwork Date B y
Date By WALLBOARD NAILING
D.W.V. Date B y
Date By FINAL ITqSPECTION
Water Line Date 67 120u By
D ate By Date By
)&4 lZ 02 103 1 KLS 1 mo
t, 03 12M Rt-� 10 Atjd
N
O
W O
O O
O x
W
w
0
w