HomeMy WebLinkAboutCOM2003-00094-Demo Lanai #1 - COM Permit / Conditions - 5/30/2003I
MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Inspection Line(360)127-7262
Mason County Bldg. 3 426 W. Cedar P.O. Box 186 Phone: (360)427-9670,ext.352
Shelton, WA 98584
COMMERCIAL BUILDING PERMIT COM2003-00094
OWNER: NORTH FORTY LODGING LLC RECEIVED: 5/8/2003
CONTRACTOR: WALSH CONSTRUCTION 206-547-3804 LICENSE: WALSHC99001 EXP: 3/19/2005 ISSUED: 5/30/2003
SITE ADDRESS: 7101 ESTATE ROUTE 106 UNION EXPIRES: 11/30/200"
PARCEL NUMBER: 322335000014
LEGAL DESCRIPTION: SUNNY BEACH LOTS 10-11 &8-9 N OF HWY
PROJECT DESCRIPTION: DIRECTIONS TO SITE:
DEMOLISH LANAI #1 STATE ROUTE 106 TO ALDERBROOK INN
General Information Construction&Occupancy Information
Type of Use: RESORT Insp.Area: No.of Units: Type of Constr.:
Type of Work: DEM Fire Dist.: 6 No.of Bathrooms: Occ.Group:
Valuation: No. of Stories: Occ. Load:
Building Height:
Pre-Manufactured Unit Information Square Footage Information
Make: Length: Lot Size:
Model: Width: Building:
Year: Serial No.: Basement: Parking Spaces:
Setback Information
Shoreline&Planning Information
Front: Ft. Shoreline: Ft.
Rear: Ft. Slope: Ft. Water Body: Shoreline Desig.:
Side 1: Ft. SEPA?: Comp.Plan Desig.:
Side 2: Ft.
Fire Protection System Information
Auto Fire Alarm System?: Emergency Key Box?: Standpipe?:
Auto Fire Sprinkler System?: Access Road?: Fire Extinguishers?:
Fixed Fire Suppression System?: Fire Hydrants?: Fire Lanes?:
r'OM2003-00094 Please refer to the following pages for conditions of this permit. 1 of 4
L-
Plumbing Fixtures Mechanical Fixtures FEES
Type Qty. Type Qty. Type By Date Amount Receipt
Demolition Fee Trc 5/R/9nn'3 &5R Rn S79nn�nn
Building State Fee Tw s/9n/9nns %a rn c99nnAnn
Total $61.30
CASE NOTES FOR
COM2003-00094
CONDITIONS FOR
COM2003-00094
1) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance
Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be
obtained at 1-800-647- The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to
WA state law. X
2) Demolition actitvities must conform with all State and local County regulations as a condition to the issuance of this permit. The applicant/owner is
directed Olympic Air Pollution Control Authority at(360)438-8768 or 1-800-422-5623 extension 104 prior to the commencing demolition.
3) Temporary erosion control measures must be implemented to prevent water qualradation of adjacent waters or wetlands. Silt fencing must
be installed and maintained until upland vegetation has become established. X
4) The activities and recommendations of the Habit t Management Plan shall be implemented and a follow-up site inspection shall be conducted by
planning staff prior to final approval. X � �
5) All approved plans are required to be on-site for inspection purposes. If inspection is called for and plans are not on site, Approval WILL NOT be
granted. In addition, a Re-Inspection fee in the amount of$52.30 per hour(minimum Dipyr)will be charged and must be collected by this
department prior to any further inspections being performed or approval granted. X �
6) Demolition actitvities must conform with all State and local County regulations as a condition to the issuance of this permit. The applicant/owner is
directed to gpnatct Olympic Air Pollution Control Authority at(360)438-8768 or 1-800-422-5623 extension 104 prior to the commencing demolition.
X ��
7) THE DE M LITION AND DISPOSAL OF DEMOLITION DEBRIS MUST MEET REQUIREMENTS AS PER MASON COUNTY REGULATIONS.
X
8) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The
failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being
X n-co��t with Mason County ordinances and building regulations.
COM2003-00094 2 of 4
This permit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at any time after work is
• commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied.
OWN ER OR AGENT: DATE:
COM2003-00094 3 of 4