HomeMy WebLinkAboutHydraulic Project Plan - PLN General - 2/1/1982 r
HYDRAULIC PROJECT
7.. APPROVAL �� YY
R.C.W. 75.20.100 t
0 February 1 , 1982 7'�'
'�)of Y�
DEPARTMENT OF GAME (Applicant should refer to this date In all correspondence) DEPARTMENT OF FISHERIES
600 Capitol Way North General Admin. Bldg.
Olympia,Washington 98504 PAGE 1 OF 1 PAGES. Olympia, Washington 98504
10 LAST NAME FIRST a t to: Alan D. Biggs 19 CONTACT PHONE(S) a a
Olympic Construction Company 426-1304 1 2 3 4
STREET OR RURAL ROUTE
5761 Arcadia Road SE 0 ® E wRIA
CITY STATE COUNTY ZIP A B C D C-14.0138
Shelton Washington 98584 la 1s 16 17
12 STREAM OR LAKE TRIBUTARY—TO F
Alderbrook Creek Hood Canal G F
13 QUARTER SECTION SECTION TOWNSHIP RANGE (E-W) 11 TYPE OF PROJECT
NW 33 22 North 3 L-lest Retaining Wall
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
W.11. in Mason County
TIME LIMITATIONS. ❑5 THIS PROJECT MAY BEGIN P�March
D BE COMPLETED BY:
February1 1982 1 1982
THIS APPROVAL IS TO BE AVAILABLE ON THE JOB SITE AT ALL TIMES AND ITS PROVISIONS FOLLOWED BY THE PERMITTEE
AND OPERATOR PERFORMING THE WORK.
The person(s) to whom this approval is issued may be held liable for any loss of or damage to fish life or habitat which results from
failure to comply with the provisions or intent of this approval. Failure to comply with the provisions of this approval is a gross misde-
meanor punishable by fine and/or imprisonment.
The Departments of Fisheries and Game reserve the right to make additional restrictions or conditions or revoke the approval if deemed
necessary by the departments for the protection of fish life. These departments cannot be held liable for any property damage which
might occur as a result of this project.
This approval pertains only to the provisions of the Fisheries and Game Codes. Additional authorization from other public agencies
may be necessary for this project.
1. All work s�,all be done by hand.
2. Wherever physically possible (i .e. , not constrained by asphalt or building foundations
the retaining wall shall be built out of the ordinary high water mark of the stream
and behind the existing rubble bank protection.
3. The wall shall be started at site "A" as shown on the attached sketch and as
discussed on-site on January 29, 1982 and shall proceed downstream to site "C". At
site "B" the wall shall be built across the point and behind the stump.
4. The stump at site "B" shall be removed.
5. No fresh concrete shall enter the stream.
, 6. The broken concrete rubble shall be removed from the stream after the wall has been
constructed.
7. During construction, sediment shall not be allowed to enter the stream.
8. All disturbed banklines shall be grass-seeded during late March for erosion control .
SEPA: Issuance of this approval is exempt from SEPA: Under $5,000
cc: Fiscus
Johns - Patrol
PROVISIONS ATTACHED:
DEPARTMENT OF FISHERIES DEPARTMENT OF GAME
QDIRECTOR DIRECTOR
]
I _�