Loading...
HomeMy WebLinkAboutBLD2020-00911 Pole Barn - BLD Inspections - 6/25/2024 a MASON COUNTY615 W.Alder St.Bldg 8,SHELTON,WA 98584 COMMUNITY SERVICESSHELTON:360-427-9670,EXT 352 BELFAIR:360-275-4467,EXT 352 Building,Plannv4 Env'uonmental HealtfwCommunity Health ELMA:360-482-5269,EXT 352 -- www.co.mason.wa.us INSPECTION CARD AND CERTIFICATE OF OCCUPANCY** To schedule an inspection call or visit http:ihvww.co.mason.wa.us/community-services/bid-inspection.php Permit Number BLD2020-00911 Date Issued 12/18/2020 Issued By Project AGRICULTURE POLE BARN FOR CHRISTMAS TREES&COWS Site Address 1008 SE Phillips Rd Applicant MARQUARDT JEREMY Contractor Contractor Phone Primary Code UPC IBC,IRC,IFC,IEC,IMC,& Type Permit Type GARAGE/STORAGE Occupancy -APPROVED PLANS MUST BE ONSITE FOR ALL INSPECTIONS. -DO NOT PROCEED BEYOND EACH STAGE OR COVER WORK UNTIL APPROVAL IS GRANTED. -THIS CARD MUST BE POSTED IN A CONSPICUOUS LOCATION,FRONT OF THE PREMISES IS BEST FOR MAKING ENTRY. -ALL PERMITS EXPIRE 180 DAYS AFTER THE PERMIT IS ISSUED OR 180 DAYS AFTER DATE OF LAST INSPECTION. -OWNER/AGENT IS RESPONSIBLE FOR REQUESTING ALL INSPECTIONS THROUGH FINAL INSPECTION. **THIS STRUCTURE MAY NOT BE USED OR OCCUPIED UNTIL ALL APPROVALS ARE GRANTED.— PRIOR TO CALLING FOR FINAL INSPECTION,ALL CONDITIONS OF THE PERMIT MUST BE MET Public Works Access/Driveway Other Health Septic Well Deptartment Planning Site Inspection Department Fire Marshall Fire Apparatus Access Fire Sprinkler Auto Fire Alarm Hood and Duct N Other Final Building Department Building Official: Community Services Designee Concrete Setbacks -/,S. a Slab Footing Perimeter IPoint load Footing Footing Interior Footing Decks/Porches Foundation Stem Walls Other Rough-In Groundwork Plumbing Framing Groundwork Mechanical Plumbing Groundwork Gas Pipe Mechanical Gas Piping Shear Wall Nailing Underfloor Other Insulation Slab Ceiling Floor Vaulted Ceiling Walls Vapor Barrier Other Wallboard Interior Wall Brace Panels Fire Walls Nailing Other Final Building Manufactured Setbacks Setup Home Concrete Foot/Runners Final Other INSPECTION HISTORY Page 1of1 Report run on: 08/14/2023 Application #: BLD2020-00911 Parcel# : 320357500130 Property Address: 1008 SE Phillips Rd Shelton Project: Inspection Type Description Inspector Date Status Comments SETBACK INSPECTION Setback Inspection Joshua Quarders 27-May-22 PASS FOOTING INSPECTION Footing Inspection Joshua Quarders 27-May-22 PASS FRAMING INSPECTION Framing Inspection BLD-FINAL INSPECTION BLD-Final Inspection PROGRESS INSPECTION Progress Inspection Corey Bennett 04-Jun-21 DONE PROGRESS INSPECTION Progress Inspection Joshua Luck 15-Dec-21 DONE PROGRESS INSPECTION Progress Inspection Nikita Huckabey 29-Nov-22 DONE GENERAL INSPECTION General Inspection PENDING MASON COUNTY 360-427-9670 Shelton ext.352 c 360-275-4467 Belfair ext.352 COMMUNITY DEVELOPMENT 360-482-5269 Elma ext.352 Building,Planning,Fire Marshal 615 W.Alder St.Bldg.8 - Shelton,WA 98584 www.masoncountywa.gov CORRECTIONANSPECTION REPORT PERMIT/CASE NUMBER: JRQ.20.�d - QOR 1/ ADDRESS/LOCATION: /QQ 9 SE PH II W EJ ED FINDINGS: — &L P3161 q0ZXS 3o SE S,4ckF1cGEJJ TO — ACC S'7tl RM WsF?E2 fi'p $4 D1 ER16-0 AA)AY -FRU•�l .j@wc.D1,v6. FwAL G 1?hpc- To JWPer i1-1A•Y j M-t 1NILDI06 ANt) -rfL&&Z6ckr OR OPW6 RERJ;P6O AT A& r4U. DDk,7Na6JTT -M 6E'7- -JhTER AWAY FR060-1 j3u1e,0Nl6, -- comAWc, Pincl Grb--4^g and anPlor, erosion CoAlro Items listed above must be corrected to gain compliance. ❑ THIS IS NOT A COMPLETE INSPECTION ❑ This structure has been inspected by Mason County Building Department and the items listed above are in VIOLATION of Mason County laws and/or ordinances. Call for re-inspection when corrections are made before proceeding with any further work. ❑ Make corrections, items will be checked on the next inspection. ❑ OK to Date: 1-23,2 4 ❑ Please contact our office regarding possible Department: 'BID structural damage incurred by recent Inspector: „ ,natural/man made"disasters.This is NOT a CORRECTION NOTICE. DO NOT REMOVE THIS TAG MCC14.12 Mason County `. Mason County - Division of Community Development 615 W. Alder St. Bldg.8 Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us IVIIL L B DD2020-00911 GARAGE/ STORAGE PROJECT DESCRIPTION: AGRICULTURE POLE BARN FOR ISSUED: 12/18/2020 CHRISTMAS TREES & COWS SITE ADDRESS: 1008 SE PHILLIPS RD SHELTON EXPIRES: 06/16/2021 PARCEL: 320357500130 APPLICANT: MARQUARDT JEREMY OWNER: MARQUARDT JEREMY 1008 SE PHILLIPS RD 1008 SE PHILLIPS RD SHELTON,WA98584 SHELTON,WA98584 1,503,701.7617 VALUATIONS: FEES: Paid Due U VB Utility, miscellaneous 3360.00 $162,288.00 State Fee-Residential $6.50 $0.00 Planning Review Fee $240.00 $0.00 Plan Check Fee $958.78 $0.00 Technology Surcharge $48.68 $0.00 Building Permit Fee $1,475.04 $0.00 Total: $162,288.00 Totals : $2,729.00 $0.00 REQUIRED INSPECTIONS Setback Inspection Framing Inspection Footing Inspection BLD-Final Inspection CONDITIONS ` Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which is proposed to be located within 25' of a Mason County road right of way, it is suggested to contact that office to review future planned work which may affect your project. Panted by:Kati Dooley on:92 1812020 09: , n Count County DMS Page t of 5 Mason County Mason County - Division of Community Development 615 W.Alder St. Bldg.8 Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us GARAGE/ STORAGE BLD2020-00911 ` Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28 and 14.17. * When parcel development requires direct access to state road(s), a Road Access Permit or Approval must be granted and approved by the Washington State Department of Transportation. For more information contact Washington State Department of Transportation, at(206)357-2620, ext.630. * WIND LOADS-Roof coverings shall be designed and tested to withstand the maximum basic wind speed. The basic wind speed for Mason County is 85 MPH. • The foundation/footing must be placed on undisturbed, firm-native soil. * When parcel development requires direct access to county road(s),a Road Access Permit or Approval must be granted by the Mason County Department of Public Works. For more information contact Public Works, at(360)427-9670, ext.450 or 100 W Public Works Dr. Shelton.The building permit will not be finaled until the permit holder can show proof that the access permit from Public Works has been finaled and approved. * The use, handling and storage of hazardous materials or flammable and combustible liquids in excess of 10 gallons is not allowed without the approval of the Mason County Fire Marshal. * Approved per dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the structure.Agricultural buildings including appurtenant structures must meet the minimum 50' setback from all property lines. X * Retaining walls needed to support a surcharge such as structures, roads,or to support slopes, shall require a separate building permit and approval prior to construction of the retaining wall. * All property lines shall be clearly identified at the time of foundation inspection. * All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may grant a one time extention of 180 days, upon the receipt of a written extension request prior to permit expiration. Letter must indicating that circumstances beyond the control of the permit holder preventing action from being taken. No more than one extension may be granted. * All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation. * OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit revocation.Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary parties, including any easement holder or parties of interest regarding this project.The owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for review and inspection.This permit/application becomes null& void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION. * The stamped approved site plan is required to be on-site for inspection purposes. If an inspection is requested and the approved site plan is not on site, approval will not be granted. In addition, a re-inspection fee(refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being performed or approvals granted. * All changes to"approved" building plans that effect compliance with the international codes as amended and adopted, or any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction. * Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal fasteners,connectors, and flashing. Install metal connectors approved for contact with the new types of pressure treated material. Pdnted by. W Dooley on 12118f202d M 11)AV Page 2 of 5 Mason County Mason County - Division of Community Development 615 W.Alder St. Bldg.8 Shelton,WA 98584 360-427-9670 ext 352 www.co.mason.wa.us GARAGE/ STORAGE BLD2020-00911 * Concrete used for basement walls,foundation walls, exterior walls, porches, carport slabs, steps exposed to the weather, garage floor slabs and other vertical concrete work exposed to the weather shall have a minimum compressive strength of 3000 psi (IRC Table R402.2). * Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division.There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982.The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. * The plan review check list and corrections are part of the approved plans and must remain attached. It is the responsibility of the applicant, owner or contractor to make the required corrections indicated on the plans. Once the plans are marked "APPROVED",they shall not be changed or altered without authorization from the Building Official. The permit holder is responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or removal of approved documents will result in failure of required building inspections. * CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting additional inspections. * All surface water and potential runoff must be controlled on site and shall not adversely affect any adjacent properties nor increase the velocity flow entering or abutting to any state or county culverting/ditching system or road way. * Landings and stairs must meet the same setback conditions as any permitted structure; and, must be shown on your site plan. Please check your"Approved Site Plan"to ensure these structures are shown and meet the setback conditions listed. * All building permits shall have a final inspection performed and approved by Mason County Building Department prior to permit expiration.The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordinances and building regulations. * Concrete encased grounding electrodes must be installed and used at each new building or structure that is built upon a permanent concrete foundation. In Mason County the electrical code is regulated by Washington State Department of Labor & Industries (L&I). For more information contact L&I for additional information. In Olympia call(360)902-6350 and in Bremerton call(360)415- 4000. * REQUIREMENTS FOR ROOF COVERINGS. Roof coverings shall be applied in accordance with the applicable provisions of the current code and the manufacturer's installation instructions. A drip edge shall be provided at eaves and gables of shingle roofs. * By definition, propane tanks and heatpumps are structures, which must meet setback conditions. Please check your "Approved Site Plan"to ensure these structures meet the setback conditions listed. * The international code requires a fire apparatus access road for every facility, building, or portion of a building that is more than 150'from an approved access road. Roads are required to meet the minimum Mason County Fire Marshal standards for Fire Apparatus Access Roads up to the point where such roads connect with a county maintained public road or to another fire apparatus access road which connects to a county maintained public road. Printed by:Kati Cooley'on:12118/202608 10 AM"' Page 3 at 5 Mason County ( Mason County - Division of Community Development 615 W.Alder St. Bldg.8 Shelton,WA 98584 360-427-9670 ext 352 www.co.mason.wa.us GARAGE/ STORAGE BLD2020-00911 * A Mason County Stormwater Management Worksheet was completed and signed as part of this building permit application. Design, sizing, placement, inspection and maintenance of stormwater management systems shall be the responsibility of the owner/agent of the developed parcel. It is the owner/agent/contractor's responsibility to ensure that Mason County Department of Public Works has approved the stormwater site plan for this parcel prior to the commencement of any development activities. *NOTE if Stormwater Management option "A"was selected on the Small Parcel Stormwater Management Application/Worksheet the document entitled"Managing Storm Drainage on Small Lots, The Small Parcel Stormwater Site Plan"constitutes an approved plan based on the criteria listed on the application/worksheet. If the development has, or will have, a septic/drainfield system you are responsible for contacting Mason County Division of Environmental Health to ensure that the stormwater system will not adversely affect the septic system of this, or any other, parcel. You may also wish to consult with the septic design professional involved with the project. By calling for a final inspection of the building permit the owner/agent/contractor is acknowledging that all components of the stormwater management system have been installed as approved on the stormwater site plan. Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which is proposed to be located within 25'of a Mason County road right of way, it is suggested to contact that office to review future planned work which may affect your project. * All RED stamped approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site,then approval will not be granted. In addition, a re-inspection fee(refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building Department prior to any further inspections being performed or approvals granted. * This structure is approved as unheated space. To be considered unheated space the area may be provided with a heating system that does not exceed maxium output of 1 watt per square foot., or 3.4 Btu/h per square foot. A permit and approval is required prior to installation of any heating system. When a heating system exceeds 1 watt per sq. ft(or 3.4 btu/h per sq.ft)the heated space shall be insulated in accordance with the energy code in effect at the time of permit application. * This structure is limited to U-occupancy use only(private garages,carports, sheds, and agricultural buildings.) Any other use will be in violation of the intemational codes and Mason County Regulations unless a "Change of Use"permit is applied for, reviewed and approved. * Application acknowledges that the structure is only permitted for a use consistent with the current zoning of the parcel. Property is zoned Rural Residential 5. * Residential developers and individuals shall be required to control erosion during construction. Removal of vegetation should be minimized and any areas disturbed should be restored to prevent erosion and other environmental impacts. P4 Page 4 of 5 Printed from Mason County ISMS MASON SON COUNTY 615 W.Alder St.Bidg 8,SHELTON,WA 98584 ' SHELTON:360-427-9670,EXT 352 COMMUNITY SERVICES BELFAIR:360-275-4467,EXT 352 Budding.PlunwN,Enviro mer"Nenhh.Co munityHwAth ELMA:360-482-5269,EXT 352 www.co.mason.wa.us INSPECTION CARD AND CERTIFICATE OF OCCUPANCY`* To schedule an Inspection call or visit http:/twww.co.mason.wa.us/community-services/bid-inspectio .php Permit Number BLD2020-00911 Date Issued 12/18/2020 Issued By � Project AGRICULTURE POLE BARN FOR CHRISTMAS TREES&COWS Site Address 1008 SE Phillips Rd Applicant MAROUARDT JEREMY Contractor Contractor Phone CANULLED Primary Code UPC IBC,IRC,IFC, IEC,IMC,& Type Permit Type GARAGE/STORAGE Occupancy -APPROVED PLANS MUST BE ONSITE FOR ALL INSPECTIONS. -DO NOT PROCEED BEYOND EACH STAGE OR COVER WORK UNTIL APPROVAL IS GRANTED. -THIS CARD MUST BE POSTED IN A CONSPICUOUS LOCATION,FRONT OF THE PREMISES IS BEST FOR MAKING ENTRY. -ALL PERMITS EXPIRE 180 DAYS AFTER THE PERMIT IS ISSUED OR 180 DAYS AFTER DATE OF LAST INSPECTION. -OWNER/AGENT IS RESPONSIBLE FOR REQUESTING ALL INSPECTIONS THROUGH FINAL INSPECTION. **THIS STRUCTURE MAY NOT BE USED OR OCCUPIED UNTIL ALL APPROVALS ARE GRANTED." PRIOR TO CALLING FOR FINAL INSPECTION,ALL CONDITIONS OF THE PERMIT MUST BE MET Public Works AccessiDriveway Other Health Septic Well Deptartment Planning Site Inspection Department Fire Marshall Fire Apparatus Access Fire Sprinkler Auto Fire Alarm Hood and Duct Other Final Building Building Official: Community Services Designee Department Concrete Setbacks Slab Footing Perimeter Point load Footing Footing Interor Footing Decks/Porches Foundation Stem Walls Other Rough-In Groundwork Plumbing Framing Groundwork Mechanical Plumbing Groundwork Gas Pipe Mechanical Gas Piping Shear Wall Nailing Underfloor Other Insulation Slab Ceiling Floor Vaulted Ceiling Walls Vapor Barrier Other Wallboard Interior Wall Brace Panels Fire Walls Nailing Other Final Building Manufactured Setbacks Setup Home Concrete Foot/Runners Final Other Printed From Mason Printed from Mason County DMS Mason County Mason County - Division of Community Development 615 W.Alder St. Bldg.8 Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us GARAGE/ STORAGE BLD2020-00911 I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of Laws and Ordinances governing this type of work will be complied with whether specified herei r\not. The gf ing of a permit does not presume to give authority to violate or cancel the prow, 'o f other state/ cal law regulating construction or the performance of construction. Issued By. Contractor or Authorized Agent: Date: Printer/by;Kati Dooley orc'2,18=2009:10 AM �n C.1ounty DMS o �� Page 5 of 5 ur"fy