HomeMy WebLinkAboutMIS95-0462 Foundation - MIS Permit / Conditions - 6/30/1995 MASON COUNTY
Mason County Bldg. III 426 W. Cedar
RO, Box 186 Shelton, Washington 98584
M 1 S C E i__ l_ A r%1 t= CI t.I lczz-� P E- R IN," I I FOR INSPECTIONS CALL. 427-9670
MIS95-0462 PARCEL :322334400040 PLAT : DIV : BLK : LOT :
JOB ADDRESS : E 7361 STATE ROUTE 106 UNION
APPLICANT : KATHERINE NORDSTROM 898-2363
OWNER : KATHERINE NORDSTROM 898--2363
LEGAL : 1112 GOUT LOT i EX TAX 111C EX 119C EX UE—MVEt 9151
PROJECT DESCRIPTION :
FOUNDATION ONL.Y
PROJECT LOCATION :
114 MILT EAST OFF ALl._DERBROOK INN ON WATER SIDE OF ROAD .
PROJECT NOTES :
'TYPE AMOUNT BY DATE RECEIPT
STFE $ 4 .50 CPH 06/30/95 39529
FDNO t 15 .00 CPFI 06/30/95 3952.9 //
c
_.w_._.G�- .__3c
TOTAL : 19 ,50 OWNER OR AGENT DATE
115—PINT, rev: #4101192 COMPLIANCE. TO ATTACHED CONDITIONS IS
REQUIRED
r
CONCRETE MECHANICAL MOBILE HOME
Footings-SetbaS _ �_ date by Ribbons
date Gas Piping date b
Foundation Walls date by Set Up
date by INSULATION date by
BG/SLAB Insulation Floors Final
date by date by date by
FRAMING Walls FIRE DEPT.
date by date date by
PLUMBING Attic by OTHER
Groundwork
date by date by
D.W.V. WALLBOARD NAILING
date by date by
Water Line FINAL INSPECTION
date by date by date by
I
MASON COUNTY
Mason County Bldg. III 426 W. Cedar
P.O. Box 186 Shelton, Washington 98584
PERM 1 'T C4DNn 1 T 1 CANS
Case No . : MI S95--0462
For : KATHERINE NORDSTROM
Page : 1
1 ) All approved plans are required to he on.--sifie for inspection purposes . If inspection is
called for and plans are not on site, Approval WILL NOT be granted . In addition , a
Re-- inspection fee in the amount of $30 .00 per hour (minimum 1 hour ) will be charged and
must be collected by this department prior to any further inspections being performed or
approv I granted .
X
2 ) PURSUANT TO 1091 UNIFORM BUILDING CODE , SECTION 305(C ) AND SECTION 613 , ALL SITFS MUST
` HAVE APPROVED NUMBERS OR ADDRESSES PROVIDED IN SUCH A POSITION AS TO BE PLAINLY VISIBLE
AND LEGIBLE FROM THE STREET OR ROAD FRONTING THE PROPERTY ., MASON COUNTY BUILDING
DEPARTMENT REQUIRES THAT THIS BE COMPLETED PRIOR TO CALLING FOR ANY SITE INSPECTIONS . A
RE I NSPECT i ON FEE , BASED ON RATES IN TABLE" 3A OF THE 1991 I)N I FORM BUILDING CODE WILL BE
ASSESSED IF OWNER/CONTRACTOR FAILS TO POST ADDRESS ON SITE PRIOR TO REQUESTING
INSPECTIONS .
3 ) ALL- CONSTRUCTION Mt.E1,3'4 MEET OR EXCEED ALL LOCAL CODES AND UNIFORM BUILDING
CODF
I
I
�I
I
CONCRETE MECHANICAL MOBILE HOME
Footings-Setback date by Ribbons
date by Gas Piping date b
Foundation Walls date by Set Up
date by INSULATION date by
BG/SLAB Insulation Floors Final
date by date by date by
FRAMING Walls FIRE DEPT.
date by date by date by
PLUMBING OTHER
Groundwork Attic
date by
date
t)W V b WALLBOARD NAILING
date by date by
Water Line FINAL INSPECTION
date by date by date by
i
MASON COUNTY
Mason County Bldg. III 426 W. Cedar
P.O. Box 186 Shelton, Washington 98584
ALL CONSTRUCTION MUST MEET REQWIRED SETBACKS AS ESTABLISHED PER MASON COUNTY ORDINANCE
138 A,i�D MA N COUNTY SHORELINE MASTER PROGRAM IF APPLICABLE .
IF THE FOUNDATION IS PLACED IN VIOLATION OF ANY MASON COUNTY REGULATION, 1'T WILL.. BE THE
OWNERS LIABILITY TO REMOVE SAID CONSTRUCTION AT THE OWNERS EXPENSE AND TO DO SO WITHIN
THE TIME SPECIFIED BY THE BUILDING OFFICIAL . IT SHALL. BE DEEMED A VIOLATION FOR ANY WOOD
FRAME ,CONSTRUCTION TO BEGIN ON THIS FOUNDATION WITHOUT THE ISSUED BUILDING PERMIT .
X
4 ) ALL CONSTRUCTION MUST MEET OR EXCEED ALL LOCAL CODES AND UB(-,
XEt1U
.' EMEI�TS
5 ) Proposed structure or, any portion thereof greater- than "'0" in height from ,grade line ,
must t)M i nta i n a minimum of 5 ' setback from all property 1 i nes , easements and right of
ways
X
6) Changes to approved building plans that effect compliance to the 1991 Washington State
Energy Cade, 1991 Ventilation and Indoor Air Quality
Code, they Uniform Building Code and/or Mason County Alm, u 1 ! i ort.et must
�!be approved by Mason County prior to eonstruotionX _, ,e--
7 ) ALL CONSTRUCTION MUST MEED OR EXCEED LOCAL CODES . IF ANY QUESTIONS, PLEASE
CALL_ THIS OFFICE BEFORE CONSTRUCTION .
X
I 8 ) CONSTRUCTION PROCESS TO HE FIELD CORRECTEPYrAS R.E UtF�9 PER MASON COUNTY BUILDING
DEPARTMENT AND INN 1 FORM BU 1 LD I NG CODE . x i -�
CONCRETE MECHANICAL MOBILE HOME
Footings-Setback date by Ribbons
date by Gas Piping date b
Foundation Walls date by Set Up
date by INSULATION date by
BG/SLAB Insulation Floors Final
date by date by date by
FRAMING Walls FIRE DEPT.
date by date by date by
PLUMBING OTHER
Groundwork Attic
date by date by
D.W.V. WALLBOARD NAILING
date by date by
Water Line FINAL INSPECTION
date by date by date by
coo
��o/s