HomeMy WebLinkAboutFPA2018-00012 - FPA Application - 10/25/2018 RECEIVED
MASON COUNTY OCT 2 5 2018
1 COMMUNITY SERVICES 615 W. Alder street
Building,Planning,Environmental Health,Community Health
615 W.Alder St.—Bldg.8,Shelton,Wa 98584 FPA - g
Phone:(360)427-9670 ext.352 ♦ Fax:(360)427-7798
FOREST PRACTICES APPLICATION/NOTIFICATION
Type IV General
This application should be accompanied with an Environmental Checklist (SEPA) as well as an activity map/site plan which addresses
items listed below.
TYPE OR PRINT IN INK:
1. Landowner,Timber Owner and O erator information.
Legal Name of LANDOWNER Legal Name of TIMBER OWNER Legal Name of OPERATOR
Hood Canal Holdings LLC Same as LANDOWNER Peninsula Topsoil
Mailing Address: Mailing Address: Mailing Address:
10230 NE Points Drive, Suite 200 10230 NE Points Drive, Suite 200 PO Box 640
City, State,Zip City, State,Zip City,State,Zip
Kirkland, WA 98033 Kirkland, WA 98033 Belfair,WA 98528
Phone(707) 834-0006 Phone(707) 834-0006 Phone(360) 275-1000
Jason@peninsulatopsoil.com
Email: v-ran watermark-Ilc.com Email: v-ran watermark-Ilc.com Email:
2. Contact person information.
Contact Person Phone(707) 834-0006
Ray Nelson
Email: v-ran watermark-Ilc.com
3. If you are harvesting timber,enter the Forest Tax Reporting Account Number of the Timber Owner: 800083757
For tax reporting information or to receive a tax number,call the Department of Revenue at(800)548-8829.
4. Legal description where the forest practices will occur.
Parcel Number Sub Div ion '/.%. Section Township Range E/W
32233-50-90050 33 22N 3W
5. Answer each question as it applies to your proposed forest practice.
a. [x]No. [] Yes. Is the activity within an urban growth area?
b. [x]No. [] Yes. Is the activity within a public park?
C. [x]No. [] Yes. Is the activity within 500 feet of a public park? Park name:
d. [x]No. [] Yes. Is the activity located on lands platted after January 1, 1960?
e. []No. [x] Yes. Is the activity within 200 feet of saltwater take river/creek/stream X pond
wetland seasonal runoff slopes which exceed 15%? X
f. What is the expected duration of FPA? 3 months
Proposed start date: February,2019 Proposed end date: April,2019
6. Are you cutting or removing timber?
[]No. [x] Yes. Complete the table below and identify all timber harvest and salvage activity boundaries on the
activity map.
Rev.August 2017
Acres Volume to be Steepest Slope in
Unit# Harvest Type Yarding Method net Harvested mb Harvest Unit
n/a selective cut shovel/excavator 0.29 acres 20.27 35
7. Are you constructing or abandoning roads?
[x]No. [] Yes. Complete the table below. Show locations and identify all road activities on the activity map.
Total Length Steepest Side Slope Abandonment Date
Type of Activity feet % Mo/Yr
Road Construction Does Not Apply
Temporary Road Construction
Road Abandonment
Work in or over typed water may require a Hydraulic Project Approval(HPA)from the Washington Department of Fish and Wildlife
(WDFW). If you have questions concerning the HPA,visit the WDFW website at www.wdfw.wa.Qov/habitat.htm.
8. Are you installing or replacing water-crossings?
[x]No. [] Yes. Complete the table below. Show locations and identify all proposed water-crossings on the activity map.
Crossing Crossing Dimensions Crossing Crossing Dimensions
Identifier Type width x length) Identifier Type width x length)
9. Mark the following activities that will be done in or over typed water. n/a
Activity in or over: Type I Stream Type II Stream Type III Stream Type IV Stream Type V Stream
Removing culverts of bridges
Equipment crossing
Ground skidding
Suspending cables
Cable yarding
Falling and bucking
Other
10. Is any activity in a wetland or wetland buffer?
[x]No. [] Yes. Complete the table below. Show locations and identify all wetlands and buffers on the activity map.
Wetland Wetland Type Activity Type in Activity Type in Total Wetland Total Area Total Area
Identifier (I,II,III,IV, Wetland Buffer Area(acres) Drained(acres) Filled(acres)
other
11. Describe how the following are identified on the ground.
• Harvest boundaries/unit corners: trees to be removed tagged with ribbon
• Right-of-way limits and centerlines for road work,culverts and bridges: n/a
• Critical areas and critical area buffer boundaries: Wetland boundaries marked with pink flags,Wetland/Upland data points
marked with yellow w/orange polka dot flags. Stream OHWM marked with
orange flags. Hood Canal OHWM marked with orange flags.
Page 2 of 4
12. Have you reviewed this forest practices activity area to determine whether it may involve historic sites and/or Native American
cultural resources? []No. [] Yes.
13. We affirm that the information contained herein is true,and understand that this proposed forest practice is subject to the Forest
Practices Act and Rules and Mason County Forest Practices Conversion Ordinance as well as all other federal,state or local
regulations. Compliance with the Forest Practices Act and Rules and the Mason County Forest Practices Conversion Ordinance
does not ensure compliance with the Endangered Species Act or other federal state or local laws.
Signature of AND OWNER Signature of TIMBER OWNER Si tur of O RATOR
(if different than landowner) (If d e at landowner)
Same as LANDOWNER
Print name:Ray Ne on,owner representative Print name: Print ame:
(JttSr� �ry►„yr
Date: .2 S' Date: I Date: /0 23 `1
Additional information: (Optional)
This project involves the selective removal of trees for site development and improvement purposes.
Per Mason County Ordinance 11.05, Section 11.05.120,a site map shall accompany this application which includes the
following information.
I Harvest boundaries and tree retention areas.
II The approximate location of any structures.
III The location of all existing and proposed streets,right-of-ways,easements,skid roads,haul roads,and landings
within the proposal.
IV The location of future land development including stormwater management facilities and vegetation to be retained
for site landscaping,open space,wildlife habitat,screening,and/or buffers.
V Site topography at contour intervals of 40 feet.
VI Critical areas and critical area buffers regulated pursuant to the Critical Areas Ordinance.
VII Drainage ways and culverts.
VIII Site area targeted for further harvest including proposed timing.
IX North arrow and scale shall be shown on all site plans.The scale shall be no smaller than one inch to 200 feet.
Staff asks that,at a minimum,the corners of the harvest unit(s)be flagged for clear identification.
Page 3 of 4
NOTE: Copies of all FPA Applications will be forwarded to Mason County Public Works for stormwater and erosion
control review.Projects which disturb more than one acre(regardless of total lot size)will require an engineered
stormwater plan consistent with the Mason County Stormwater Ordinance(Chapter 14.48.)and the 2012 WSDOE
Stormwater Manual.Applicants will be charged for Public Works staff time to review these plans and applications.
Property owners should also be aware that the Washington State Department of Ecology(WSDOE)might ask for a
NPDES(National Pollution Discharge Elimination System)Permit.The threshold for such a permit is equivalent to
Mason County's threshold.WSDOE will notify applicants through SEPA review if a NPDES is required.An NPDES is
not a perquisite for FPA approval.It is the responsibility of the applicant to obtain this permit when required.
FPA FEE: $300 SEPA FEE: 0-9.99 Acres$730
10 to 20 Acres$880
Over 20 Acres$1,100
EIS(DS)$5,000+90/hr
Departmental Review
(For Office Use Only)
Site visit:
Dat pproved:
////� VLt,�
Ma on C unty Community Services
Page 4 of 4
FINDINGS OF FACT
FPA Case#2018-00012
APPLICANT: Hood Canal Holdings
APPLICATION DATE: August 7, 2018
Mason County has reviewed the above referenced application for Class IV General Forest
Practices and finds it in conformance with all applicable County land use regulations in
effect at the time of application.
FINDINGS
The proposed FPA is compliant with the following conditions:
The proponent has paid the prescribed fees.
The proponent has filed a complete, signed application.
A map has been received that complies with the requirements of 11.05.120:
(I) Harvest boundaries and tree retention areas.
(II) The approximate location of any structures.
(III) The location of all existing and proposed streets, right-of-ways, easements, skid
roads, haul roads, and landings within the proposal.
(IV) The location of future land development including stormwater management
facilities and vegetation to be retained for site landscaping, open space, wildlife
habitat, screening, and/or buffers.
(V) Site topography at contour intervals of 40 feet.
(VI) Critical areas and critical area buffers regulated pursuant to the Critical Areas
Ordinance.
(VII) Drainage ways and culverts.
(VIII) Site area targeted for further harvest including proposed timing.
(IX) North arrow and scale shall be shown on all site plans. The scale shall be no
smaller than one inch to 200 feet.
That this FPA is in conformance with the following Mason County ordinances:
11.05
That the proposed FPA involves .29 acres on a single parcel.
That the notifications required by 11.05.060 have been made if applicable.
Note: Harvest unit is greater than 500 ft from a State Park.
Mason County Resource Ordinance
1
_X_That at the issuance of this permit will not result in a violation of the Mason
County Resource Lands and Critical Areas Ordinance. The site was inspected by
Michael MacSems of the Mason County Planning Department who determined
that any critical area buffer and/or steep slope issues have been resolved.
NOTE: This FPA is located within a Fish & Wildlife Habitat buffer. The logging
and subsequent development was reviewed in Mason County Environmental
Permit#2018-00008 by Planner Ron Buckholt. Impacts of this logging and land
clearing will be mitigated through the implantation of a Habitat Management
Plan.
Geo-Technical Report/Assessment Review
A Geo-Technical__ _Report(check one)was written by
and a submittal checklist was approved by Michael MacSems
of Mason County DCD on
Note: Geo-review not required for FPA.
Washington State Department of Transportation
_X_A DOT Access Permit is not required for this proposal.
A DOT Access Permit is required for this proposal.
Date Approved by DOT:
NOTE: Existing access onto SR 106.
Mason County Road Access Permit
Road Access Permits were issued by Mason County Public Works on
N/A
Shoreline Master Program
That, if applicable, all activity under this application are in conformance with the
Mason County Shoreline Master Program and has a shore line designation of
Residential
Note: only a sliver of the NW corner of this site is located in the 200'shoreline
jurisdiction.
State Environmental Policy Act
2
This application for FPA#2018-00012:
_X_Has been reviewed for SEPA compliance under case#: SEP 2018-00028.
Is SEPA exempt.
_DNS
X MDNS
Note:As of 1117118, SEPA issuance is pending with Ron Buckholt.
Stormwater Management
A Stormwater and Erosion Control plan written to the specifications of the 2012
WSDOE Stormwater Manual by , as well as a submittal checklist was
reviewed of DCD and he approved a submittal checklist on
NOTE: Stormwater Requirements to be addresses through over all site
development package.
Permission from Underlying Property Owners:
Yes—Signed by Ray Nelson, owner's representative.
CONCLUSION
In conclusion,this application for Class IV General Forest Practices is consistent with the
above criteria and that the public uses and Mason County has fulfilled its statutory
obligations.
RECOMMENDATIONS
I,being the Director of the Mason County Community Services,hereby attest to and
certify that appropriate provisions have been made for this Class IV General Forest
Practices Application and hereby recommend approval. In addition to these facts
evidenced by the contents of the file for this Forest Practice Application.
Signed,
David Windom, Director Community Services Dept. Date
A�Aj hL �/Za 5
ichael MacSems, PPA viewer Date
3