Loading...
HomeMy WebLinkAboutSHR2003-00024 - SHR Permit / Conditions - 1/28/2004 ON.STA MASON COUNTY c -fr- DEPARTMENT OF COMMUNITY DEVELOPMENT 111 0 s ° Planning Division a T Z P O Box 279, Shelton,WA 98584 N � �oJ Y C,o~ (360)427-9670 1864 Case No.: SHR2003-00024 SHORELINE PERMIT STATUS: ISSUED Received: 11/19/2003 Issued: 1/28/2004 Expires: 1/28/2007 Type of Permit: Sub. Dev. Applicant: HARMONY HILL 7362 E SR 106 UNION, WA 997592 Location of Project: HARMONY HILL - UNION. From US 101 N. take SR 106 east past Union to address 7362 SR 106. Up paved driveway to site. Within Hood Canal and/or its associated wetlands. The projectwill be within shorelines of statewide significance. Shoreline Designation: Urban Parcel Number: 322334400040 Address: 7362 E STATE ROUTE 106 UNION Legal Description: W 1/2 GOVT LOT 1 S 9/57 EX TAX 683-C, 669-C 7362 & 7361 E HIGHWAY 106 UNION Project Description: Construction of storm water control facilities. Install 18" storm drain on property and connect to existing 36" main on State Route 106. The project will require trenching, bedding and backfilling, as well as installation of concrete anchors and upgrading of existing catch basin. This permit has been granted by Mason County persuant to the Shoreline Management Act of 1971 and nothing in this permit shall excuse the applicant from compliance with any other federal,state or local statutes,ordinances or regulations applicable to this project but not inconsistent with the Shoreline Management Act. (Chapter 90.58 RCW). This permit may be rescinded pursuant to RCW 90.58.140(7)in the event the permittee fails to comply with the terms and conditions hereof. CONSTRUCTION PURSUANT TO THIS PERMIT WILL NOT BEGIN OR IS NOT AUTHORIZED UNTIL THIRTY(30)DAYS FROM THE DATE OF FILING THE FINAL ORDER OF THE LOCAL GOVERNMENT WITH THE REGIONAL OFFICE OF THE DEPARTMENT OF ECOLOGY AND THE ATTORNEY GENERAL,OR UNTIL ALL REVIEW PROCEEDINGS INITIATED WITHIN THI RTY(30)DAYS FROM THE DATE OF SUCH FILING HAVE TERMINATED. RECEIVED STATE OF WASHINGTON [FF� 0 9 NO DEPARTMENT OF ECOLOGY MCCD - PLANNING PO Box 47775 a Olympia, Washington 98504-7775 • (360)407-6300 February 5, 2004 Gretchen Schodde Harmony Hill 7362 E SR 106 Union WA 98592 Dear Ms. Schodde: Re: Mason County Permit#SHR2003-00024 HARMONY HILL -Applicant Shoreline Substantial Development Permit#2004-SW-02440 The referenced Shoreline Management Substantial Development Permit has been filed with this office by Mason County on February 2, 2004. This permit authorizes the construction of a stormwater management system within the shoreline jurisdiction of Hood Canal. The system will include an 18-inch stormwater line with a connection to an existing 36-inch line at SR 106. The development authorized by the subject permit may NOT begin until the end of the 21-day appeal period, February 23,2004. The Shorelines Hearings Board(SHB)will notify you by letter if this permit is appealed. You can reach the SHB directly at(360)459-6327. Other federal, state, and local permits may be required in addition to the shoreline permit. If this permit is NOT appealed,this letter constitutes the Department of Ecology's final notification of action on this permit. If you have any questions I can be reached at(360)407-6520. Sincerely, Kim Van Zw 1 nburg Shoreline Specialist Shorelands and Environmental Assistance Program KVZ:dn 02440SDP.DOC cc: Scott Longanecker,Mason County