HomeMy WebLinkAboutSHR2003-00024 - SHR Permit / Conditions - 1/28/2004 ON.STA MASON COUNTY
c -fr- DEPARTMENT OF COMMUNITY DEVELOPMENT
111
0 s ° Planning Division
a T Z P O Box 279, Shelton,WA 98584
N �
�oJ Y C,o~ (360)427-9670
1864
Case No.: SHR2003-00024 SHORELINE PERMIT
STATUS: ISSUED
Received: 11/19/2003
Issued: 1/28/2004
Expires: 1/28/2007
Type of Permit: Sub. Dev.
Applicant: HARMONY HILL
7362 E SR 106
UNION, WA 997592
Location of Project: HARMONY HILL - UNION. From US 101 N. take SR 106 east past Union to
address 7362 SR 106. Up paved driveway to site.
Within Hood Canal and/or its associated wetlands. The projectwill be within shorelines of
statewide significance.
Shoreline Designation: Urban
Parcel Number: 322334400040
Address: 7362 E STATE ROUTE 106 UNION
Legal Description: W 1/2 GOVT LOT 1 S 9/57 EX TAX 683-C,
669-C 7362 & 7361 E HIGHWAY 106 UNION
Project Description: Construction of storm water control facilities. Install 18" storm drain on
property and connect to existing 36" main on State Route 106. The project
will require trenching, bedding and backfilling, as well as installation of
concrete anchors and upgrading of existing catch basin.
This permit has been granted by Mason County persuant to the Shoreline Management Act of 1971 and nothing in this permit shall excuse the
applicant from compliance with any other federal,state or local statutes,ordinances or regulations applicable to this project but not inconsistent
with the Shoreline Management Act. (Chapter 90.58 RCW).
This permit may be rescinded pursuant to RCW 90.58.140(7)in the event the permittee fails to comply with the terms and conditions hereof.
CONSTRUCTION PURSUANT TO THIS PERMIT WILL NOT BEGIN OR IS NOT AUTHORIZED UNTIL THIRTY(30)DAYS FROM THE DATE
OF FILING THE FINAL ORDER OF THE LOCAL GOVERNMENT WITH THE REGIONAL OFFICE OF THE DEPARTMENT OF ECOLOGY
AND THE ATTORNEY GENERAL,OR UNTIL ALL REVIEW PROCEEDINGS INITIATED WITHIN THI RTY(30)DAYS FROM THE DATE OF
SUCH FILING HAVE TERMINATED.
RECEIVED
STATE OF WASHINGTON [FF� 0 9 NO
DEPARTMENT OF ECOLOGY MCCD - PLANNING
PO Box 47775 a Olympia, Washington 98504-7775 • (360)407-6300
February 5, 2004
Gretchen Schodde
Harmony Hill
7362 E SR 106
Union WA 98592
Dear Ms. Schodde:
Re: Mason County Permit#SHR2003-00024
HARMONY HILL -Applicant
Shoreline Substantial Development Permit#2004-SW-02440
The referenced Shoreline Management Substantial Development Permit has been filed with this office by
Mason County on February 2, 2004. This permit authorizes the construction of a stormwater
management system within the shoreline jurisdiction of Hood Canal. The system will include an 18-inch
stormwater line with a connection to an existing 36-inch line at SR 106.
The development authorized by the subject permit may NOT begin until the end of the 21-day appeal
period, February 23,2004. The Shorelines Hearings Board(SHB)will notify you by letter if this permit is
appealed. You can reach the SHB directly at(360)459-6327. Other federal, state, and local permits may
be required in addition to the shoreline permit.
If this permit is NOT appealed,this letter constitutes the Department of Ecology's final notification of
action on this permit. If you have any questions I can be reached at(360)407-6520.
Sincerely,
Kim Van Zw 1 nburg
Shoreline Specialist
Shorelands and Environmental
Assistance Program
KVZ:dn
02440SDP.DOC
cc: Scott Longanecker,Mason County