HomeMy WebLinkAboutBLD2012-00420 Final - BLD Inspections - 4/25/2014 o CONCRETE Piping MANUFACTURED HOME
CD Interior-Date By
N Footings 1 Setbacks F-ide-or-Date By Ribbons
o Data ByINSULATION Date By
o Foundation WaIts BG/SLAB INSULATION Set-up
Date By Date By Date By
FRAMING Floors FIRE DEPARTMENT
Date BY Date icy
Date walls DECKS
PLUMBING Date By ate BY
Groundwork Vault TANKS
Date BY Bate By
Date By Attic
a.w.v
Date By OTHER
Date By DRYWALL Type:
Date BY
water Line Date BY Type.
Date By Int,Brace Wall Date By
en MECHANICAL Date ByFINAL INSPECTION
CD Fire Seperation
CD Date By Date BY Date
m
Pass or Req uest Inspect.
CD Type of insp. Fail Date Date Done By Comments
0 /
CD
Cn
v
o '
O
Q
{
Cl)
O
5
N
CD
3
v
cn
0