HomeMy WebLinkAboutBLD2007-01898 Replace Ramp, Float, and Piling - BLD Permit / Conditions - 1/24/2008 Inspection Line(360)427-r-
j MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670,ext.352
Mason County Bldg. III 426 W. Cedar P.O. Box 186
Shelton, WA 98584
IP10 RESIDENTIAL BUILDING PERMIT
BLD2007-01898
OWNER: NICK KLOZE RECEIVED: 11/1/2007
CONTRACTOR: LAKESHORE CONSTRUCTION LICENSE: LAKESC"155JA EXP: 4/4/2009 ISSUED: 1/24/2008
SITE ADDRESS: 7627 E STATE ROUTE 106 UNION EXPIRES: 7/24/2008
PARCEL NUMBER: 322334400020
LEGAL DESCRIPTION: TR 2 OF E1/4 OF LOT 1 &T.L.'S
PROJECT DESCRIPTION: DIRECTIONS TO SITE:
replacement ramp, float and one piling Hwy 106, one mile east of Alderbrook
General Information Construction &Occupancy Information Square Footage Information
No. of Bedrooms: Type of Constr.: V-B
Type of Use: SF Insp.Area: No. of Bathrooms: Occ. Group: U-1 Lot Size: Deck:
Type of Work: ACC Fire Dist.: 6 No. of Stories: Occ. Load: Building:
Valuation: Building Height: Occ. Status: Basement: dock, ram
Manufactured Home Information Setback Information Shoreline&Planning Information
_ Water Body: Hood Canal
Make: Length: Ft. Front: Ft. Shoreline: Ft SEPA?: Yes
Rear: Ft. Slope: Ft. Shoreline Desig.: Urban
Model: Width: Ft. Side 1: Ft.
Year: Serial No.: I Side 2: Ft. Comp. Plan Desig.: Rural
BLD2007-01898 Please referto the following pages for conditions of this permit. 1 of 6
4b Plumbing Fixtures Mechanical Fixtures FEES
Type Qty. Type Qty. Type By Date Amount Receipt
Plan Check Fee TAM 11/1/2007 $154.21 B12007000
Plan Check Fee TAM 11/1/2007 $154.21 B12007000
Plan Check Fee TAM 11/1/2007 $154.21 612007000
Building State Fee TAM 11/1/2007 $4.50 B12007000
Building State Fee TAM 11/1/2007 $4.50 612007000
Building State Fee TAM 11/1/2007 $4.50 612007000
Planning Review Fee TAM 11/1/2007 $170.00 612007000
Planning Review Fee TAM 11/1/2007 $170.00 B12007000
Planning Review Fee TAM 11/1/2007 $170.00 B12007000
Building Permit Fee TAM 11/1/2007 $237.25 B12007000
Building Permit Fee TAM 11/1/2007 $237.25 612007000
Building Permit Fee TAM 11/1/2007 $237.25 612007000
NSF check Fee TCS 11/9/2007 $30.00 B12007000
ADJUST--Plan Check Fee RTB 1/16/2008 $27.30 612008000
ADJUST--Building Permit Fee RTB 1/16/2008 $42.00 612008000
Total $1,797.18
CASE NOTES FOR
BLD2007-01898
CONDITIONS FOR
BLD2007-01898
BLD2007-01898 Please referto the following pages for conditions of this permit. 2 of 6
1) Floatation
The surface of floating structures shall be a minimum of eight inches about the surface of the water. Floatation for the structure shall be entirely enclosed
and contained to permanently prevent the breakup or loss of the floatation material into the water. X
Erosion Control
Erosion control measures must be in place prior to any clearing, grading, or construction. These control measures must be effective to prevent soil from
being carried into surface water by stormwater runoff. Sand, silt, clay particles, and soil will damage aquatic habitat and are considered pollutants when
discharged to waters of the state.
X Sediment
Any Any discharge of sediment-laden runoff or other pollutants to waters of the state is in violation of Chapter 90.48, Water Pollution Control, and WAC
173-201A, Water Quality Standards for Surface Waters of the State of Washington, and is subject to enforcement action.
X I_r/ �—
Construction
During construction, all releases of oils, hydraulic fluids, fuels, other petroleum products, paints, solvents, and other deleterious materials must be
contained and removed in a manner that will prevent their discharge to waters and soils of the state. The cleanup of spills should take precedence over all
other work on the site.
X 1 f 'e--
Debris
Proper disposal of construction debris must be on land in such a manner that debris cannot enter Hood Canal or cause water quality degradation of state
waters. r�
X T( <_-
Backfill
All trenches, depressions, or holds created in the intertidal area shall be backfilled prior to inundation of tidal waters.
X
Stormwater
All stormwater discharges must be constructed in a manner that will not cause scouring on the beach.
X '. j
2) Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal fasteners,
connectors, and flashing. Install metal connectors approved for contact with the new types of pressure treated material.
X 7i 'L_
3) Approvedperdimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the structure.
X '`j / iL_
4) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division.
There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at
1-800§47-Q982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law.
X �lC —
BLD2007-01898 Please referto the following pages for conditions of this permit. 3 of 6
5) All other necessary permits from Mason County, Washington State and/or Federal Agencies that are required for this proposed development and
construction must be obtained PRIOR TO SAME DEVELOPMENT AND CONSTRUCTION. X ' i
6) All approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will
not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour) will be charged and must be collected by the Building
Department prior to any further inspections being performed or approvals granted.
X Ti ?
7) Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28.
X T7 .
8) The plan review check list and corrections are part of the approved plans and must remain thereto. It is the responsibility of the applicant to make the
corrections indicated on the plans. Once the plans are marked "APPROVED", they shall not be changed or altered without authorization from the Building
Official. The permit holder is responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or
removal of approved documents will result in failure of required building inspections.
X 7 / Z _.
9) This structure is approved as un-heated space. If at any time this building is to be used for anything other than what it is approved for, a change of use
permit shall be applied for, reviewed and approved prior to the change.
X T_ Z-
10) THE FOUNDATION SYSTEM SHALL BE PLACED ON UNDISTURBED, NATIVE SOIL. X � �---
11) The "approved" site plan is required to be on-site for inspection purposes. If an inspection is requested and the"approved" site plan is not on site, then
approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour) will be charged and shall be collected by the
Building Department prior to any further inspections being performed or approvals granted.
X %'.�
12) Concrete used for basement walls, foundation walls, exterior walls, porches, carport slabs, steps exposed to the weather, garage floor slabs and other
vertical concrete work exposed to the weather shall have a minimum compressive strength of 3000 psi (IRC Table R402.2).
X
13) This structure is limited to U-occupancy use only(private garages, carports, sheds, and agricultural buildings.) Any other use will be in violation of the
international codes and Mason County Regulations unless a "Change of Use" permit is applied for, reviewed and approved.
X 12-
14) Any changes in proposed construction shall be reviewed by the engineer or architect of record and submitted in writing to the Mason County Building
Department prior to construction. All engineering and/or architectural documents are a part of the approved set of plans and shall remain attached
thereto. If documents are removed, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour) will be
charged and shall be collected by the Building Department prior to any further inspections being performed or approvals granted.
X - /
BLD2007-01898 Please referto the following pages for conditions of this permit. 4 of 6
15) International Building Code. In addition to the inspections required by Chapter 1 of the International Building Code, the owner or the engineer or architect
of record acting as the owner's agent shall employ one or more special inspectors who shall provide inspections during construction on the types of work
listed under IBC, section 1704. The special inspectors' duties & responsibilities shall be as specified in Chapter 17. Required only if pile height exceeds
10'. If pile height exceeds 10' Engineer of record needs to verify piles are driven to point of refusal.
X ,
16) All construction must meet or exceed all local ordinances and the international codes requirements as adopted and amended by Mason County and the
State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in
permit revocation.
X r1
17) Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact
adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the
stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further
information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access
connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which
is proposed to be located within 25' of a Mason County road right of way, it is suggested to contact that office to review future planned work which may
affect your project._
X Tim— -
18) All changes to "approved" building plans that effect compliance with the international codes as amended and adopted, or any other Mason County
ordinance or regulation, must be reviewed and approved by Mason County prior to construction.
X -7
19) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED
BUILDING CODE.
The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance
with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building
Inspector shall be made prior to requesting additional inspections.
X
20) All property lines shall be clearly identified at the time of foundation inspection. X T
21) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure
to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with
Mason County ordinances and building regulations.
X 7�.
22) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for
action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit
holder have prevented action from being taken. No more than one extension may be granted.
X ' Z_
23) This parcel is located in a smoke management zone. Please contact a fire warden at (360) 427-9670 ext. 459 for further information.
X
BLD2007-01898 Please refer to the following pages for conditions of this permit. 5 of 6
This permit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at anytime after work is
commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of
work is by means of a progress inspection.The owner or the agent on the owners behalf, represents that the information provided is accurate and grants employees of Mason County access to
the above described property and structure for review and inspection.
OWNER OR AGENT: _ DATE:
BLD2007-01898 Please referto the following pages for conditions of this permit. 6 of 6
o CONCRETE MECHANICAL MANUFACTURED HOME
o Date By O
of Footings 1 Setbacks Gas Piping Ribbons m
o Interior Date By interior-Date By Z
� Exterior Date By Exterior-Date By Set-up
Point Load i Isolated Footings INSULATION Date By
Date By Data SLAB INSULATION By
FIRE DEPARTMENT
Foundation Waits Floors Date By
Date By Data By DECKS
FRAMING Walls Date: By
Date By Data By PROPANE TANKS
PLUMBING vault Date L3y
Date By OTHER
Groundwork Attic
Type-
Date By Date By Date By
D.w.v DRYWALL Type.
Int.Brace Wall Date By W
By Date By r
FINAL INSPECTION
Water Line Fire Separation
O
L'afe By
Date By Date ^z,( lag By O
m
`° Pass or Request Inspect.
Type of Insp. Fail Date Date Done By Comments _ 00
00
o
o�
(D
0
g
a
a
U)
0
('
m
I
0
i
' MASON ItObNTY PERMIT NO.
BUILDING PERMIT APPLICATION
426 W. Cedar • PO. Box 186, Shelton, WA 98584
Shelton (360) 427-9670 • Belfair (360) 275-4467 • Elma (360) 482-5269
On the web www.co.mason.wa.us
APPLICANT INFORMATION CONTRACTOR INFORMATION
j Owner P Company Name K O 1Si1 C.� &0o'_
Mai g Addres 09 12nu, Maili A ress O 6C>L I OS
,01
City ( StateWok _Zip Code 00 City State Zip Code
Phonef0Ak -TM 3Ln - Other Ph.27S-5i)ZI Phone S' a Other Ph.
Lien/Title Holder Contractor Reg. Pr' tf5J!�Exp.
E mail address E Mail Address
Drivers Lic.# DOB Drivers Lic.# DOB
SEPTIC/WATER SYSTEM INFORMATION - Connect to New Septic Existing Septic X
Connect to Water System Name of Water System
Well_Y—, Water System Name of Water System
PARCEL INFORMATION 2F Parceeo. T Fire District
Legal Description T
Site Address (Please include street name, stre number and city) w 'S;
Directions to site fl w\ A 0i mot O r '�'1 }
Will timber be cut and sold in parcel r paration?Yes N
Is property within 200'of Saltwater Lake River/Creek Pond
Wetland Seasonal Runoff Stream Slopes or Bluffs > 15%
Is this permit submittal the result of a Stop Work Notice,Correction Notice or other enforcement action?Ye -
TYPE OF JOB - New Add Alt Repair Other PRIMARY RESIDENCE ❑ SEASONAL
Use of Building Describe Work � w F=to
No. of Bedrooms No. of Bathrooms Square Footage - 1st Floor 2nd Floor
3rd Floor Basement Deck Covered Deck Other Sq.ft. '
Garage Attached Detached Carport Attached Detached
MANUFACTURED HOME INFORMATION - Make Model Year
Length Width Serial No. No.of Bedrooms No. of Bathrooms
Type of Heat Purchase Price$ Replacement Unit? Yes/ No
Installer Name Certification No.
OWNER/BUILDER Acknowledge§submission of inaccurate information may result in a stop work order or permit revocation.
Acknowledgement of such is by signature below.I declare that I am the owner,owners legal representative,or the contractor.I further
declare that I am entitled to receive this permit and to do the work as proposed in the application.I declare that I have obtained the permis-
sion from all the necessary parties.If permission is required from any easement holder or any other party in interest regarding this applica-
tion or the work proposed in the application,I have obtained permission from them to apply for this permit and conduct the work proposed.
X Date: 07
Ow �/Ow ers Representative's/Contractor (indicate which one)
I
FOR OFFICIAL USE BEYOND THIS POINT
Accepted by: Planning I'd Ck# Date Bld Pd Receipt No.
DEPARTMENTAL REVIEW APPROVED DENIED NOTES
Building Department
Planning Department
Environmental Health Department
Public Works Department
Fire Marshal
FEES
Building Permit Fee .a Site Ins ection
Plan Review Fee S— EH Review Fee
Plumbing & Base Fee Planning Review Fee
Mechanical & Base fee Other
Wood /Gas/ Pellet Stove Fee State Fee S 0
Violation Fee 'G Pre-Paid at Submittal
Valuation $ TOTAL FEES