Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
MIS95-0477 2 Gas Pumps - MIS Permit / Conditions - 7/20/1995
v MASON COUNTY Mason County Bldg, III 426 W. Cedar P.O. Box 186 Shelton, Washington 98584 M 1 .�CF=— L_ L— A N E C3 LJ S P t R M 1 —1— FOR INSPECTIONS CALL 427--9670 MI S95-0477 PARCEL :4201812901040 PLAT : D I V : BLK : LOT : JOB ADDRESS : W 7480 SHELTON MATLOCK RD SHELTON APPLICANT : DAYTON GROCERY 427--5527 OWNER : DAYTON GROCERY 427--5527 LEGAL : TO 4 Of NN NE TO A OF S1 #575 —_ PROJECT DESCRIPTION : 2. GAS PUMPS PROJECT LOCATION : WEST ON SHEITON MATL.00K ROAD 7 1 /2 MILES TO DAYTON STORE (SITE LOCATED DIRECTLY BEHIND STORE ) . PROJECT NOTE,', . TYPE AMOUNT BY 'DATE RECEIPT PRMT $ 0 00 KS 07/20/95 39695 MCFL $ 12 .00 KS 07/20/95 39695 MCBS $ 15 00 KS 07/20/95 39695 PRMT $ ?_5 .00 KS 07120195 39695 TOTAI S 00 OWNER OR AGENT__v_._._n.�__.__.__�_. —_ OAT 118 DINT, rer l41i1112 COMPI. 1 ANCE TO ATTACHED CONDITIONS IS REQUIRED CONCRETE MECHANICAL MOBILE HOME Footings-Setback date by Ribbons date by Gas Piping date b Foundation Walls date by Set Up date by INSULATION date by BG/SLAB Insulation Floors Final date by date by date by FRAMING Walls FIRE DEPT. date by date by date by PLUMBING Attic OTHER Groundwork date b date by D.W.V. WALLBOARD NAILING date by date by Water Line FINAL INSPECTION date by date - — 5 by date by mc ��� ,Tv��/�s �` �Oi✓��r �o-,D s d�-��.� /lam �-�i�i�s a.�.Lk�pi�l 55, - S�yn��/ MASON COUNTY Mason County Bldg, III 426 W. Cedar P.O. Box 186 Shelton, Washington 98584 Case No . : MIS95-0477 For : DAYTON GROCERY Paqe : 1 1 ) 1 . PROVIDE A CLEARLY LABFLED PUMP MASTER SWITCH WITHIN 75 FEET , BUT NO CLOSER THAN 1` FEET TO THE DISPENSERS . 2 . PROVIDE A 2A-20BC RATED DRY CHEMiCAI. FIRE EXTINGUISHER WITHIN 75 FEET FROM THE DISPENSER . 2) All approved p l anR are required to be on-site for Inspection purposes . If I nF:peot i on is called for and plans are not on site, Approval WILL NOT be granted . In addition, a Re- Inspection fee in the amount of $30 .00 per hour (minimum 1 hour ) wi i i be charged and must be collected by this department prior to any further inspections being performed or approval granted . 3 ) PURSUANT 'TO 1991 UNIFORM BUILDING CODE , SECTION 305(C) AND SECTION 513 , ALL SITES MUST I1AVE APPROVED NUMBERS OR ADDRESSES PROVIDED IN SUCH A POSITION AS TO BE PLAINLY VISIBLE AND LEGIBLE FROM THE STREET OR ROAD FRONTING THE PROPERTY . MASON COUNTY BUI !_DING DEPARTMENT REQUIRES THAT THIS BE COMPLETED PRIOR TO CALLING FOR ANY SITE INSPECTIONS . A REINSPECTION FEE , BASED ON RATES IN TABLE 3A OF THE 1991 UNIFORM BUILDING CODE WILL. BE ASSESSED IF OWNER/CONTRACTOR FAIL.S TO POST ADDRESS ON SITE PRIOR TO REQUESTING INSPECTIONS . i r e . CONCRETE MECHANICAL MOBILE HOME Footings-Setback date by Ribbons date by Gas Piping date b Foundation Walls date by Set Up date by INSULATION date by BG/SLAB Insulation Floors Final date by date by date by FRAMING Walls FIRE DEPT. date by date by date by PLUMBING OTHER Groundwork Attic date b date by D.W.V. WALLBOARD NAILING date by date by Water Line FINAL INSPECTION date by date by date by MASON COUNTY Mason County Bldg. III 426 W. Cedar P.O. Box 186 Shelton, Washington 98584 X 4 ) ALL CONSTRUC I 1 ON MUST MEET OR EXCEED ALL LOCAL. CODES AND UEiC; REQ�J R�FNTS-- X_. .._. -__ _ ------ 5 ) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQI)I RED PER MASON COUNTY BUILDING DEPARTMENT AND UNIFORM BUILDING CODE .x '� CONCRETE MECHANICAL MOBILE HOME Footings-Setback date by Ribbons date by Gas Piping date b Foundation Walls date by Set Up date by INSULATION date by BG/SLAB Insulation Floors Final date by date by date by FRAMING Walls FIRE DEPT. date by date by date by PLUMBING OTHER Groundwork Attic date by date by D.W.V. WALLBOARD NAILING date by date by Water Line FINAL INSPECTION date by date by date by a � 3ov� Permit No. 5 � P4�V� MASON COUNTY ° PLUMBING/MECHANICAL PERMIT APPLICATION 426 W. Cedar/P.O. Box 186, Shelton, WA 98584. 427-9670 PLEASE PRINT #1 Owner V76 Phone# Site Address (7 City St Zip Directions to Job Site ' 421' AJ Owner Mailing Address City St Zip Lien/Title Holder IO J4 Address City St Zip #2 Contractor Name �� � D�F,_.L9� Contractor Reg. Address QO . Z)X Expiration dat J I If2� City U& St WIA, _Zip-qR53 ( Phon #3 Parcel No. Legal Description #4 Use of buildin ` Describe work �e �F #5 Type of Job: New Add Alt Repair Plumbing Fixtures ($3 each) F� Mechanical Fixtures ($6 each) No._Toilets CIRCLE FUEL TYPE: Gas, Electric, _Bath Basins Heatpump, Other _Bath Tubs No uni s Fees _Showers R;:— Furn BTU _Hot Water Htr r Heatpumps _Laundry Washer C Vent Systems _Sinks r- Spot Vent Fans _Floor Drains (n w MNQl Boilers/Compressors _Laundry Basins M C:7_ HP _Dishwasher C CiER No. Air Handling Units _Disposal cfm# _upinals M NN Other - they WtF5 U) a _ Gas Outlets _ Wood, Gas, Pellet Stove 25.00 Permit Basic Fee 15.00 1 *TAN aS'_oa TOTAL PLUMBING $ _Z Pumps iZ, ov Permit Basic Fee 15.00 TOTAL MECHANICAL $ SP-ou No Basic Fee for Wood, Gas, Pellet Stove NOTICE: This permit becomes null and void if work or construction authorized is not commenced within 180 days or if construction or work is suspended or abandoned for a period of 180 days at any time after work is commenced. Proof of continuation of work is by means of a progress inspection. NOTE: If this permit application includes the placement of a fuel tank, heat pump or other unit to be located outside of the existing structures, a plot plan MUST be submitted as required below: Show following on the site plan below: Lot Dimensions, Existing Structures, Structure Setbacks, Water Lines, Septic Systems, Flood Zones, Wells, Shorelines, Easements, Name of Flanking & Fronting Streets. Indicate directional by N, S, E, W, etc. l OWNERS AFFIDAVIT CONTRACTORS AFFIDAVIT I CERTIFY THAT I AM EXEMPT FROM THE REQUIREMENTS OF I CERTIFY THAT I AM A CURRENTLY REGISTERED CONTRAC- THE CONTRACTORS REGISTRATION LAW RCW 18.27,AND AM TOR IN THE STATE OF WASHINGTON AND I AM AWARE OF THE AWARE OFTHE MASON COUNTYORDINANCE REQUIREMENTS ORDINANCE REQUIREMENTS REGULATING THE WORK FOR FOR WHICH THIS PERMIT IS ISSUED AND THAT ALL WORK WHICH THE PERMIT IS ISSUED AND ALL WORK DONE WILL BE IN DONE WILL BE IN CONFORMANCE THEREWITH. NO CHANGES CONFORMANCE THEREWITH. NO CHANGES SHALL BE MADE SHALL BE MADE THOUTF R APPROVALFROM WITHOUT FIRST OBTAININ APPROVAL FROM THE BUILDING THE BUILDING EP DEPA ENT. X OWNER CX BY DATE DATE Return permit to: Department of General Services 426 W. Cedar/P.O. Box 186, Shelton, WA 98584 427-9670/1-800-562-5628 FOR OFFICIAL USE ONLY: Accepted by: Receipt No. Referred To DEPARTMENTAL REVIEW FOR OFFICIAL USE ONLY Proposal Proposal Approved Denied Planning: Building: 7 Fire Marshal: 0 ���� Page No. 1 CONDITIONS/CORRECTIONS FOR CASE NO.: MIS95-0477 DAYTON GROCERY .............. 14/95 1) FIRE PROTECTION REQUIRE 'ITS: -- 1. PROVIDE A Cd4 LABELED PUMP MASTER SWITCH WITHIN 75 FEET, BUT NO CLOSER THAN 15(A T t0 THE DISPENSERS.;1 1. PR VIDE A 2A-20BC RATED DRY CHEMICAL FIRE EXTINGUISHER WITHIN 75 FEET FROM THE DISPEN I UNDERGROUND STORAGE TANK For Office Use Otily 30 DAY NOTICE a� y x See back of form for iltStructions I1 3 X I N 0 ION 1 T r Site EF Please 0 the appropriate box 0 # E F A 0 T M EN T O E C U L U C Y L� Intent t to ln to Close Lj to Close ,(J Site ID Number(on invoice or available from Ecology it the tank is registered): Site/Business Name: D�tV r c �l� ° <- c► y {�/ ��' �o S 1i r�4..,�-- M q t A,ck A� c;e,i( Owner/Operator � 36. I2 -5 5 Site Address: s 1 o Telephone: Ce ( ) 7 7 Cityht� - o e • ' • TANKS TO BE CLOSED TANKS TO BE INSTALLED This section to''be filled"out ONLY it tanks are being removed This section to be filled out ONLY Tank ID Projected Tank Substance Date Is there It no, if tanks are being Installed Closure Capacity Stored tank product in date tank Tank ID A rox. Date last used the tank? was p (yes/no) pumped Ins all Date 7� 4 — • • • T his section to be tilled out ONLY If tanks are being Installed //,I // pp vy Contact Name:Service Provider. ,f7_ 9n�(o/5 /-c�r�%�-t..t �1 /`r �. � Telephone: 73 6 Address: 7 Street P.O.Box City Slate ZIP-Code • • • • C • • 7 his section to be filled out ONLY If tanks are being removed Sarvice Provider: f 7 rr" �.:.,, «�•�4'_. Contact Nstnra: f St+sot e P.O.bax } „ IP This Imm will be returned to this eddren UST OWNER/ I Lt OPERATOR ar t 1 / MAILING ADDRESS_I,✓. 7��Ff0 S/CI��+�1' ��r �/0C_ `\ / ) Street S� t L yr O' fit/ ? S / Once validated by Ecology,this form serves as your city stale ZIP-Code temporary permit for the[anks listed above. Plensc type or print information ECY 020-33 I r"1 �J � I 3� I I 1 ? G � I IM I 1 I � 00 P � FACM Y,� r T Per ��,. �'�1.✓iZ'.-.:. F�L�.�_�'K�_�?'S�J� _a ��Z-� '1�� �., (moo_�o1�J,� w��.�,,__A1571JiQg- r,3v«.,oi�✓4 t � I 1 CONTRACTOR LIC CC-01-HA-RO-LS P 21007 S t1a(oCERTIFIED et releum equipment E E D EQUIPMENT SPECIAL IS T S t CRAIG HATCH '17�n1 Sales Manager _ .W P.O. Box 449 Offlce: 206-736-0119 1403 S. Tower or 1-800-736-9575 --- Centralia, WA 98531 FAX: 206-736-6768 RELIABLE STEEL FABRICATORS, INC. SPE00 P. 0. BOX 9 OLYMPIA, WA 98507 (205) 352-7575 This Spec-Data sheet conforms >0 to editorial style prescribed by The Construction Specifications Institute. The manufacturer is y responsible for technical ac- Q? curacy. cn N Y � Z 1. PRODUCT NAME U Sti-P3® Protected Single Wall Un- c derground Steel Storage Tanks p .o V) 0 2. MANUFACTURER Q o Licensed Manufacturers of Sti-P3® U U Protected Underground Storage o ' Tanks are represented by: Q o Steel Tank Institute 570 Oakwood Road Lake Zurich, IL 60047 c Phone: (708) 438-8265 J 3. PRODUCT DESCRIPTION sti-P3(& cathodically protected M underground steel storage tanks 0 !m are normally fabricated in con- a formance with the latest edition c� of Underwriters' Laboratories, '^ -� Inc., Standard for Safety UL 58 aro a' (Steel Underground Tanks for c w _ Flammable and Combustible Liquids). Applications are in strictco ^* conformance with sti-P3® specifi- Protected underground steel rosive Soil r' cations. sti-P3® tanks are installed storage tanks with Sti-P3® cor- 40 CFR 280 provides in-depth c wherever fuels, chemicals or rosion protection offer a 30 year technical requirements for un- derground o0 other liquids are stored, such as limited warranty and are available storage systems. The tv Q) Q gasoline service stations, airports, in various capacities and dimen- Sti-P3® specification for under- ' " to truck terminals, industrial plants sions. Standard sizes range from ground storage tank fabrication is -a and large commercial buildings. 550 to 50,000 gallons. Other sizes cited in this federal document as sti-P3® single wall tanks are com- can be custom fabricated (see an acceptable standard. a patible with known and antici- tables). All Sti-P3® tanks are shipped W pated liquid fuels, including The sti-P3® system is pre- with a means for monitoring �— methanol and ethanol-blend gas- engineered. All tanks are fabri- cathodic protection, Protection olines. cated and completely fitted at the Prover 1, PP28 or a custom moni- C If the product to be stored in manufacturer's plant. Combined toring station are acceptable. — the tank is corrosive to carbon in the sti-P3 system are the three c 4. TECHNICAL DATA steel, an appropriate interior lin- most widely accepted and estab- ing compatible with the material lished procedures for exterior The Sti-P3 trademarked name c D • should be specified. Check with corrosion protection: heavy duty for these specially fabricated pro- M 0 the manufacturer for recom- protective dielectric coating, tected underground steel storage �® mendations. cathodic protection and electrical tanks is derived from the three o N Underground storage of prod- isolation. forms of corrosion prevention ructs has the operating advantages Tanks are manufactured under procedures used to protect the 0 O of reducing vapor losses by keep- the trademark sti-P3® and are pre- tanks. 0 ing temperature variations to a engineered for protection against Electrical Isolation: Dielectric n minimum. It also can reduce exterior corrosion. nylon reducing bushings or c m safety and fire hazards when Federal Law (P.L.) 98-616 man- flange isolators are used in each n D compared to above ground stor- dates that all new underground tank opening to isolate the tank Z age. storage tanks must be: from connecting steel pipes. This �- N The ten-point Spec-Data*format has been reproduced • Structurally Sound prevents stray currents from en- from publications copyrighted by CSI,1%4,1%s,1%e, Product Compatible tering the tank through the piping o 1%7,and used by permission of The Construction Speci- — fications institute,Alexandria,VAM14. • Corrosion Resistant In Cor- system, and eliminates unneces- 13200 Optional Accessories sary anode current drain. Auxil- Compartment Bulk Heads Horizontal Coils iary cathodic protection design is Corrosion-Resistant Linings Interior Corrosion Prevention required for any steel pipe sys- Dished Heads Interior Ladders tems. Fill Tubes Internal Piping Electrically Insulating Exterior Flanged Nozzles Manway Protective Coating: Special coat- Heating Coils Masonry Supports ing significantly reduces the Hold Down Anchors Over-Fill and Piping Sumps tank's exposure to corrosion. It Hold Down Straps also reduces the amount of pro- tective current needed for cath- Factory testing odic protection. Every new coat- ing application must be tested in accordance with sti-P3® specifica- tions. Every coating application requires quality control inspec- tion such as dry film thickness readings. The coating is applied over the steel surface after abra- sive blasting to metal surfaces. This gives a profile within the Wet-film test to determine Dry-film thickness test for steel to enhance coating adhe- thickness of protective-coating. additional quality control check Sion. of protective-coating application. Cathodic Protection: Cathodic protection technology for under- ground storage has evolved from applications developed in the 1800s for the protection of metal ship hulls from corrosive sea- , Q water. Steel underground fuel pipelines since the 1970s have been required by law to employ cathodic protection to prevent corrosion. All steel will corrode if left un- protected underground. Cor- rosion is an electrochemical process in which steel will revert to its original energy state, iron ore,due to a reaction with the soil environment. Cathodic protection is an elec- trical method of preventing cor- rosion on steel structures. Gal- vanic anodes, which have a higher energy level than the steel, d can be connected to a coated steel structure to protect it against corrosion. Electrical current flows from the anode through the soil to the steel structure to be protected. As current flows onto the structure from the soil, the energy level of any exposed metal is raised to a point at which no more corrosion will occur on the structure.As the anode releases current, it cor- rodes to protect the steel. 5. INSTALLATION Illustrated installation instruc- tions and an installation checklist for sti-P30 tanks (document Steel Tank Institute developed the sti-P3®system in 1969 utilizing three proven corrosion #R821-90) are available from Steel prevention techniques; 1) Electrical isolation from attached structures, 2) Durable di- Tank Institute upon request. electric coatings and 3) Cathodic protection. Below is an abbreviated summary highlighting key aspects of the in- Provide concrete pads for nozzles and stallation instructions. manhole extending to grade or above Grade or paving Excavation and Bedding: The Minimum 24"36" excavation should be cleared of for traffic areas any hard or sharp material that Clean tamped earth t2 or sand backfll may damage tank coating. The beddingand backfill must be of Iandnert orpeagravected l) (sand or pea gravel) clean sand, pea gravel, No. 8 Hold down crushed stone (ASTM 448) or CYLINDRICAL TANK straps when regd.Equally equivalent. Excavation bottom space-icoat must be covered with one foot of same as tank beddinggraded and lev- Insulation holdal strapsmater eled and should extend at least one foot around the perimeter of Adjust or torque for equal the tank. lension Aboveground Air Test: Tem- Line of Anode porary plugs and thread pro- earth'°`mod tectors should be removed from tank openings. Apply compatible, Mn s° non-hardening pipe sealant to in- >.'�' • °� ° ternal bushing threads and install permanent metal plugs at unused Anchor bolt openings. Do not remove dielec- Concrete ballast pad Earth form may be used it hooked around tric bushings from any openings. when required hand shaped smooth.clean and dry reinforcing bars An air test of the tank above- ground is required. Pressure Tank should not be placed di- assure proper installation and en- should not exceed 5 PSIG. Apply rectly on concrete slab. A layer of suing cathodic protection of the soap solution to weld seams. Do bedding material at least 6" deep tank. Before pouring concrete or not apply a vacuum to tank. PEI- must separate the tank from the asphalt pad atop tank, a tank to RP 100-90 also provides air test slab. Special care should be taken soil potential reading with a high guidelines. Before placing tank in with hold down straps to separate impedance voltmeter and copper/ excavation, areas of coating must them from the tank by use of a copper sulphate reference elec- must be repaired with the coating separating pad made of inert di- trode must be taken. Reference touch-up kit provided. electric material. electrode must be placed in moist Tank Handling: Equipment to Backfilling: Backfill material soil directly above the tank. A lift the tank must be of adequate should be installed around entire reading of -850 millivolts or more size for proper tank handling tank to create a uniform homo- negative must be obtained to in- without dragging or dropping. geneous environment. Special dicate the tank is protected from Tanks should be carefully lifted care should be taken when in- corrosion. and lowered. stalling backfill along the bottom Record reading on warranty val- Anode Integrity: sti-P3® tanks sides of the tank. The bottom idation card and other permanent are equipped with either zinc or quadrant of the tank must be fully files. Additional readings should magnesium anodes. Zinc anodes and evenly supported by backfill. be taken within 6 months after in- can be used in all soils but mag- Final Air Test: Where air or stallation and then in 3 year inter- nesium anodes are only designed hydrostatic testing is required vals for the life of the installation. for use in soils with resistivities of after installation, the pressure Follow applicable local, state and 2000 ohms-cm or greater. Verify applied must not be in excess of 5 federal regulations for additional integrity of anode connection PSIG as measured at the top of requirements. Reference NACE prior to backfill. To assure im- the tank. RP-02-85 for more specifics on mediate operation of the cathodic Tank Monitoring System Instal- protection criteria. protection system each anode lation: Contact between the sti-P3® 6. AVAILABILITY AND COST should be thoroughly saturated tank and all other structures such with water before placing backfill. as external and internal piping, sti-P3® protected underground Anchoring: High water tables pumps,valves, gauge and monitor- steel storage tanks are available or partially flooded excavation ing equipment, and grounding sys- nationally from about 80 licensed sites exert significant buoyant tems will nullify the cathodic pro- manufacturing plants throughout forces on tanks. These forces are tection design. Prior to backfill a the United States. Please contact partially resisted by the weight of simple continuity test between Steel Tank Institute for a list of the tank, backfill and pavement the tank and lead wire and each licensees. atop of tank. Additional buoyant connected system will verify elec- sti-P3® Dual Wall tanks are also restraint, when needed, is ob- trical isolation. Continuity should available. Dual wall steel tanks tained by hold down straps in not be present. A Protection with sti-P3® corrosion protection conjunction with concrete hold Prover 2® (PP2®) or other equiv- provide secondary containment. down slabs or deadman anchors. alent cathodic protection moni- Some states and regions mandate The use of steel cable and round toring station must be installed. secondary containment. bar is strictly prohibited. All tanks must be monitored to Cost: Information on protected I steel tanks costs can be obtained the warranty is available from the ceiving, test and inspection, directly from sti-P3® licensed Steel Tank Institute. fabrication and record keeping. manufacturers. Installation costs Quality Control: To assure ad- These quality control steps fur- should be obtained from tank in- herence to standards and sti-P3® ther ensure that all fabricating stallation contractors. specifications, members of the and assembly procedures, as 7. WARRANTY Steel Tank Institute are inspected specified by Steel Tank Institute, by independent quality control are followed in every detail. Qual- These tanks are backed with a inspectors who make u n- ity fabrication and conformity to 30 year limited warranty against announced visits to all the plants strict specifications are thus as- leakage from corrosion. Stated producing sti-P3® underground sured. obligations to both parties are tanks. The quality control pro- 8. MAINTENANCE defined and delivered with each gram also includes a triennial tank, and its serial number regis- audit. The scope of the audit in- No maintenance is required tered on an individual basis with volves five major elements: orga- upon protected underground the Steel Tank Institute. A copy of nization, procurement and re- steel storage tanks. Protection Prover 10, Protection Prover 2® or The following chart is provided as a reference. The respective manu- a custom cathodic protection facturing techniques, methods and customer requirements will result in monitoring system is provided slight variances from this table. and factory installed on each Typical underground steel fuel storage tanks' tank. For all regulated, non-residen- Gallons Steel Nominal Sample Standard Nominal tial, sti-P38 tanks shipped after —Capacity* Thickness Dimensions2 Openings* Weight (Lbs) October 1, 1988, the Steel Tank 550 .134" (10 gage) 48"x 6' 44" 482 Institute is performing cathodic 1,000 .134" 48"x 10'8" 44" 1,000 protection monitoring that com- 1,000 .134,100 gage) (W x 6T' 44" 916 plies with the federal schedule 2,000 .179" 64"x 12' 64" 1,980 specified in 40 CFR 280.31. Such 3,000 .179"�(7 gage) 64"x 18' 64" 2,750 monitoring will be conducted dur- 4,000 .179 64"x 24' 64" 3,500 ing the 30 year span of the sti-P3® 5,000 1/4' 96 x 13'4" 64" 4,910 6,000 1/a" 96"x 16' 64" 5,590 warranty. This 30 year monitor- 8,000 '/4' 96"x 21'4" 64" 6,905 ing plan is referred to as the 10,000 1/4' 96"x 26'8" 64" 8,280 Watchdog® Program and is in- 12,000 1/4' %"x 32' 64" 9,650 cluded in the purchase price. 15,000 V1a" 126"x 23'4" 64" 12,800 9. TECHNICAL SERVICES 20,000 5/16' 126"x 31' 64" 15,970 30,000 3/81' 144"x 36' 64" 25,000 Engineering and installation as- 50,000 11 3/e" 144"x 60' 64" 40,000 sistance is provided by sti-P3® li- (1)One advantage of the sti-P3 corrosion control system is that it can be applied to any size steel tank. censed tank manufacturers. If non-standard size tanks are required,they also can be protected from corrosion." As a guide to writing specifica- (2)Check with manufacturers for other available dimensions,before specifying. tions, include: "Provide under- *Tanks above are industry common sizes within standard.Many other tank and opening sizes,orienta- ground tanks conforming to the tions and dimensions are available. contract drawings and Under- 2,000 to 50,000 gallon underground tanks writers' Laboratories, Inc., Stan- shell length diameter dard UL 58 (or other construction , 5 0 2a�� e� standards). The corrosion control E e system must be in strict accord- 4•npt opening Itl lug UL 8 S03 ance with sti-P3® specifications, (6 places) (2 places) labels and tank(s) must bear sti-P3® labels. \anode 10. FILING SYSTEMS (typical) Sample tank drawing. Many other tank and opening sizes, Electronic SPEC-DATA® orientation and dimensions are available on special order. SPEC-DATA® II 95 Steel Tank Institute 0 2-91-2412 Single Wall Steel Stimft Underground Storage' 9 9 my sti-P3 cathodically protected USTs have the unique ability to test the corrosion protection system. Potential breakdown PFE EN6INEENED and failure of all-FRP tanks can't be identified until con- PgpYENFA0TErnON ' tamination of soil or ground- water has already occurred. UL 58 Steel Tank STI approved coating or reinforced laminate Advantages of sti-P3 ■ Long-term reliability provided by pre-engineered corrosion Single Wall Steel USTs protection system ■ First nationally available corrosion protection technology ■ EPA approved underground tank technology as cited in the U.S. EPA's Technical UST Regulations ■ 30-year warranty against internal and external corrosion ■ All models are alternative fuels comptaible ■ Built to nationally recognized STI and UL standards ■ Available only from licensed STI members ■ Protected steel USTs are number one choice for petroleum marketers and C-Store owners since 1989 (Source: C-Store News Industry Reports) Traditional Advantages to Alternative fuels compatibility without the additional cost of of Corrosion Protected internal liners Steel Tanks ■ Cost-effective customization for multi-product storage compart- ments in virtually unlimited capacities ■ Steel striker plates below each tank opening protect tank bottom ■ Various backfill options can allow money-saving installation New PP4 Cathodic ■ Allows accurate cathodic protection system tests any time Protection Testing System ■ No training required—test sti-P311 cathodic protection systems yourself in less than a minute ■ Designed by world's leading cathodic protection specialists ■ Provides compliance for varying cathodic protection testing requirements ■ Can be used to test piping cathodic protection systems Only pre-engineered cathodically PRE-ENGINEERED protected steel tanks that bear the p sti-P.`label are part of the Steel Sti a Tank Institute's proven quality teel tank institute assurance program. PROVEN PROTECTION sti-P3" Single Wall Undergro"Steel Storage Tanks Some Optional Accessories Lift Lugs for sti-P3J Tanks: ■ Flanged Nozzles ■ Interior Ladders ■ Heating Coils ■ Internal Piping ■ Hold Down Strap Isolation Material Striker Plates ■ Hold Down Straps ■ ManwaysI all Overfill and Piping Sumps End View ■ Capacity ranges up to 50,000 gallons ■ Carries Steel Tank Institute sti-P3' and UL labels ■ Offers strength of steel and protection against corrosion ■ Employs striker plates beneath each tank opening to protect tank bottom all Compartment storage tanks available `Anode quantity and location determined by size and manufacture of tank. Note: Some states require secondary containment.sti-P3' USTs are available in double wall designs for that extra environmental protection. J � OElectrical isolation Three key elements (Bushings) guard against external corrosion: 1)electrical isolation, 2)dielectric protective coating and Dielectric protective 3)galvanic anodes for coating cathodic protection. Since i 1969,the pre-engineered sti-P3 corrosion protection © Cathodic protection system has provided (Anodes) `` reliable, long-term perfor- mance for steel USTs. Steel Tank Institute's sti-P3 Specification and Manual for External Corrosion Protection of Underground Steel Storage Tanks, Publication #STI-P3-90, is available for a nominal fee from the Steel Tank Association, Inc. by calling 708/438-0989 or writing to STA, 570 Oakwood Road, Lake Zurich, IL 60047. Installation instructions for St'-P3' USTs, Publication#R821-93, are also available—free of charge—by contacting STA. ACE TANK & EQUIPMENT CO. [FAX attle,Washington Portland,Oregon Dublin,California O.Box 9039-98109 6125 N.E.Portland 11875 Dublin Blvd. 06)281-5000 Hwy.97218 Suite A-103 94568 281.5030 (503)284-5505 (510)803-2000 00)426-2880 FAX 284.5829 FAX (510)803.2010 (800)452.7437 (800)282-0028 This literature was developed by the Steel Tank Association,Inc.,which distributes printed materials on behalf of the Steel Tank Institute and its members. 10/99-5M-Item#13-54 TOKHEIM 1200 Series Pumps SUCTION PUMPS AND REMOTE CONTROLLED DISPENSING PEDESTALS--SINGLES AND TWINS Computer—All models utilize the latest Frame construction—Sturdy, heavy type Veeder-Root 4-wheel computer for steel members welded and bolted to money-gallon display. Metric measure- form one solid structure. u►R IL°0E ment optional accessory. Doors—Front and rear, provide quick I ww.. Non-computing models—Incorporate access for installation and inspection of wheel type Model 101, which registers pump parts. Have locks and can be �' �® I E�J gallons delivered only removed without the removal of screws _ Operating lever—Single step automatic or other fasteners. -- - reset, requiring a simple. single Retrev-a-Hose device—Nylon cable movement with Tokheim-designed retrieving reel. 12'of 5/e" lightweight, heavy-duty hose Power reset—Electric power reset is for each outlet,furnished as standard. standard on all models. A simple flick of the operating lever turns on pump motor Nozzle—Manual,shock resistant,fur- and resets the computer. nished as standard. Dials—Full width, painted dials are con- Speed—Ample delivery for handling veniently located at motorist's eye-level. peak hour business. Delivery up to 15 Easily removed for servicing and G.P.M.=for standard suction pump. inspection. Delivery of remote control dispenser is related to the capacity of the submerged Illuminated advertising panels—Avail- pump and the number of dispensers on able, if specified. 24" x 3"•front and each submerged pump. rear, on lighted models only. Inlet fittings—1'/z"ground joint union Dimensions—Overall height,Series Dial illumination—All lighted models type on all models,with centerline Iota- 1248 is 48 Series 1250 is 50". Base are furnished with full-length fluorescent tion of suction stub. dimensions, Series 1248 and 1250, tubes, and built-in, rapid-start ballast. 253/s" x 175/e". Compartment width, all Dials and advertising areas are brightly Light switch—Contained in a Class I models, 25 depth 19" illuminated. Group D Hazardous Location housing. Button is hidden in the end skin of the Standard models and Numeral wheels—Protected from the dispenser to discourage unauthorized approximate shipping weights elements by clear plastic openings in the actuation. wErcMT• dial face. MODELS POUNDS Insulation—The pumping units and the 1250AS Suction Pump ... .._ 420 Measuring unit—Tokheim vertical pis- electric motor are mounted on Buna N 1250AS-HS high Speed Pump 556 ton, positive displacement meter. Accu- insulatinggrommets to eliminate vibra- 1250A' Suction Pump.. . , 422 rate at any pressure and delivery rate. tion and noise. 125OA-1 Twin Suction Pump.. 522 125OA-2 Twin Suction Pump ... .614 Combined pumping unit and air sepa- Locking device—Nozzle can be pad- 1250AS-RC Pedestal .. . .._ _.._298 rator—High vacuum, rotary gear type, locked to nozzle hook. 1250A-RC' Pedestal._ _ . . . ..298 with hydraulic self-adjusting bypass and 1250A-1-RC Twin Pedestal .... .. 416 regulating valves, and monel metal Tokheim hydraulic control valve— 1250A-2-RC Twin Pedestal. . 429 strainer screen. 100 x 90 mesh. Used in all remote control pedestals and 1248AS Suction Pump 395 Standard motor—Intermittent duty, h single-product twin suction pump mod- 1248A' Suction Pump _. 395 y els. Hydraulic action of the valve permits 1248AS-HS High Speed Pump 516 H P., 115 230 Volt, A.C., 60 Hertz, single smooth,easy operation,thus removing 1248A-1 Twin Suction Pump _. 504 phase motor is standard on all single- strain from the actuation mechanism. 1248A-2 Twin Suction Pump_ .. .608 and two-product suction pumps. One- Assures a balanced system with full con- 1248AS-RC Pedestal 268 product twin pump contains a contin- trol and shockproof,smooth flow. 1248A-RC' Pedestal. 268 uous duty. !,z H.P. motor. High-speed pumps contain two 112 H.P. continuous 1248A-1-RC Twin Pedestal.... .. 395 duty motors. 1248A-2-RC Twin Pedestal _ 408 Materials and workmanship—Are of the very highest quality. Every pump and Finish—All external housings of highest dispenser tested at the factory for accu- 'flow rates suh;ecr,n quality. bright-annealed stainless steel i.onddions of losranal'nn Doors and end panels are available in racy, at both fast and slow flow rates. a„(I JLCessories used either bright-annealed stainless steel or Underwriters'label—All model versions 're'llel mount compete,is high temperature baked acrylic enamel. listed,and carry Underwriters' Labora- 000nai e.t,a cost item All metal surfaces.other than stainless tories label. finish. are chemically cleaned before prime coat is applied, then finished in Ticket printers—Available on certain high temperature baked acrylic enamel, models. Please consult the factorv. NORTHWEST PUMP & EQUIPMENT CO. 1-3 For pricing call toll free number on front of catalog. a CO N THE BENEF1 V. FIBERGLASS PI-1 pil.. Smith Fiberglass Products offers a per UL/ULC requirements, and • Thermosetting complete line of Underwriters Labor- secondary containment fittings are Properties- Manu- atories and Underwriters' Laboratories tested in accordance with standards factored with ther- " of Canada (UL/ULC) Listed product approved by UL/ULC. mosetting epoxy resin, - and containment piping systems. RED RED THREAD IIA pipe p g g y • Telescoping Inspection Contain-IIA fiberglass product pip- p, g p won't soften,cold-flow,or in g in 2", 3" and 4" diameters and 3", ment - Smith Fiberglass Products blloon at its maximum in and containment pipe carry the offers the only 100 percent*inspec- operating temperature of UL label for conveying petroleum table double-wall fiberglass pipe 150°F.And,it won't get brittle products, alcohols and alcohol- system. The system provides assur- in temperatures as low as-40"F. gasoline mixtures underground. These ante of a leak-free product system , Maintains Product Purity - products are ULC Listed for conveying before the containment is closed and RED TH READ IIA pipe is chem- tested. And, it allows access to the petroleum products, ethanol, and rims piping after the installation ically compatible with all gasoline/ethanol mixtures. primary p p g EPA approved motor RED THREAD IIA fiberglass pipe and is completed. fuels.This assures fittings provide a containment system • Easy-to-Install Containment Fittings freedom from con- that is pressure testable and can be -Female threaded inserts are factory tamination of the continuously monitored. UL/ULC installed in one-half of the two-piece products being " Listed Smith Fiberglass Products piping containment fitting. Companion conveyed. offers many additional benefits for the bolts are shipped with each fitting. • Permeability- petroleum marketer concerned about Simply apply adhesive,drop the bolt Studies which test- long life, quality and ease of in, tighten . . . and the joint is ed several fuels were installation. complete. conducted by independent labora- • Exceptional Corrosion Resistance - • High Pressure/Temperature Rating tories to determine any loss of liquid UL/ULC Listed RED THREAD IIA -RED THREAD IIA pipe offers cyclic through Smith Fiberglass Products piping.None of the samples'showed pipe resists internal and external operating pressure ratings of up to any loss in weight during the test period. corrosion from hazardous soils, 250 psig at 1500 F. Its safety factor These results are better than per- alternative and reformulated fuels of 5:1 offers assurance that the meability tests conducted on and other corrosive fluids. primary pipe system is capable of the common thermoplastics. • Quality Assurance - RED THREAD handling extreme upset pressure e Low Coefficient of Linear IIA fiberglass piping undergoes spikes. Expansion -The coeffi- ongoing testing to meet the high cient of expansion of RED quality standards established by THREAD IIA pipe is 1/5 Smith Fiberglass Products. These to 1/8 that of thermo- quality assurance procedures REFER TO SMITH FIBERGLASS plastic flexible pipe exceed the minimum test require- PRODUCTS MANUAL NO. B2160 and only twice ments of Underwriters Laboratories. FOR COMPLETE INSTALLATION that of steel. All UL/ULC Listed RED THREAD IIA INSTRUCTIONS COVERING AS- SEMBLY BURIAL TESTING AND • Proven Joining pipe is hydrostatically tested at , System - Lightweight SECON- inspection rates exceeding 98 per- REPAIR OF PRODUCT, RED THREAD IIA pipe cent. Molded product fittings are DARY CONTAINMENT AND TELE- SLOPING CONTAINMENT PIPING is joined with the prov- 100 percent hydrostatically tested . en T.A.B. (Threaded and Bonded) *U.S.Patent 4,805,444 r � "a -�1 Y used to bond the piping system. The components needed to make a bond, along with a detailed instruction sheet, are included with each adhesive kit. When RED THREAD IIA product joint designed for easy replacement in the pipe is cut to length on the jobsite, which event of failure. the cut end must be retapered. Tap- promotes ering tools, available from Smith fast, posi- REFER TO BULLETIN B2150 for Fiberglass Products (Bulletin No. tive make- dimensions of available UL/ULC F6600 and F6625), quickly apply the up and pre- Listed RED THREAD IIA product proper matching taper — similar to a vents "back- and containment fittings, pencil sharpener. Plain, unthreaded out" problems field-made tapers can be joined with during cure time. Easy, Economical Installation factory-installed T.A.B. joint coupled These features assist The exclusive T.A.B. joint is factory- ends. Either T.A.B. spigots or field- the installer and assure installed on product piping. Spigots made tapers may be joined with belled economical installation. fittings. and bonded-on coupling ends are • Reliability - Smith Fiber- threaded with special profile double- When connecting containment pipe glass Products fiberglass pip- lead threads. The standard joining and fittings, plain ends of the contain- ing is designed and manufactured to procedure for field-made epoxy bonds ment pipe are machined or thoroughly meet the requirements of governmen- is achieved by the mechanical locking sanded to accept the two-piece UL/ tal environmental regulations, in- action of matching bell and spigot ULC Listed containment fitting.Match- cluding EPA. Fiberglass piping differs tapered angles. Compatible adhesives ing adhesives are used to bond the from other products which are from Smith Fiberglass Products are system. OPW 70 October, 1989 #7G Vertical Check Valve I I - I I I-_ 1-1-- l" . 1 11 The OPW vertical check valve is designed for installation into the inlet of suction type dispensing pumps and features. g-r ... Low pressure drop ... M-19 Won seals on main poppet for compatibility with methanol blended A` fuels and reliable sealing Thermal relief valve to reduce pressure build-up in suction pumps. ... Protective shear groove designed to reduce the possibility of damage '. to buried piping in the event the dispenser is knocked over. �11/2"npt, both ends Thermal Relief 9' Valve 1001O Thermal Relief Valve O I N i W u p Main Poppet m Viton Seals Shear Groove ®� i I 29An"diameter Plow Application I Typical Suction Pump I i OPW' 70 Vertical Check Valve Shear Groove OFIV104-A-12"Manho4e, at Dispenser Base or CIPW 1,Spill Container e _ OPWry 116 4"Cap 4"Riser OPW�70 Supported Below Shear Groove '— _ I OPT „,233-E th -4- extractable, Swing Joint or - — Suction piping sloped pluypebie cages, Flex Connector, back to U.S.T.per to ensure tank both ends. EPA regulations. or line Iaoiadon and testing. i U.S.T The ®PW 70 vertical check valve is an How to Order.- economical alternative for compliance OPW 70 (0070) 11/2 vertical check valve with the new EPA regulations for leak detection. When installed directly below Materials the suction pump and with below-grade Body; Cast iron with black Duragard® piping sloped back to the storage tank; coating this vertical check valve helps eliminate Disc; M-19 Viton the need for monthly monitoring or line testing every three years. a fueling Components Group --- P.O. BOX 405003 • CINCINNATI, OHIO 45240-5003 TELEPHONE (513) 870-3219 OR 1-800-422-2525 (c)Copyright 1989 Dover Corp./OPW Division Printed in U.S.A. EBW Angle Check, Union Check, Gate & Foot Valves EBW ANGLE CHECK VALVES No. 615—Sturdy cast iron cadmium No.630—Sturdy cadmium plated iron plated body.Equipped with permanent body, with brass nut, seat, and pop- brass seat, poppet, and nut. Heavy pets. Heavy hex flanges for ease of hex flanges for ease of installation. installation. Precision machined; mi- Precision machined and carefully in- nutely inspected and tested. spected and tested. Model Size Description Weight Lbs. Ounces 615 1'/" Iron Body Angle 4 5 615S 1 Y" Iron Body Angle 4 6 with composition disc spring loaded 630 1'/." Iron Body DP Angle 6 15 635 2" Iron Body Angle 6 8 EBW UNION CHECK VALVES EBW GATE VALVE PART NO. 275 E.B.W. Union Check Valve stops suction line DESCRIPTION: leaks. Bronze threadless, insertable type verti- 16 125lb. A.O.G. cal line check valve. Molded seat, spring !oaded. NR Stem, Solid Disc '/2", '/4", 1„ 1'/4", 1'/2". 2„ Note open construction so as not to restrict flow. c MODEL SIZE DESCRIPTION 650 1 '/:" Union Check brass • (without screen) 650S 1'/z" Union Check brass (with screen) EBW ALL BRASS FOOT VALVES E.B.W.all Brass Foot Valves are precision made to insure No.516—E.B.W.single and double Vertical Check Valves the highest degree of accuracy in construction and per- are all brass with flat discs and seats. Heavy hex nuts on formance. Seats and discs are carefully machined and both ends. Ends have standard fernale pipe threads. All minutely inspected.Each valve is individually tested under rigidly inspected and tested under pressure. pressure.The 20 mesh brass screen is firmly attached but can be removed. Single Poppet Foot Valves are of similar construction. Model 151 FOOT VALVES ALL BRASS Model Size Description Weight_ Lbs. Ounces 50 /:" Single Poppet 0 12 VERTICAL CHECK VALVES ALL BRASS 51 '/," Double Poppet 1 0 _ — — 75 ;a" Single Poppet 0 13 Model 516 Model Size Description _ Weight 76 Double Poppet 1 3 Lbs. Ounces 100 1" Single Poppet 1 2 J00 1" Single Poppet 1 9 101 1" Double Poppet 1 15 515 1'iz" Single Poppet 3 0 150 1 '/," Single Poppet 3 0 516 1'/" Double Poppet 4 5 151 1'/" Double Poppet 4 6 200 2" Single Poppet 4 6 ,- 520 2" Single Poppet 4 6 201 2" Double Poppet 6 7 521 2" Double Poppet 6 7 NORTHWEST PUMP & EQUIPMENT CO. 13-9 For pricing call toll free number on front of catalog. EBW CLAY & BAILEY Fill Caps & Vent Caps EBW FILL CAPS EBW ADAPTORS • Buna-N gasket • A.S.T.M. B62 cor- rosion resistant bronze construction• Adaptor interchangeable with most competitive covers•Sizes 4"x 3"and 4" x 4" • Height 2-9/32" No.776 4W No. 778 No. 775 No.777 Size 4" Only Model Size Description Weight • Finest design and engineering • Lbs. Ounces Easiest to operate • Labor saving • 775 4" Fill Cap Cover 1 2 Self-centering linkage•Buna-N form 776 4x4" Brass Adaptor 1 0 fitting gasket•Aluminum construction 777 4" Fill Cap Cover 1 2 • Hi-strength cams • Corrosion re- 778 4x4" Brass Adaptor(with lugs) 1 14 sistant steel handle latches • Nylon 778 4x3" Brass Adaptor(with lugs) 2 2 grips 778 4x4" Brass Adaptor(without lugs) 1 14 CLAY & BAILEY MODEL NO. 94 WATERTIGHT FILL CAP Model Size Description 94 2" Brass Body, Iron Top 94 21/2" Brass Body, Iron Top 94 3" Brass Body, Iron Top 94 4" Brass Body, Iron Top A lock type water tight fillcap with iron top and brass body.Cover has female thread and base has male thread. Equipped with gasket to insure its be- CLAY & BAILEY VENT CAPS ing air and water tight. EBW VENT CAPS 4. ONE PIECE MUSHROOM TYPE T-VENT 401 k.. ' ; 2„ Ir r 802 800 dip PRESSURENACUUM VENT TANK VENT TEE TYPE Threaded or"O" Ring Seal. Cast Aluminum Size: 2" 1 z",2",3" T-VENT 300 NORTHWEST PUMP & EQUIPMENT CO. 13-7 For pricing call toll free number on front of catalog. E.W., EBW, TOK_HEIM, RED JACKET Manholes I& Street Boxes EMCO WHEATON MANHOLES EBW 781 MANHOLE AND COVER A-0717 Heavy Duty Manholes are made of rugged Rugged 12" diameter manhole with ribbed cast cast iron. The lids are reinforced by heavy ribs aluminum cover, built to hold the heaviest traffic. and non-skid diamond thread. It is available with The 71/2" deep skirt is one piece, made of 16 gauge the following options: steel it is ideal for thick concrete. A. Various Depths B. With Product Tag. ''° ` ` C. With or Without Locking Device Please specify when ordering. MODEL SIZE DESCRIPTION 781 12" Cast iron, steel 781 12" Cover only(cast iron) MODEL SIZE DESCRIPTION A717 A717-001 8" Manhole, 8" dia. x 31/z" deep A717-002 10" Manhole, 10" dia. x 3l/z" deep A717-003 12" Manhole, 12" dia. x 3'h" deep RED JACKET 30" MANHOLE 30" MANHOLE ASSEMBLIES This heavy duty manhole assembly is made of a tough,galvanlzed steel skirt and a 5/8"steel tread plate cover.' It features a retractable, wide grip handle that pulls out for easy lilt with a special non-snag rim design for worry-free wear.It's built to give you a strong,reliable cover for your submersible system.Comes wiih or without a liner. 'Steel tread plate has 36,000 P.S.I.minimum rating. TOKHEIM 91 STREET BOX n� *ru �112 F Mr..del 21 5troat Box,23"X?W'x 1014"d"o. Heavy welded-q�'kV4 c�onstruel£on. _ Specifications C rtrable oter-fro-tl Nkm paint. Part Number 151.035 151.036 Description 30" Manhole 30" Manhole wInner w/o liner Material 12 GA.-Skirt 12 GA.-Skirt 16 GA.-Liner Shipping Wt. 190 lbs. 184 lbs. NORTHWEST PUMP & EQUIPMENT CO. 13-3 For pricing call toll free number on front of catalog. Typical Stage 11 Dual Point Piping System A4103 A25 F77 A79-002 A97 \\ �` ljl A99 A30 \ A76 A717 /� A79-002 1 A20 t 7 - i Drop Tubes A90 Coaxial Drop Tube The A90 drop tube is used in coax- with Adapter ial fill systems with automatic tank truck shut-off systems. Required by - legislation in some areas of the coun- try.Comes complete with adapter and bushing,as required.Use the A97 fill cap and F298 elbow or equiva- lent. SOLD IN CARTONS OF TWO. Model No. Fuel Size Weight Tube No. Adapter Bushing _ A90-001 Leaded 4"x 12' 13 lbs. 491511 491687 N/A A90-002 Leaded 3"x 12' 9 lbs. 491512 491687 491689 A90-003 Unleaded 3"x 12' 9 lbs. 491512 491688 491689 A90-004 Unleaded 4"x 12' 13 lbs. 491511 491688 N/A A20 Drop Tube The A20 drop tube is used in con- ventional non-vapor recovery and dual point vapor recovery fill systems. The drop tube fits directly into the tank riser pipe to permit tight fill submerged filling with reduced turbulance and minimal vapor loss. Light weight aluminum for easy han- dling and installation.Complete with buna gasket.Cut 450 in the field to fit. Use with the Emco Wheaton A30 adapter and A39 or A97 fill caps. Use the F523 Elbow or equivalent. SOLD IN CARTONS OF FOUR. Model No. Size Weight A20-001 3"x 10' 3 lbs. A20-002 3"x 11' 31/2 lbs. A20-003 4"x 10' 4112 lbs. A20-004 4"x 12' 5 lbs. A20-006(.065 Wall Thickness) 4"x 12' 51/2 lbs. A20-007 2"x 10' 21/2 lbs. I �I Underpump Valves s A732 Underpump The Emco Wheaton A732 provides a A Union Check Valve method for temporarily stopping the loss of prime caused by a damaged foot valve,angle check valve,or verti- cal check valve.The A732 is easily inserted into an existing union end and can be used until the damaged valve is repaired or replaced.Avail- able with optional screen to prevent s i impurities from entering pump. J t f �tSq i r r C Model No. Size Weight A B C A732-001 1'/2" 6 oz. 23/16" 2'3/a" 1'/16" A732-002* 11/2" 6 oz. 23/1s" 23/4" 11/1e" *Includes strainer. Materials Body: Molded celcon Disc holder: Brass Stem: Brass Spring: Bronze Disc: Buna N Screen: Brass,20 mesh A85O Vertical The A850 is an extractor type check Cheek Valve valve designed for installation in suc- tion lines at the base of the dispenser. (Replaceable Assy.) Used in place of underground foot or angle check valves to hold the prime. ® The valve can be serviced without removing or disturbing existing piping by removing(4)face plate bolts. B Inside assembly of lock ring,gasket, seat and disc can then be removed for inspection or repair. The A850 features a metal-to-metal flat seat and disc for long,dependa Q. - ble service.Available with optional A strainer to filter out contaminants. Model No. Inlet Outlet Weight A B A850-001 11/2"Female NPT 11/2"Female NPT 73/4 lbs. 5" 413/1E A850-003* 1112"Female NPT 11/2"Female NPT 8 lbs. 5" 4i3/1 *Includes optional strainer. Materials Body: Cast iron Strainer: Brass,8 mesh inner,40 mesh outer Seat: Brass Gasket. Cork and Buna N Disc: Brass Replacement Assemblies 490359: 11/2"Lock Ring,Gasket,Seat and Disc 490748: 11/2"Strainer Assembly 5.4 Float Valves A75 Float Valve The A75 is designed to restrict product A flow in the event of a tank overfill,and also to minimize product mixing when tank vent lines are manifolded I underground. May be used in cOnji mction with the A79 (5r'e(;ages C 1./and 1.5.)Features a '''A"k,l�ed hc,le to release compressed air in the top of B the tank in the event of an overfill.Cage damage is prevented by a unique '• stainless steel spring design which insures that the ball float has freedom of movement.This design will take greater abuse than competitive designs. Bleed Model No. Thread Weight Hole* A B C A75-001 2"Male NPT 1 lb. '/e" 2" 91/2" 6'/a" A75.002 2"Male NPT 1112 lbs. '/e" 2" 143/4" 111/8" A75-004 2"Male NPT 1 1/4 lbs. '/s" 2" 123/a" 91/2" A75-005 2"Male NPT 11/4 lbs. Y;s" 2" 123/4 91/2" *Also available without bleed hole for use only on vapor return line(Stage II)from the nozzle to the underground tank.Because there is no bleed hole,the possibility of fuel seeping into the vapor return line is minimized.Consult factory for details. —Approximate fluid level at shut-off. Materials Tube: Aluminum Ball Float: Stainless Steel Spring: Stainless Steel 79 -- - --- - rs Float Valve Extractors A79-001 Float Vent Valve The A79-001 Assembly consists of the The A79-001 Assembly is recom- Extractor Assembly extractor fitting body,extractor cage, mended for use in conjunction with and the A75-002 float vent valve.The Dual Point Vapor Recovery systems, extractor fitting mounts on the under- and where underground vent piping of ground tank flange and secures and similar products may be manifolded.In positions the float vent valve in the tank. these applications the float vent valve A 2"port on the fitting accommodates will reduce product crossover.(See the tank vent line.The float vent valve also A75). ( can be removed from the tank,using Features a heavy-duty cast iron body, the A560-002 extractor wrench,without galvanized for rust protection. the need for excavation. Overfill protection is provided as the A float vent valve is designed to close at C approximately 95%of tank capacity. As the valve closes,product flow rate from the delivery vehicle is dampened D - to prevent sudden line shock.When the valve is fully closed,flow rate is reduced by 99%.In the event of overfill, a standard 1/8"bleed hole provides pressure relief for compressed air in the tank. o i B E Vent Tank Riser Model No. Port Connection Connection Weight A79-001 2"Female NPT 4"Male NPT 4"Male NPT 183/4 lbs. A B C D E 5'/4" 193/4 31h" Y/16" 6" Materials Body: Cast Iron,Galvanized Cage: Brass Tube: Aluminum Ball Float: Stainless Steel Replacement Assemblies 409226: Extractor Fitting Body 409228: 2"Extractor Cage 'A75-002: Float Valve A560-002: 2"Extractor Wrench 'See also page 7.9 for A75 detail. 7.7 EMCO WHEATON Overfill Manholes Emco Wheaton's A719 Sealed Manhole The third option is A719-003, which offers many benefits to underground includes a drain valve in the bottom of tank owners. It is designed to catch the manhole. The corrosion-resistant and contain product spilled when a valve is connected to a 3/a" hose tank is overfilled,and to hold product which taps into the riser pipe, allow- drained from the hose following a ing product to be drained into the service station drop. underground storage tank. Tank owners are protected from pro- The easy-to-open manhole lid is duct seeping into the subsoil and designed to shed water and made of contaminating ground water or tank heavy-duty cast iron with a diamond monitoring wells. treaded top. The body is also A719-003 Cover Several design features make the heavy-duty cast iron, sealed with a [----12" I.D. A719 the best sealed manhole on the zinc-base primer for corrosion resis- market. It has a special buna seal on tance. Inside diameters are 12"x 12" the bottom of the manhole that and the unit holds approximately five o clamps firmly around the 41/2" OD gallons of liquid. O == riser,forming a tight seal that positively N prevents leakage. Buna Seal The A719 has several options for you Model No. to choose from. The A719-002 is a A719-003 Pull - closed vessel that can be used to Size (I.D.) Depth Weight Ring 4" Nipple/ hold spilled product. The A719-001 12" 12" 85 lbs. Drain Coupling has an optional 1" NPT outlet cast Valve Drain Hose Assembly into the bottom which permits pro- duct to be piped away in the event of an overfill. A106-001 Cover Emco Wheaton also offers a larger �18" I.D. containment manhole designed with the same special features as the smaller A719.The A106 containment Pull Ring manhole measures 18" in diameter x Model 30"in depth and holds approximately A106-001 25 gallons of liquid. It was originally Size (I.D.) Depth Weight designed for use with our A107 18" 30" 125lbs. o automatic overfill prevention valve p Materials co The large capacity of this manhole is Body: Cast Iron & Fabricated Steel Lid: Cast Iron an attractive benefit to station owners. Clamp: Steel It provides sufficient volume to contain Seals: Buna N & Viton product trapped within the drop Buna Seal hose. Drain Valve NOTE: during installation, provision _ must be made to support either 4" Nipple—; Assembly Drain Hose manhole until concrete sets up. Assembly 13-4 NORTHWEST PUMP & EQUIPMENT CO. For pricing call toll free number on front of catalog.