HomeMy WebLinkAboutBLD24707 Addition - BLD Application - 11/2/1989 BUILDING PERMIT APPLICATION
MASON COUNTY
DEPARTMENT of GENERAL SERVICES
P.O. BOX 186 SHELTON, WASHINGTON 98584
427-9670 DATE ISSUED ,[��
PERMIT NO;� / /Q ,�
OWNER NAME MAI ADDRESS CITY BSTATE ZIP PHONE
DIRECTIONS
TO JOB SITE li f
PARCEL LEGAL /l
NUMBER DESCR. p
NAME MAIL ADDRESS CITY 8 STATE LICENSE NO. ZI PHONE
CONTRACTOR
USE OF
BUILDINGPA AvS
CLASS OF NEW ADDITION ALTERATION REPAIR MOVE REMOVE
WORK ✓
DESCRIBE
WORK IS
BEDROOMS DECKS CARPORT 12 NOTICE
SEPARATE PERMITS ARE REQUIRED FOR PLUMBING, HEATING, VENTILATING OR AIR
BATHROOMS_ TOTAL SQ.FT. GARAGE CONDITIONING.
NO.OF STORIES BASEMENT ATTACHED THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT
+ COMMENCED WITHIN 180 DAYS, OR IF CONSTRUCTION OR WORK IS SUSPENDED OR
TOTAL SQ.FT.,1 FIREPLACE DETACHED ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME AFTER WORK IS COMMENCED.
PERMANENT SHORELINE
SEASQNAL
Y
ERSAFFIDAVIT CONTRACTORS AFFIDAVIT
IFY THAT I AM EXEMPT FROM THE REQUIREMENTS OF THE CONTRACTORS 1 CERTIFY THAT I AM A CURRENTLY REGISTERED CONTRACTOR IN THE STATE OF
RATION LAW RCW 18.27, AND AM AWARE OF THE MASON COUNTY ORDINANCE WASHINGTON AND I AM AWARE OF THE ORDINANCE REQUIREMENTS REGULATING THE
EMENTS FOR WHICH THIS PERMIT IS ISSUED AND THAT ALL WORK DONE WILL BE WORK FOR WHICH THE PERMIT IS ISSUED AND ALL WORK DONE WILL BE IN
NFORMANCE THEREWITH. NO CHANGES SHALL BE MADE WITHOUT FIRST CONFORMANCE THEREWITH.NO CHANGES SHALL BE MADE WITHOUT FIRST OBTAINING
INGAPPROVALF OM THE BUI IN DEPARTMENT. APPROVAL FROM THE BUILDING DEPARTMENT.
X OWNER DATE X BY DATE
FOR OFFICE USE ONLY
DEPARTMENT APPROVED DEPARTMENT APPROVED BUILDING VALUATION P l 9i00
YES NO YES NO A. .
HEALTH PUBLIC WORKS FEE
PLANNING FIRE BUILDING PERMIT f ad
D.O.T. I BUILDING PLAN CHECK ap
SPECIAL CONDITIONS BUILDING GROUP PRE-INSPECTION
SHORELINE
WOODSTOVE
PLUMBING
MECHANICAL
STATE BUILDING FEE
STATESURCHARGE
APPLICATION ACCEPTED BY PLANS C BY APPROVED FOR 1 UANCE PERMIT VALIDATION 16-75,
�6 4`
�� BY / CASH CK MO TOTAL
PLUMBING & MECHANICAL PERMIT APPLICATION
MASON COUNTY
DEPARTMENT of GENERAL SERVICES
P.O. BOX 186 SHELTON, WASHINGTON 98584
427-9670 DATE ISSUED
PERMIT NO.
NAME MAILADDRESS CITY&STATE ZIP PHONE
OWNERmv
DIRECTIONS /
TO JOB SITE
100,
LEGAL
DESCR. , / J ,
CONTRACTOR NAME MAILADDRESS CITY&STATE LICENSE NO. ZIP PHONE
USE OF _
BUILDING /
PLUMBING FIXTURES MECHANICAL FIXTURES
NO. 2.00 PER FIXTURE OR TRAP FEE NO. TYPE OF FIXTURE FEE
WATER CLOSETS IMFORCED-AIR/GRAVITY TYPE FURNACE 6.00
BASINS FLOOR/SUSPENDED FURNACE 6.00
BATHTUBS BOILER/COMPRESSOR 6.00
SHOWERS REPAIR/ALTERATION 6.00
WATER HEATERS REFRIGERATION COMPRESSOR SYSTEM 6.00
AUTO.WASHER AIR HANDLING UNITS 7.50
SINKS HEAT-PUMPS 6.00
FLOOR DRAINS , EACH GAS PIPING SYS.2.00 PER OUTLET
DRINKING FOUNTAINS VENT.FAN SYS.3.00 PER UNIT ,ve
LAUNDRYTRAYS WOODSTOVES 5.00
CONNECT TO CITY SEWER WOOD FURNACE 5.00
DISHWASHER
DISPOSAL
URINALS / d
I
PERMIT BASIC FEE 3.00 PERMIT BASIC FEE 10.00
TOTAL ,. TOTAL
SPECIAL CONDITIONS: NOTICE: THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION
AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS,OR IF CONSTRUCTION OR WORK IS
SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME AFTER WORK IS
COMMENCED.
OWNERS AFFIDAVIT: I CERTIFY THAT I AM EXEMPT FROM THE REQUIREMENTS OF CONTRACTORS AFFIDAVIT: I CERTIFY THAT I AM A CURRENTLY REGISTERED
THE CONTRACT OR REGISTRATION LAW RCW 18.27, AND AM AWARE OF THE MASON CONTRACTOR IN THE STATE OF WASHINGTON AND I AM AWARE OF THE ORDINANCE
COUNTY ORDINANCE REQUIREMENTS FOR WHICH THIS PERMIT IS ISSUED AND THAT ALL REQUIREMENTS REGULATING THE WORK FOR WHICH THIS PERMIT IS ISSUED AND ALLVCO WORK DONE WILL BE I NFORMA E THEREWITH, NO CHANGES SHALL BE MADE WORK DONE WILL BE IN CONFORMANCE THEREWITH. NO CHANGES SHALL BE MADE
WITHOU--TFIR OB7Fjy GA V F M BUILDING DEPARTMENT. - WITHOUT FIRSTOBTAINING APPROVAL FROM THE BUILDING DEPARTMENT.
X OWNE DATE X BY DATE
OR OFFICE USE ONLY
APPLICATION ACCEPTED BY PLANS CHECK BY BUILDING GROUP APPROVED FOR ISSUANCE PERMIT VALIDATION
BY CASH CK MO
r ARCHITECTS KLAASSEN/DALKE, AIA
P. 0. BOX 1306 / 203 RAILROAD AVE.
SHELTON, WASHINGTON 98584
(206) 426-2550
DATE Sept. 1, 1989
NAME Addition to District's Fire Station No. 1, Mason County F.P.D. No. 16
ADDRESS West 4650 Dayton-Airport Road, Shelton, Washington 98584
PROJECT ADDRESS SAZ-
H E A T L 0 S S C A L C U L A T I O N S
MAIN FLOOR AREA 1344 S .F.
SECOND FLOOR/LOFT AREA N/A S . F.
BASEMENT FLOOR AREA ( if applicable) N/A S. F.
MAIN FLOOR VOLUME 12 , 224 C.F.
SECOND FLOOR VOLUME N/A C.F.
BASEMENT FLOOR VOLUME N/A C.F.
WALL AREAS : MAIN FLOOR 1432 S.F.
SECOND FLOOR N/A S .F.
BASEMENT N/A S.F.
WINDOW AREAS : MAIN FLOOR (7710) 93 S .F.
SECOND FLOOR N/A S .F.
BASEMENT N/A S .F.
ROOF AREAS 1344 S .F.
DOOR AREAS 60 S.F.
INFILTRATION (Number of Air Changes Per Hour) 1 . 5
INSIDE TEMPERATURE 7OOF
OUTSIDE TEMPERATURE 240F
ti
Page 3 - HEAT LOSS CALCULATIONS
4 . HEAT LOSS THROUGH FLOOR
t I
FLOOR COMPONENTS
Qc = A x AT Inside Air Film 0. 68
R Floor Covering 0• 05
Underlayment -0-
1344 x 46 Sub-Floor 0. 32
2 Insulation R-10 10. 00
Outside Air Film 0. 17
5, 510 BTUs/hour TOTAL
5 . HEAT LOSS THROUGH GLASS
GLASS COMPONENTS
Qc = A x LET Insulated Glass (double) ,
R Class 60 with electric
resistance . 1. 82
= 93 x 46 TOTAL 1. 82
1. 32
= 2, 350 BTUs/hour
6 . HEAT LOSS THROUGH EXTERIOR DOORS
DOOR COMPONENTS
Qc = A xi'l-T
R Solid Core Doors ?_ 78
TOTAL 2• 78
= 60 x 46
2. 78
993 BTUs/hour
TOTAL ESTIMATED HEAT LOSS 28 , 617 BTUs/hour
N/A = Not Applicable
All above based on drawings and specifications dated apt. 1, 1989
and components shown above. If all above requirements are met ,
this building will conform to Chapter 4 of the State Energy Code .
Should you have any questions, please let me know.
Sincerely,
Ha old E. Dalke , AIA
t
Page 2 - HEAT LOSS CALCULATIONS
1 . HEAT LOSS THROUGH AIR LEAKS
01 = . 018 x V x,6T x ACH
( constant) (volume) ( temp. diff . ) (air changes)
= . 018 x 12, 224 x 46 x 1 . 5
= 15, 182 BTUs/hour
2 . HEAT LOSS THROUGH WALLS
WALL COMPONENTS - MAIN FLOOR
Qc = A x AT Inside Air Film 0. 68
R Gypsum Board 5/8" 0. 56
j Insulation R-19 19 . 00
= 1432 x 46 Exterior Sheathing -0-
21. 39 Exterior Siding 5/8" 0. 98
Outside Air Film 0. 17
3, 080 BTUs/hour TOTAL 21. 39
WALL COMPONENTS - SECOND FLOOR
Qc = A x 4T Inside Air Film
R Gypsum Board
Insulation
j = x 46 Exterior Sheathing
Exterior Siding
Outside Air Film
BTUs/hour TOTAL N/A
WALL COMPONENTS - BASEMENT
Qc = A x 4 T Inside Air Film
R Gypsum Board
Insulation
x 46 Exterior Sheathing
Exterior Siding
Outside Air Film
BTUs/hour TOTAL 71 A
3 . HEAT LOSS THROUGH ROOF/CEILING
ROOF/CEILING COMPONENTS
Qc = A x �T Inside Air Film 0. 68
R Gypsum Board 5/8" 0 . 56
Insulation R-38 38. 00
= 1344 x 46 Exterior Sheathing 1 0 . 68
41. 15 Roofing 1. 06
Outside Air Film 0. 17
= 1, 502 BTUs/hour TOTAL 41. 15
MASON COUNTY
DEPARTMENT of GENERAL SERVICES
Courthouse Annex I N. Fourth & W. Cedar
P.O. Box 186 Shelton, Washington 98584
(206) 427-9670
building environmental health maintenance landfill parks&recreation fair/convention center planning sewer&water
Mr . Arthur Whitson March 6, 1989
Commissioner
Mason County Fire District #16
W. 4650 Dayton-Airport Road
Shelton , WA. 98584
Dear Commissioner Whitson ,
The Mason County Planning Staff has reviewed the plans for a
proposed addition to the existing fire station . According to the
Mason County Parking Standards, Ordinance No. 816, the submitted
plans, and the amount of usable floor space, it has been determined
that the proposed addition would require construction of an
additional parking space. The usable floor space totals
approximately 930 square feet. There should be a minimum of 1
parking stall for each 150 square feet of usable floor space in
addition to the minimum, one handicap parking stall . Please submit
a revised plot plan showing the information requested above. The
permit application will continue to be processed when we have
received this information . Thank you .
Sincerely,
Lenore Marken , Planner
Dept. of General Services
LM/lm
A�L�4, � ,,, -0 � c,� 4k,,. <Zs,_& v-�
I'
MASON COUNTY
DEPARTMENT of GENERAL SERVICES
Courthouse Annex 3 426 11. Cedar
P.O. Box 186 Shelton, Washington 98584
(206) 427-9670
building environmental health maintenance landfill Parks&recreation fair/convention center planning sewer&water
October 17, 1989
Mason Co. F.P.D. # 16
W 4650 Dayton Airport Rd.
Shelton, Washington 98584
Re: Building Permit for
Fire Station Addition
Dear Sir:
Some time ago you made application through this office to
obtain a building permit. Please be advised the permit is
ready to be issued and can be called for at this time.
If you are unable to call in person, a check in the amount
Of $ 575.85 can be sent to us and we will return your
permit by mail .
This permit becomes null and void if not called for within
180 days of the date of application.
We hope to hear from you soon.
Sincerely,
Evelyn Fuller
Receptionist
W E STS I D E-DAYTO N
FIRE DISTRICT #16
4650 Dayton Airport Road
P.�� Shelton, Washington 98584
FAR f DEQ� 426-7343
Hof•-K- - � �.�.A. V
o
tom
k\rr�- �a
L ,'�X . �
p
`O�.W�—� � -�..��C-f`r� O'll�-t=-- CZ.` 1'�,c��� C5`�� � Gv'�►'�� .
+-Ow,
t
r-\v.,r,�\S) j r\ 0..
1.��„r, cam,►, S �. .� �,..- ,�.,tom--,b
G
SIAAl
Si��