Loading...
HomeMy WebLinkAboutBLD24707 Addition - BLD Application - 11/2/1989 BUILDING PERMIT APPLICATION MASON COUNTY DEPARTMENT of GENERAL SERVICES P.O. BOX 186 SHELTON, WASHINGTON 98584 427-9670 DATE ISSUED ,[�� PERMIT NO;� / /Q ,� OWNER NAME MAI ADDRESS CITY BSTATE ZIP PHONE DIRECTIONS TO JOB SITE li f PARCEL LEGAL /l NUMBER DESCR. p NAME MAIL ADDRESS CITY 8 STATE LICENSE NO. ZI PHONE CONTRACTOR USE OF BUILDINGPA AvS CLASS OF NEW ADDITION ALTERATION REPAIR MOVE REMOVE WORK ✓ DESCRIBE WORK IS BEDROOMS DECKS CARPORT 12 NOTICE SEPARATE PERMITS ARE REQUIRED FOR PLUMBING, HEATING, VENTILATING OR AIR BATHROOMS_ TOTAL SQ.FT. GARAGE CONDITIONING. NO.OF STORIES BASEMENT ATTACHED THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT + COMMENCED WITHIN 180 DAYS, OR IF CONSTRUCTION OR WORK IS SUSPENDED OR TOTAL SQ.FT.,1 FIREPLACE DETACHED ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME AFTER WORK IS COMMENCED. PERMANENT SHORELINE SEASQNAL Y ERSAFFIDAVIT CONTRACTORS AFFIDAVIT IFY THAT I AM EXEMPT FROM THE REQUIREMENTS OF THE CONTRACTORS 1 CERTIFY THAT I AM A CURRENTLY REGISTERED CONTRACTOR IN THE STATE OF RATION LAW RCW 18.27, AND AM AWARE OF THE MASON COUNTY ORDINANCE WASHINGTON AND I AM AWARE OF THE ORDINANCE REQUIREMENTS REGULATING THE EMENTS FOR WHICH THIS PERMIT IS ISSUED AND THAT ALL WORK DONE WILL BE WORK FOR WHICH THE PERMIT IS ISSUED AND ALL WORK DONE WILL BE IN NFORMANCE THEREWITH. NO CHANGES SHALL BE MADE WITHOUT FIRST CONFORMANCE THEREWITH.NO CHANGES SHALL BE MADE WITHOUT FIRST OBTAINING INGAPPROVALF OM THE BUI IN DEPARTMENT. APPROVAL FROM THE BUILDING DEPARTMENT. X OWNER DATE X BY DATE FOR OFFICE USE ONLY DEPARTMENT APPROVED DEPARTMENT APPROVED BUILDING VALUATION P l 9i00 YES NO YES NO A. . HEALTH PUBLIC WORKS FEE PLANNING FIRE BUILDING PERMIT f ad D.O.T. I BUILDING PLAN CHECK ap SPECIAL CONDITIONS BUILDING GROUP PRE-INSPECTION SHORELINE WOODSTOVE PLUMBING MECHANICAL STATE BUILDING FEE STATESURCHARGE APPLICATION ACCEPTED BY PLANS C BY APPROVED FOR 1 UANCE PERMIT VALIDATION 16-75, �6 4` �� BY / CASH CK MO TOTAL PLUMBING & MECHANICAL PERMIT APPLICATION MASON COUNTY DEPARTMENT of GENERAL SERVICES P.O. BOX 186 SHELTON, WASHINGTON 98584 427-9670 DATE ISSUED PERMIT NO. NAME MAILADDRESS CITY&STATE ZIP PHONE OWNERmv DIRECTIONS / TO JOB SITE 100, LEGAL DESCR. , / J , CONTRACTOR NAME MAILADDRESS CITY&STATE LICENSE NO. ZIP PHONE USE OF _ BUILDING / PLUMBING FIXTURES MECHANICAL FIXTURES NO. 2.00 PER FIXTURE OR TRAP FEE NO. TYPE OF FIXTURE FEE WATER CLOSETS IMFORCED-AIR/GRAVITY TYPE FURNACE 6.00 BASINS FLOOR/SUSPENDED FURNACE 6.00 BATHTUBS BOILER/COMPRESSOR 6.00 SHOWERS REPAIR/ALTERATION 6.00 WATER HEATERS REFRIGERATION COMPRESSOR SYSTEM 6.00 AUTO.WASHER AIR HANDLING UNITS 7.50 SINKS HEAT-PUMPS 6.00 FLOOR DRAINS , EACH GAS PIPING SYS.2.00 PER OUTLET DRINKING FOUNTAINS VENT.FAN SYS.3.00 PER UNIT ,ve LAUNDRYTRAYS WOODSTOVES 5.00 CONNECT TO CITY SEWER WOOD FURNACE 5.00 DISHWASHER DISPOSAL URINALS / d I PERMIT BASIC FEE 3.00 PERMIT BASIC FEE 10.00 TOTAL ,. TOTAL SPECIAL CONDITIONS: NOTICE: THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS,OR IF CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME AFTER WORK IS COMMENCED. OWNERS AFFIDAVIT: I CERTIFY THAT I AM EXEMPT FROM THE REQUIREMENTS OF CONTRACTORS AFFIDAVIT: I CERTIFY THAT I AM A CURRENTLY REGISTERED THE CONTRACT OR REGISTRATION LAW RCW 18.27, AND AM AWARE OF THE MASON CONTRACTOR IN THE STATE OF WASHINGTON AND I AM AWARE OF THE ORDINANCE COUNTY ORDINANCE REQUIREMENTS FOR WHICH THIS PERMIT IS ISSUED AND THAT ALL REQUIREMENTS REGULATING THE WORK FOR WHICH THIS PERMIT IS ISSUED AND ALLVCO WORK DONE WILL BE I NFORMA E THEREWITH, NO CHANGES SHALL BE MADE WORK DONE WILL BE IN CONFORMANCE THEREWITH. NO CHANGES SHALL BE MADE WITHOU--TFIR OB7Fjy GA V F M BUILDING DEPARTMENT. - WITHOUT FIRSTOBTAINING APPROVAL FROM THE BUILDING DEPARTMENT. X OWNE DATE X BY DATE OR OFFICE USE ONLY APPLICATION ACCEPTED BY PLANS CHECK BY BUILDING GROUP APPROVED FOR ISSUANCE PERMIT VALIDATION BY CASH CK MO r ARCHITECTS KLAASSEN/DALKE, AIA P. 0. BOX 1306 / 203 RAILROAD AVE. SHELTON, WASHINGTON 98584 (206) 426-2550 DATE Sept. 1, 1989 NAME Addition to District's Fire Station No. 1, Mason County F.P.D. No. 16 ADDRESS West 4650 Dayton-Airport Road, Shelton, Washington 98584 PROJECT ADDRESS SAZ- H E A T L 0 S S C A L C U L A T I O N S MAIN FLOOR AREA 1344 S .F. SECOND FLOOR/LOFT AREA N/A S . F. BASEMENT FLOOR AREA ( if applicable) N/A S. F. MAIN FLOOR VOLUME 12 , 224 C.F. SECOND FLOOR VOLUME N/A C.F. BASEMENT FLOOR VOLUME N/A C.F. WALL AREAS : MAIN FLOOR 1432 S.F. SECOND FLOOR N/A S .F. BASEMENT N/A S.F. WINDOW AREAS : MAIN FLOOR (7710) 93 S .F. SECOND FLOOR N/A S .F. BASEMENT N/A S .F. ROOF AREAS 1344 S .F. DOOR AREAS 60 S.F. INFILTRATION (Number of Air Changes Per Hour) 1 . 5 INSIDE TEMPERATURE 7OOF OUTSIDE TEMPERATURE 240F ti Page 3 - HEAT LOSS CALCULATIONS 4 . HEAT LOSS THROUGH FLOOR t I FLOOR COMPONENTS Qc = A x AT Inside Air Film 0. 68 R Floor Covering 0• 05 Underlayment -0- 1344 x 46 Sub-Floor 0. 32 2 Insulation R-10 10. 00 Outside Air Film 0. 17 5, 510 BTUs/hour TOTAL 5 . HEAT LOSS THROUGH GLASS GLASS COMPONENTS Qc = A x LET Insulated Glass (double) , R Class 60 with electric resistance . 1. 82 = 93 x 46 TOTAL 1. 82 1. 32 = 2, 350 BTUs/hour 6 . HEAT LOSS THROUGH EXTERIOR DOORS DOOR COMPONENTS Qc = A xi'l-T R Solid Core Doors ?_ 78 TOTAL 2• 78 = 60 x 46 2. 78 993 BTUs/hour TOTAL ESTIMATED HEAT LOSS 28 , 617 BTUs/hour N/A = Not Applicable All above based on drawings and specifications dated apt. 1, 1989 and components shown above. If all above requirements are met , this building will conform to Chapter 4 of the State Energy Code . Should you have any questions, please let me know. Sincerely, Ha old E. Dalke , AIA t Page 2 - HEAT LOSS CALCULATIONS 1 . HEAT LOSS THROUGH AIR LEAKS 01 = . 018 x V x,6T x ACH ( constant) (volume) ( temp. diff . ) (air changes) = . 018 x 12, 224 x 46 x 1 . 5 = 15, 182 BTUs/hour 2 . HEAT LOSS THROUGH WALLS WALL COMPONENTS - MAIN FLOOR Qc = A x AT Inside Air Film 0. 68 R Gypsum Board 5/8" 0. 56 j Insulation R-19 19 . 00 = 1432 x 46 Exterior Sheathing -0- 21. 39 Exterior Siding 5/8" 0. 98 Outside Air Film 0. 17 3, 080 BTUs/hour TOTAL 21. 39 WALL COMPONENTS - SECOND FLOOR Qc = A x 4T Inside Air Film R Gypsum Board Insulation j = x 46 Exterior Sheathing Exterior Siding Outside Air Film BTUs/hour TOTAL N/A WALL COMPONENTS - BASEMENT Qc = A x 4 T Inside Air Film R Gypsum Board Insulation x 46 Exterior Sheathing Exterior Siding Outside Air Film BTUs/hour TOTAL 71 A 3 . HEAT LOSS THROUGH ROOF/CEILING ROOF/CEILING COMPONENTS Qc = A x �T Inside Air Film 0. 68 R Gypsum Board 5/8" 0 . 56 Insulation R-38 38. 00 = 1344 x 46 Exterior Sheathing 1 0 . 68 41. 15 Roofing 1. 06 Outside Air Film 0. 17 = 1, 502 BTUs/hour TOTAL 41. 15 MASON COUNTY DEPARTMENT of GENERAL SERVICES Courthouse Annex I N. Fourth & W. Cedar P.O. Box 186 Shelton, Washington 98584 (206) 427-9670 building environmental health maintenance landfill parks&recreation fair/convention center planning sewer&water Mr . Arthur Whitson March 6, 1989 Commissioner Mason County Fire District #16 W. 4650 Dayton-Airport Road Shelton , WA. 98584 Dear Commissioner Whitson , The Mason County Planning Staff has reviewed the plans for a proposed addition to the existing fire station . According to the Mason County Parking Standards, Ordinance No. 816, the submitted plans, and the amount of usable floor space, it has been determined that the proposed addition would require construction of an additional parking space. The usable floor space totals approximately 930 square feet. There should be a minimum of 1 parking stall for each 150 square feet of usable floor space in addition to the minimum, one handicap parking stall . Please submit a revised plot plan showing the information requested above. The permit application will continue to be processed when we have received this information . Thank you . Sincerely, Lenore Marken , Planner Dept. of General Services LM/lm A�L�4, � ,,, -0 � c,� 4k,,. <Zs,_& v-� I' MASON COUNTY DEPARTMENT of GENERAL SERVICES Courthouse Annex 3 426 11. Cedar P.O. Box 186 Shelton, Washington 98584 (206) 427-9670 building environmental health maintenance landfill Parks&recreation fair/convention center planning sewer&water October 17, 1989 Mason Co. F.P.D. # 16 W 4650 Dayton Airport Rd. Shelton, Washington 98584 Re: Building Permit for Fire Station Addition Dear Sir: Some time ago you made application through this office to obtain a building permit. Please be advised the permit is ready to be issued and can be called for at this time. If you are unable to call in person, a check in the amount Of $ 575.85 can be sent to us and we will return your permit by mail . This permit becomes null and void if not called for within 180 days of the date of application. We hope to hear from you soon. Sincerely, Evelyn Fuller Receptionist W E STS I D E-DAYTO N FIRE DISTRICT #16 4650 Dayton Airport Road P.�� Shelton, Washington 98584 FAR f DEQ� 426-7343 Hof•-K- - � �.�.A. V o tom k\rr�- �a L ,'�X . � p `O�.W�—� � -�..��C-f`r� O'll�-t=-- CZ.` 1'�,c��� C5`�� � Gv'�►'�� . +-Ow, t r-\v.,r,�\S) j r\ 0.. 1.��„r, cam,►, S �. .� �,..- ,�.,tom--,b G SIAAl Si��