Loading...
HomeMy WebLinkAboutMEP2018-00028 - MEP Application - 12/20/2018 Mason County Permit Center Use: MASON COUNTY COMMUNITY SERVICES MEP Zo \ Building,Planning,Environmental Health,Community Health Date Rcvd ( off '07�•orb l � 615 W.Alder St.—Bldg.8,Shelton,Wa 98584 Phone:(360)427-9670 ext.352 ♦ Fax:(360)427-7798 ❑ MASON ENVIRONMENTAL PERMIT:$115 MASON ENVIRONMENTAL PERMIT WITH HABITAT MANAGEMENT PLAN:S 1500 ❑ CONDITIONAL USE: S2000 Mason County Resource Ordinance(Chapter 8.52 MCC) ENVIRONMENTAL PERMIT APPLICATION The purpose of the Resource Ordinance is to protect Mason County's natu source lands and critical areas and is under the authority of Chapters 36.32,36.70A, 39.34, 58.17,76.09, 84.33, and 90.58 RCW. PLEASE PRINT 1. PROPERTY OWNER Name: Glenn Carlson(Commissioner)-Port of Grapeview Mailing Address: PO Box 3,Grapeview, WA 98546 Work Phone: (360)275-5020 Email : portofgrapeview2@gmail.com Home/Cell Phone: (206)200-5452 If an agent is acting for the property owner-dutig the per ocess, complete#2. 2.AUTHORIZED AGENT ; . Name: nn Boeholt,Sound. iew Consultants C Marling A ess: 2907 Har rview Drive, Suite D, Gig Harbor, WA 98335 Wo Phone: (253)514-8952 Email Address: ann@soundviewconsultants.com Home/Cell Phone: Fax# (253)514-8954 3. PROJEC ITE Legal Description: That portion of the following described 505Jp , eview Loop Road parcel lying 25' westerly of the bulkhead existing at the time of this Site Address. GraWA 98546 restrictive covenant signing: Lots 7, 8, 13 and 14, block 63, Detroit NO.2, as recorded in volume 1 of plats, page 23,records of Mason County, Washington,together with vacated alley between Parcel#: 12105-51 -63003 lots 7 and 8,and lots 13 and 14,in said block 63. Starting from Allyn,WA,drive south 0.8 miles on State Route 3,After crossing Sherwood Creek Bridge,turn left Directions to Site: onto Grapeview Loop Road and travel 3 miles. Turn left onto Griswold Avenue. The Port of Grapeview boat ramp is just north of Fair Harbor Marina.The shoreline restoration site is one parcel north of the boat ramp,along the shoreline. Attach a site plan showing the following: Lot Dimensions,Flood Zones,Existing Structures,Fences, Water Lines,Driveways,Drainage Plans,Shorelines,Septic System,Topography,Proposed Improvements,Easements,North Arrow,and Scale. Also draw a separate topography diagram. Rev. March 1,2018 4. State which section requires permit: ❑ Long Term Commercial Forest,Chapter 8.52.060 IN Frequently Flooded Areas,Chapter 8.52.130 ❑ Mineral Resource Lands,Chapter 8.52.090 ❑ Geologically Hazardous Areas,Chapter 8.52.140 ❑ Critical Aquifer Recharge Areas,Chapter 8.52.120 ❑ Seismic Hazard Areas,Chapter 8.52.150 ❑ Erosion Hazard Area,Chapter 8.52.160 12 Fish&Wildlife Habitat Conservation Areas,Chapter ❑ In-Holding Lands,Chapter 8.52.070 8.52.170 ❑ Wetlands,Chapter 8.52.110 5. Identify current use of the property with existing improvements: The subject property is undeveloped,with a dysfunctional creosote timber pile bulkhead present along the shoreline. 6. Identify and describe the proposed project, including the type of materials to be used,construction methods, principle dimensions,and other pertinent information(attach additional sheets, if needed): The proposed shoreline restoration includes sloping back the eroding back to a grade not to exceed 2:1, installation of a gravel path to the beach, burying boulders which will serve as anchors for large beach logs, placing logs with rootwads, embedding widely spaced boulders to further hold the logs and the beach material, place biodegradable jute matting upon the re-graded slope,and planting the shoreline(upper shore zone and slope)with native shore-friendly vegetation. 7. Describe why the action requiring this permit cannot be avoided. The proposed shoreline stabilization and restoration is phase 2 of mitigation that is to be provided to compensate for potential impacts to aquatic habitat areas from the proposed Port of Grapeview community floating dock. Phase 1 is the demolition and removal of a dysfunctional creosote timber bulkhead. The proposed shoreline stabilization will arrest shoreline erosion and restore natural habitat conditions along the shoreline. 8. Will there be an alteration of a wetland and/or wetland vegetation area(circle one)? Yes No 9. Identify any surface water on or adjacent to property(circle one): Saltwater Lake Stream Pond Wetland Drainage Ditch 10. Identify existing septic/sewer connection(circle one): If septic is located on project site, include records. Connected to Septic Connected to Community Septic 11. Identify existing water supply(circle one): Public Water Supply Well 11. Type of Job (circle one): New Add Alteration Repair Demolition Other: Shoreline Restoration Ann Boeholt December 6,2018 Print Name Signature Date Rev.March 1,2018