HomeMy WebLinkAboutGEO2018-00073 - GEO Geological Review - 12/20/2018 Coo 2b �8 -0�0�3
GEORESOURCES
earth science & geotechr:ical engineering
5007 Pacific Hwy E., Suite 16 Fife, WA 98424 253.896.1011 www.georesources.rocks
Se tember 28, 2018
Port of Grapeview
c/o Soundview Consultants
2907 Harborview Drive, Suite D
Gig Harbor, Washington 98335
Attn: Ms.Ann Boeholt, PWS
(253)514-8953 ext 020
ann@soundviewconsultants.com
ngineering gy Report
oposed Shoreline Restoration
Jx ,,,4.peview Loop Road
Mason County, Washington
PN: 121055163003
'Doc ID: PortofGrapeview.GrapeviewLoop.RG
INTRODUCTION
This geotechnical eri' r,port summarizes our site observations, our geotechnical data
review and engineering nalys and provides geotechnical recommendations for the proposed
shoreline restoration to cate at xxx-Grapeview Loop Road near the Port of Grapeview in Mason
runderstand
Washi as n on the Site Location Map, Figure 1.
Our u er di the project is based on our correspondence with Ann Boeholt of
iew Co ultan ur September 20, 2018 site visit, and our experience in the site area. We
tha e P rt of Grapeview is planning to install a new floating dock to provide short term
e to users existing public boat ramp located at Grapeview Loop Road and that the Army
f Engines is requiring mitigation for potential aquatic impacts. We further understand that
the Port of Gra*view proposes to purchase an adjacent parcel that has a creosote timber pile
ulkhead that ` dysfunctional, and proposes to remove the old timber pile and wood lagging
khead an place it with large woody debris soft armoring.
SCOPE
The purpose of our services was to evaluate the surface and subsurface conditions at the site
as a basis for assessing potential impacts to and from the wave and tidal erosion on the shoreline
portion of the parcel. Specifically,our scope of services for the project included the following:
1. Conducting a geologic reconnaissance of the site area;
2. Observing subsurface conditions at the site by logging the soils exposed along the beach;
3. Describing surface and subsurface conditions, including soil type;
4. Providing conclusions and recommendations regarding the type of bulkhead and
alternative materials;
PortofGrapeview.G rap eviewLoop Rd.RG
September 28,2018
Page 1 2
5. Preparing this written Geotechnical Engineering Report summarizing our site observations
and conclusions, and our geotechnical recommendations and design criteria, along with
the supporting data.
The above scope of work was summarized in our Proposal for Geo technical Engineering Services
dated September 18, 2018. We received your written authorization to proceed on September 19,
2018.
SITE CONDITIONS
Surface Conditions
The subject mitigation site is located at xxx Grapeview Loop Road, two lots north of the Port
of Grapeview boat ramp and marina in Mason County, Washington. According to the Mason County
WA GIS website,the parcel is roughly flag-pole in shape. The"flag'portion is approximately 60 feet wide
(north to south) by about 218 to 236 feet deep(east to west). The"pole"section of the parcel measures
about 20 feet wide by about 74 to 82 feet deep. The entire site area encompasses approximately 0.31
acres. The site is currently undeveloped except for the failing creosote timber bulkhead. The site is
bounded by the residence located at 5054 E Grapeview Loop Road to the south, by Grapeview Loop
Drive to the west,the residence at 5100 E Grapeview Loop Road to the north,and by the Puget Sound
to the east.
From Grapeview Loop Road, the site slopes down from the northwest to the southeast at
about 10 percent or less. The shoreline portion of the site is generally vertical and about 4 feet tall.
Total topographic relief across the site is on the order of 15 feet. The current site configuration is
shown on the Site Vicinity Map, Figure 2.
Vegetation in the upland portion of the site consists of grasses and scattered deciduous trees
in the west portion of the site. No seeps were observed on the slopes at the time of our site visit. As
stated, the old timber pile/wood lagging bulkhead that extended along the shoreline portion of the
site is failing and tidal scour is occurring behind the old bulkhead. Scour has extended back as far as
9 to 10 feet from the face of the old bulkhead. No other evidence of upland erosion, landslide activity
or deep-seated slope instability was observed at the site at the time of our site visit. The adjacent
parcels to the north and south are protected by concrete cast-in-place bulkheads.
Site Soils
The USDA Natural Resource Conservation Service (NRCS) Web Soil Survey maps the soils in
the area of the site as Alderwood gravelly sandy loam(Ab)soils. The Alderwood soils are derived from
glacial drift or glacial outwash over dense glaciomarine deposits and form on slopes of 8 to 15 percent.
These soils have a"moderate to severe"erosion hazard when exposed,and are included in hydrologic
soils group B. A copy of the SCS map for the site vicinity is attached as Figure 3.
Site Geology
The Geologic Map of the Vaughn 7.5-minute Quadrangle, Pierce and Mason Counties, Washington
(Logan et Al., 2007) indicates the site is underlain by Vashon glacial till (Qgt) deposits. The glacial till
soils were deposited during the most recent Vashon Stade of the Fraser Glaciation some 12,000 to
15,000 years ago. The glacial till consists of a heterogeneous mixture of gravel,sand,silt and clay that
was deposited at the base of the continental ice mass, and was subsequently over-ridden. As such,
GEORESOURCE
PortofG rap eview.G rap eviewLoop Rd.RG
September 28,2018
page 1 3
the glacial till is considered to be over consolidated and generally exhibits high strength and low
compressibility characteristics where undisturbed. The near surface soils at the site have been
disturbed by natural weathering processes that have occurred since their deposition. An excerpt of
the above referenced map is included as Figure 4.
The Washington State Department of Ecology (DOE) Coastal Atlas maps the site as being
"stable". We also reviewed a series of oblique aerial photos from 1992 to 2016 which show minor
erosion along the shoreline from 2000 to 2016. The Coastal Zone Atlas also shows the drift cell current
as undefined in the site area. A copy of the Coastal Zone Atlas is attached as Figure 5,while copies of
the aerial photographs are attached as Figures 6a through 6d.
Subsurface Conditions
We were able to observe subsurface conditions at the site by logging the bare soils along the
shoreline. We observed about 6 inches of sod and topsoil mantling about 18 to 24 inches of light orange-
brown silty sand with gravel that appeared to be medium dense and moist. These soils appeared to be
consistent with weathered glacial till soils. Underlying the surficial soils, we observed grey/tan with
orange mottling silty sand with gravel that appeared dense and moist. These soils appear to be
consistent with glacial till deposits.The glacial till extended down to the beach sand and gravel.
ENGINEERING CONCLUSIONS AND RECOMMENDATIONS
Based on our site evaluation, it is our opinion that an active shoreline erosion hazard does
exist at the site. The combination of shoreline tidal and wave action is resulting in active toe erosion,
sloughing and shoreline regression. We recommend that new soft armoring be installed to prevent
additional erosion at the site. The new soft armor bulkhead will be constructed at the toe of the active
shoreline area, landward of old timber pile bulkhead, Mean High Water (MHW) and Ordinary High
Water(OHW)and tie into the adjacent concrete cast-in-place bulkheads.
Bulkhead Materials
We understand that the selected material for replacement bulkhead is large woody debris
with scattered large rocks used to hold the ends of the woody debris in place. There are a variety of
alternative materials that may be considered for the construction of shoreline bulkheads. Virtually all
shoreline protection construction methods and materials require beach access and/or beach
disturbance. In general, the shoreline protective materials can be divided into three basic types,
including the following: cast-in-place construction materials (concrete), placed materials(rock, blocks
and timber), and "soft armor" materials(anchored large woody debris).
Based on our experience, although poured in-place concrete bulkheads provide excellent
protection of the shoreline from erosion, they are not a preferred alternative by regulatory staff
because of water quality issues during construction and redirection or reflection of shoreline energy
often resulting in scour on the adjacent properties.
Large rock, block or treated timber materials are common bulkhead materials in the Puget
Sound area. Treated timber materials provide adequate protection of the toe, but are not considered
permanent, as illustrated by the number of timber bulkheads that are replaced on a regular basis
owing to damage, rot or decay.The treated timber materials are also considered to have water quality
issues by some agency staff,depending on the treatment(creosote). Because the permitted structure
GEORESOURCES
PortofGrapeview.G rap eviewLoop Rd.RG
September 28,2018
page 1 4
would not be at risk of failure within 3 years, the state agencies would not support the use of hard
armoring.
We understand that you propose to use soft armoring to mitigate the toe erosion along the
shoreline. Although technically not a bulkhead, anchored large wood placed at or near the toe of the
shoreline bank and beach area can provide limited erosion protection for the toe of the shoreline.
The large wood does have a limited life expectancy and requires maintenance and possibly occasional
replacement, but should adequately mitigate toe erosion at the site.
It is our opinion that the use of soft armoring will reduce the rate of shoreline regression and
will provide opportunity for biologic activity and variation of the energy dissipation patterns along the
shoreline. The shoreline across the front of the site faces east towards Reach Island and has a fetch
of less than 1,000 feet to the east, and 1,250 to 1,400 feet to the southeast and northeast respectively.
The fetch to the southeast is interrupted by the exiting Port of Grapeview Marina. The predominant
winter storm direction results in severe, damaging winds from the south and southwest, which the
site is not subject too. Also, the Washington State Department of Ecology Coastal Atlas indicates that
the site does not have "any appreciable drift". Given the short fetch, east facing direction of the
shoreline, and little to no drift current along the shoreline, the use of soft armoring does appear
feasible from a geotechnical standpoint.
The anchored large woody debris should abut the adjacent cast-in-place concrete bulkheads
so as to not result in scour eddies or sediment traps. The logs should be installed along the new
"active" shoreline behind the failing bulkhead. The irregular shape of the logs, and the voids
associated with the soft armoring,will absorb most of the wave energy(tidal and boat traffic)thereby
reducing the potential for erosion to the site and adjacent properties. The large wood should be
anchored by using cable or chains attached to buried deadman anchors(ecology blocks)or to helical
or manta ray type anchors. We do recommend using occasional placement of individual rocks near
the end of each log in order to hold the logs in place. A typical detail for a soft armor bulkhead is
attached as Figures 7a and 7b.
It is our opinion that large woody debris and placement rock, if properly installed, should
mitigate against the active erosion. While the soft armoring will be an effective method of addressing
the active and ongoing erosion,this system will not fully eliminate or stop tidal and wave energy from
impacting the site.
LIMITATIONS
We have prepared this report for use by Port of Grapeview, Soundview Consultants, and other
members of the design and construction team, for use in the design of a portion of this project. The
data used in preparing this report and this report should be provided to prospective contractors for
their bidding or estimating purposes only. Our report, conclusions and interpretations are based on
data from others and limited site reconnaissance, and should not be construed as a warranty of the
subsurface conditions.
Variations in subsurface conditions across the site are possible and may also occur with time. A
contingency for unanticipated conditions should be included in the budget and schedule. Sufficient
monitoring,testing and consultation should be provided by our firm during construction to confirm that
the conditions encountered are consistent with those indicated by the explorations, to provide
recommendations for design changes should the conditions revealed during the work differ from those
GEORESOURCES
PortofGrapeview.GrapeviewLoopRd.RGu
September 28,2018
page 1 5
anticipated, and to evaluate whether earthwork and foundation installation activities comply with
contract plans and specifications.
The scope of our services does not include services related to environmental remediation and
construction safety precautions. Our recommendations are not intended to direct the contractor's
methods, techniques, sequences or procedures, except as specifically described in our report for
consideration in design.
Within the limitations of scope, schedule and budget, our services have been executed in
accordance with generally accepted practices in this area at the time this report was prepared. No other
conditions, express or implied,should be understood.
We have appreciated the opportunity to be of service to you on this project. If you have any
questions or comments, please do not hesitate to call at your earliest convenience.
Respectfully submitted,
GeoResources, LLC
Jordan Kovash, GIT
Staff Geologist in Training
e°{ Wash��
Engineering Geologist `
�� 3�72�rp 5~ �iC 925 �5
ceased Ge°\° . ��sed Ge°�°121��tY
Seth Mattos KEITH SCOTT SCHEMBS
Seth T. Mattos, LG Keith S. Schembs, LEG
Associates Principal
J LK:STM:KSS/j Ik,kss
Doc ID:PortofGrapeview.GrapeviewLoopRd.RG
Attachments: Figure 1:Site Location Map
Figure 2:Site Vicinity
Figure 3:NRCS Soils Map
Figure 4:Geology Map
Figure 5:Coastal Zone Atlas
Figures 6a-6d:Oblique Aerial Photos
Figure 7a:Soft Shore Stabilization Site Plan
Figure 7b:Soft Shore Stabilization Detail
Figures 8a-8c:Site Photographs
GEORESOURCES
Ni►3oz-
f
1
t -
i
1
t
t
1
I I
Grapeview
s �
le
J�
a41 ♦ j
E8
,
r
t
Approximate Site Location
Map created from Mason County Public GIS (https://gis.co.mason.wa.us/mason/)
Ir +(F
S Not to Scale
Site Location Map
Proposed Soft Armor and Shoreline Mitigation
xxx Loop RoadGEORESOURCES Mason County,
Washington
earth science & geotechnical engineering PN: 1 21 0551 63003
5007 Pacific Hwy E.,Suite 16 1 Fife,WA 98424 1253.896.1011 1 www.8eoresources.rocks
Doc ID:PortofGrapeview.GrapeviewLoopRd.F September 2018 Figure 1
l
N
r t.
,
ak AL
x
a' •101111 i
. t{
1
Approximate Site Location
Map created from Mason County Public GIS(https://gis.co.mason.wa.us/mason/)
cn
S Not to Scale
Site Vicinity Map
Proposed Soft Armor and Shoreline Mitigation
xxx Grapeview Loop Road
GEORESOURCES �
Mason County, Washington
PN: 121055163003
earth science & geotechnical engineering
5007 Pacific Hwy E.,Suite 16 1 Fife,WA 98424 1 253.696.1011 I www.6eoresources.rocks Doc ID:PortofGrapeview.GrapeviewLoopRd.F September 2018 Figure 2
%
_J
f
4
�y
s�
y f
E �fi
Approximate iite Location
Map created from Web Soil Survey(http://websoilsurvey.sc.egov.usda.gov/App/WebSoilSurvey.aspx)
Soil Soil Name Parent Material Slopes Erosion Hydrologic
Type Hazard Soils Group
Ab Alderwood gravelly Glacial drift and/or glacial outwash over dense g to 15 Moderate B
sandy loam glaciomarine deposits to Severe
Bellingham silty None to
Be clay loam Alluvium. Lacustrine deposits and loess 0 to 3 slight C/D
IW+IE
5 Not to Scale
NRCS Soils Map
►— Proposed Soft Armor and Shoreline Mitigation
xxx Grapeview Loop Road
GEORESOURCES Mason County, Washington
PN: 121055163003
earth science & geotechnical engineering
5007 Pacific Hwy E.,Suite 16 1 Fife,WA 98424 1253.996.1011 1 www.georesources.rocks Doc ID:PortofGrapeview.GrapeviewLoopRd.F September 2018 Figure 3
f
f
o i
Soo .All a
•• 2. 1
d
1 a• r
Approximate Site Location
An excerpt from Geologic Map of the Vaughn 7.5-minute Quadrangle, Pierce and Mason Counties, Washington by Robert L.,
Logan,and Timothy J.Walsh December 2007.
Qgt Vashon till
<k
S Not to Scale
USGS Geologic Map
Proposed Soft Armor and Shoreline Mitigation
xxx Grapeview Loop Road
GEORESOURCES 'I Mason County, Washington
PN: 121055163003
earth science & geotechnical engineering
5007 Pacific Hwy E.,Suite 16 1 Fife,WA98424 1253.896.1011 I www.georesources.racks Doc ID.PortofGrapeview.GrapeviewLoopRd.F September 2018 Figure 4
e
Opp Case Inlet
Approximate Site Location
Map created from Washington State Coastal Atlas(https://fortress.wa.gov/ecy/coastalatlas/tools/Map.aspx)
Slope stability A Drift cells g
Stable %1 Divergence zone
Intermediate .—.+► Left to right
Modified %�- No appreciable drift
Unstable "►Right to left
y Unstable(old slide) .-4- Undefined
Unstable (recent slide)
1�
5 Not to Scale
Coastal Zone Atlas
Proposed Soft Armor and Shoreline Mitigation
GEORESOURCES xxx Grapeview Loop Road
Mason County, Washington
earth science & geotechnical engineering PN: 121055163003
5007 Pacific Hwy E.,SuIte 16 I Fife,WA 90424 1253.896.1011 I www.`eoresources.rocks
Doc ID:PortofGrapeview.GrapeviewLoopRd.F September 2018 Figure 5
4
a
r -
1
r
,_
v
{
Approximate Site Location
Photo obtained from Washington State Coastal Atlas (https://fortress.wa.gov/ecy/coastalatlas/tools/Map.aspx)
1�
5 Not to Scale
Oblique Aerial Shoreline Photograph - 2016
Proposed Soft Armor and Shoreline Mitigation
GEORESOURCES xxx Grapeview Loop Road
Mason County, Washington
earth science & geotechnical engineering PN: 1 21 0551 63003
5007 Pacific Hwy E.,Suite 16 I Fife,WA 98424 1253.816.1011 I www.8eoresources.rocks
Doc ID:PortofGrapeview.GrapeviewLoopRd.F September 2018 Figure 6a
11. 1:
F �
F, ti
. r.
a
i
F
r{ l 9
' to C
n
i
F.
t Sf ; 4
y � _
1
Approximate Site Location
Photo obtained from Washington State Coastal Atlas (https://fortress.wa.gov/ecy/coastalatlas/tools/Map.aspx)
S Not to Scale
Oblique Aerial Shoreline Photograph - 2006
Proposed Soft Armor and Shoreline Mitigation
GEORESOURCES xxx Grapeview Loop Road
Mason County, Washington
earth science & geotechnical engineering PN: 121055163003
5007 Pacific Hwy E.,SuIte 16 I FIfe,WA 99424 1253.896.1011 i www.jeoresources.rocks
Doc ID:PortofGrapeview.GrapeviewLoopRd.F September 2018 TFigure 6b
4W- --
R
..-ram a• A:.
Approximate Site Location
Photo obtained from Washington State Coastal Atlas (https://fortress.wa.gov/ecy/coastalatlas/tools/Map.aspx)
tX
5 Not to Scale
Oblique Aerial Shoreline Photograph - 2000
Proposed Soft Armor and Shoreline Mitigation
GEORESOURCES xxx Grapeview Loop Road
Mason County, Washington
earth science & geotechnical engineering PN: 1 21 0551 63003
5007 Pacific Hwy E.,Suite 16 I fife,WA 96124(2S3.896.1011 I www.6eoresources.rocks
Doc ID:PortofGrapeview.GrapeviewLoopRd.F September 2018 Figure 6c
Approximate Site Location
Photo obtained from Washington State Coastal Atlas(https://fortress.wa.gov/ecy/coastalatlas/tools/Map.aspx)
t�
5 Not to Scale
Oblique Aerial Shoreline Photograph - 1992
Proposed Soft Armor and Shoreline Mitigation
GEORESOURCES xxx Grapeview Loop Road
Mason County, Washington
earth science & geotechnical engineering PN: 121055163003
S007 Pacific Hwy E.,Suite 16 1 File,WA 98424 1 253.896.1011 I www.georesources.rocks
Doc ID:PortofGrapeview.GrapeviewLoopRd.F September 2018 Figure 6d
EXISTING EXISTING
CONCRETE
CONCRETE
BULKHEAD
BULKHEAD
APPROX.EXTENT OF
REGRADED SHORELINE
APPROX.EXTENT TO BLEND INTO EXISTING OF ERODING SLOPE/ BURY BOULDER WITH UPLAND TERRACE(SEE /
SHORELINE SCOUR APPROX.ALIGNMENT OF CROSS-SECTION SHEET 8) CHAIN MIN.3 FEET TO
DYSFUNCTIONAL ANCHOR LOGS(TYP.)
TIMBER PILE BULKHEAD
` Jr PROVIDE 7-X WIDTH ANCHOR 3 TO 4 IA,)
/ EXISTING TIMBER PILE GRAVEL PATH TO BEACH LOGS O MIN.DIA)
(1 f TO BE REMOVED- WITH D BOULDERS
TO
APPROX-34 ABOVE SUBSTRATE, BURIED BOULDERS
O APPROX.10 BELOW SUBSTRATE PLANT SHORELINE EMBED BOULDERS 38"TO 42"DIA.
WITH NATIVE SPECIES TO DEPTH OF 1 FOOT OR I HEIGHT,
/ (SEE CROSS-SECTION / (1 OR 2 PER LOG)
ON SHEET 8&PLANT /
LIST ON SHEET 9) APPROX.OHW
/ APPROX_OHW APPROX.MHHW
/ APPROX.MHHW REGRADE ERODED SLOPE APP X.
1418 ELEV. TO MAX.2:1 SLOPE / ° GRADE SLOPE(AFTER
PILES)_o I REMOVAL OF BULKHEAD AND
SLOPEEXISTING
BEACH GRADE TO OHW
PACIIIFIC / BURY BOULDER WITH CHAIN
OYSTERBED
j l+ TO ANCHOR LOG OW.)SEE /
/ b CROSS-SECTION ON SHEET 8
EXISTING / EXISTING 7/ft/
/
CONCRETE / CONCRETE BULKHEAD gU( (EAp /
EXISTING SHORELINE CONDITIONS PROPOSED SHORELINE STABILIZATION AND MITIGATION
NOTES: Soft Shore Stabilization Site Plan
Site Plan provided by Soundview Consultants,LLC t
Proposed Shoreline Stabilization
Not to Scale NORTH G E O R E S O U RC E S xxx-Grapeview Loop Road
Mason County,Washington
earth science&geotechnical engineering PN:121055163003
S002 ewllt H,L.Sidle 16 1 611e,WA 51026 1 253.896.1011 1—.1eerwewtef.ret6f
Doc ID:PortofGrapeview.GrapeviewLoopRd.SP December 2018 Figure 7a
APPROX.14'
2V
EXISTING
is, ERODED SLOPE
APPROX.LOCATION AND UPLAND
OF PREVIOUS PILE NATIVE
18, BULKHEAD AND SHORELINE UPLAND _ �'--_� IUPLANDPLANTS
LOGS WITH I\ JUTE MAT SLOPE
is ROOTWADS / ROUNDING
I OCCASIONAL /
AT GRADE
1 SLOP RE-GRADE SLOPE TRANSITION
I EMBEDDED BOULDER 6: � (MAX 2:7 SLOPE)
15• 36"TO 42"DIM-
0 OR 2 PER LWD)
11
F t HwBURIED BOULDER
u-1e WITH DRILLED HOLE
GALV-STEEL CHAIN j FOR ANCHORING
(OR SUBSTITUTE APPROVED CHAIN(TOP OF T MIN.
13' BY PROJECT BIOLOGIST) BOULDER 3'BELOW
SUFFICIENT TO SECURE BEACH GRADE)
I LOAD OF LOG PULTNUNARY
EXISTING INFOTION ONLY
I SLOPE
iI I NOT FOR CONSTRUCTION
1 I
CROSS-SECTION-MITIGATION AREA 2
SHORELJINE STABELIZATION
Elevation/Section provided by Soundview Consultants, LLC
S Not to Scale
Soft Shore Stabilization Detail
�- Proposed Soft Armor and Shoreline Mitigation
xxx Grapeview Loop Road
GEORESOURCES Mason County, Washington
PN: 121055163003
earth science & geotechnical engineering
5007 Pacific Hwy E.,Suite 16 1 Fife,WA 98424 1253.896.1011 1 www.seoresources.rocks Doc ID:PortofGrapeview.GrapeviewLoopRd.F December 2018 Figure 7b
' �',�'z7,••;; ;h 4..0 .
Photo - Sept 20, 2018
Looking north along failing bulkhead from south property line.
S Not to Scale
Site Photographs
Proposed Soft Armor and Shoreline Mitigation
GEORESOURCES xxx Grapeview Loop Road
Mason County, Washington
earth science & geotechnical engineering PN: 121055163003
5007 Pacific Hwy E.,Suite 16 I Fite.WA 96024 1253.E96.1011 I www.Storesources.rocks
Doc ID:PortofGrapeview.G rap eviewLoop Rd.F September 2018 Figure 8a
x
�IIrwr`!
1
Looking • bulkhead
Site Photographs
MasonProposed Soft Armor and Shoreline Mitigation
xxx Grapeview Loop Road
GEORESOURCES • Washington
earth science & • ' 121055163003
►� K
�'C/ � +- � •rig � - °1,.
oroMILDIR m .,• •Lo .•• .•• ••••• •• •• 1