HomeMy WebLinkAbout161-91 - Res. 1992 Annual Road Construction ProgramPAGE!
1992 ANNUAL CONSTRUCTION PROGRAM
(7) FUNCTIONAL CLASSIFICATION CODE
06 MINOR ARTERIAL, RURAL
07 MAJOR COLLECTOR, RURAL
08 MINOR COLLECTOR, RURAL
09 ACCESS, RURAL (0R LOCAL
SYSTEM, RURAL)
CRAB FORM 10. 3 (REV. 11-80
(1) (2) (3)
1
IA
2
3
4
5
6 YEAR
ROAD
PROGRAM
ITEM
10.
162
CARRY OVER
4,566
9
ROAD
LOG
10.
02070
15 PRINCIPAL ARTERIAL,
16 KIIOR ARTERIAL, I tAN
17 COLLECTOR ARTERIAL,
19 LOCAL SYSTEM, URBAN
(4)
ROAD NAME AID/OR
BRIDGE
COUNTT SIDE
AC Pavement
1991 AC Carry Over
BST Pavement
Sub -base Repair, Minor
Construction
Upgrading Gravel Roadi
CONSTRUCTION PROJECTS
BRIDG65
Schafer State Park Bridge
ROADS
6 18 23910 Agate Road -1
7 19 23910 Agate Road -2
8 20 23910 Agate Road -3
(8) TYPE 0? WORE CODE
. GRADING AND DRAINING
. BASE AND TOP COURSE
. BITUMINOUS SURFACE
TREATMENT
. A.C. 0R C.C. PAVEMENT
(5) (6)
LOCATION
LENGTH
M.P. to N.P. TOTAL
On all class of existing AC or BST
pavements, plus shoulder videning
on all class of existing AC or BST
pavements, plus shoulder widening
Eliminate high coot of gravel saintenance
by grading, draining and surfacing
Includes traffic control, drainage, safety
projects, intersections, sidewalks, bikevay,
guardrail, nab -base repair and Bridges
Widen, realign, and surface vith gravel
Replace Bridge
S.R. 3 to 0,2 beyond
Spencer Lake Road
0.20 beyond Spencer
Lk. Rd. to Julian Rd
Julian Rd. south to
Bertelsen Rd.
1.25 1.37 0.12
E.
?.
G.
H.
(7)
rC
UL
NA
CS
T. S
VAR
VAR
VAR
VAR
VAR
09
0.00 0.75 0.75 08
0.75 1.55 0.80 08
1.55 2,55 1.00 08
(9) ENVIRONMENTAL
ASSESSMENT
CURBS AND GUTTERS CODE
SIDEKALIS
TRAFFIC FACILITIES S. SIGNIFICANT
PATES, TRAILS 6 BIKEWAYS I. INSIGNIFICANT
BRIDGES E. EIEMPT
FERRY FACILITIES
COUNTY' MASON
DATE OF SUBMISSION 01
RECOMMENDED PROGRAM
DATE OF ENVIRONMENTAL
ASSESSMENT
N/A
DATE 0? FINAL ADOPTION / 73 e
ORDINANCE/
RESOLUTION N0. / I' '1/
(8) (9) (10) (11) (12) (13) (14) (15) (16) (17)
TYPE OF WORK
D
D
AC
ABCGHI
AB
I
ABD
ABD
ABD
EA
I
VS
IM
R.T
FUNDING SOURCE
FUNDS ($1,000)
PROGRAM
LOCAL 0 i. SOURCE
E 150 234 CAPP
E 1500
6 60
% 100
I 50
78 312 HBRRP
I 150 200 RAP
I 78 172 RAP
I 54 196 RAP
ESTIMATED EIPENDITURES ($1,000)
CONSTRUCTION
PRELIM. RIGHT GRAND
ENGR. OF WAY DAY TOTAL
541.11 541.20 CONTRACT LABOR 541.00
14
5
10
5
370
1500
25 6 359
13 12 325
10 9 231
10 9 231
$384
$1,500
55 $60
90 $100
45 $50
$390
$350
$250
$250
PAGE 2
1992 AINOAL CONSTRUCTION PROGRAM
(7) FUICTIONAL CLASSIFICATION CODS
06 MINOR ARTERIAL, RURAL
07 NAJOR COLLECTOR, RURAL
08 MINOR COLLECTOR, RURAL
09 ACC8S9, RURAL (0R LOCAL
SYSTEM, RURAL)
CRAB FORM 10. 3 (RSV. 11-80
(1) (2) (3)
6 YEAR
ROAD
PROGRAM ROAD
ITEM ITEM LOG
10. 10. N0.
9 21 23910
10 16 15500
11 17 15500
12 21 58380
13 24 52210
14 25 52210
15 26 52210
16 28 60490
17 32 86800
18 30 63010
(8) TYPE OF MORE CODS
15 PRINCIPAL ARTERIAL, DRBAI A. GRADING AND DRAINING
16 EVE ARTERIAL, VIBE B. BASE AND TOP COURSE
17 COLLECTOR ARTERIAL, DABAR C. BITUMINOUS SURFACE
19 LOCAL ESTE, DRAAR TREATMEIT
D. A.C. 0R C.C. PAVEMENT
(4)
ROAD IAMB AID/OR
BRIDGI EEO
Agate Road -4
Lynch Road -1
Lynch Road -2
Dalby Road
Haeon Lake Road -1
Maven Lake Road -2
Mason Lake Road -3
Mason Lake Drive South
(Little Hoquiai)
Davison Avenue
(Roy Boad Rd Ertention)
Knoll Benson Road -2
(5)
LOCATIOI
Bertelsen Rd. to AC
Hudson - Deer Harbor
Deer Harbor/Bay Bast
ley corridor
NcReavy Road to
S.R. 1106
St Andrews to
Ballantrae Drive
Ballantrae Drive to
600'paet Llaerick Rd
600'paat Limerick Rd
to herald Lake Dr.
Mason Lake Road to
Mason Lake Court
Rev road S.R. 1 3
to S.A. 1 300
Railroad Crossing
(6) (7)
LENGTH
M.P. to M.P. TOTAL
Fc
DL
NA
CS
T.S
2.55 3.42 0.87 08
2.95 3.95 1.00 08
3.95 4.95 1.00 08
0.00 1.02 1.02 09
2.25 2.85 0.60 08
2.85 3.75 0.90 08
3.75 5.03 1.28 08
0.00 0.73 0.73 09
0.00 0.21 0.21 08
1.22 1,24 0.02 08
Total Niles 10.28
CURBS AND GUTTERS
SIDBMALSS
TRATIC FACILITIES
PATHS, TRAILS 6 BINEVAYS
BRIDGES
PERRY PACILITIBS
(8) (9) (10)
TYPE OF MORE
ABD
ABD
ABD
ABD
ABDI
ABD
ABC
ABC
ABDF
G
EA
I
VS
IM
R.T
Total Dollars
E
(9) ENVIRONMENTAL
ASSESSMENT
CODE
S. SIGNIFICANT
I. INSIGNIFICANT
E. EIIMPT
COUNTY' MASON
DATE OF SUBMISSION OF
RECOMMENDED PROGRAM
DATE OF ENVIRONMENTAL
ASSESSIKIIT N/A
DATE OF FINAL ADOPTION 1) - 3c, ' q
ORDINANCE/
RESOLUTION N0. /6,
(II) (12) (t3) (14) (15) (16) (17)
FUNDING SOURCE
FUNDS ($1,000)
LOCAL
PROGRAM
OTHER SOURCE
47 203 RAP
250
350
200
10 315 RAP
200
185
200
20 145 MSDOT
7 29 F8D
3749 1806
ESTIMATED EIPENDITURES ($1,000)
CONSTRUCTION
PRELIM. RIGHT GRAND
RIGA. OF MAY DAY TOTAL
541.11 541.20 CONTRACT LABOR 541.00
10 9 231 $250
25 25 200 $250
25 35 290 $350
5 10 185 $200
10 15 360 $385
8 12 180 $200
8 12 165 $185
8 12 180 $200
165 $165
1 35 $36
192 166 5007 190 5555
1992 ANNUAL CONSTRUCTION PROGRAM
(7) JUNCTIONAL CLASSIFICATION
06 MINOR ARTERIAL, RURAL
07 MAJOR COLLECTOR, RURAL
08 MINER COLLECTOR, RURAL
09 ACCESS, RURAL (0R LOCAL
SYSTEM, RURAL)
CRAB FORM 10. 3 (REV. 11-80
(1) (2) (31
ITEM
10,
6 YEAR
ROAD
PROGRAM
ITEM
N0.
ROAD
LOG
10.
19 31 77270
20 34 97500
21 49 62610
22 29 62310
23 33 96140
24 22 23910
25
CODE
15 PRINCIPAL ARTERIAL, URBAN
16 MINOR ARTERIAL, URBAN
11 COLLECTOR ARTERIAL, URBAN
19 LOCAL SYSTEM, URBAN
141
ROAD Mg AND/OR
BRIDGE NUMBER
ALTERNATE PROJECTS
Haven Way
Belfair - Tabuya Road
Anthony Road
Trails Road -1
Grapeviev Loop Road -6
Agate Road -5
(8) TYPE OF WORK CODE
(5)
LOCATION
UNFUNDED
(9) ENVIRONMENTAL
ASSESSMENT
. GRADING AND DRAINING E. CURBS AND GUTTERS CODE
. BASE AND TOP COURSE 1. SIDEWALIS
. BITUMINOUS SURFACE G. TRAFFIC FACILITIES S. SIGNIFICANT
TREATMENT H. PATHS, TRAILS 6 BIKEWAYS I. INSIGNIIICANT
A.C. OR C.C. PAVEMENT I. BRIDGES E. EIEMPT
J. FERRY FACILITIES
(6) (7)
IC
UL
LENGTH N A
CS
M.P. to M.P. TOTAL T.S
(8) (9)
EA
NS
TYPE OF WORE V S
IK
R.T
PAGE 3
COUNTY' MASON
DATE OF SUBMISSION 07
RECOMMENDED PROGRAM
DATE OF ENVIRONMENTAL
ASSESSMENT NIA
DATE 0! FINAL ADOPTION 1 o? - 3o ." Gf
ORDINANCE!
RESOLUTION N0. _ 7
(10) (11) (12) (13) (14) (15) (16) (17)
FUNDING SOURCE
FUNDS ($1,000)
PROGRAM
LOCAL OTHER SOURCE
sp 0.91 to sp 2.40 0.91 2.40 1.49 09 ADD I 440
Haven Lake Road to 7.80 8.18 0.38 01 ABD I 100
Tabuya River Bridge
811 0.00 3,13 3.13 09 ABC I 550
S.R. 4106 to mile 0.00 0.80 0,80 08 ABC I 94 156 RAP
post 0.80
Nelson Rd to S.R. 43 6.93 7.98 1.05 01 ABU I 270
Agate Store -Libby Rd 3.78 4,55 0.11 ABD I 195
8,10-15,23,35-48 6 50-91
Projects listed in the Sit Year Transportation Iaprovesent Program, years 1992 to 1997
1
ESTIMATED EIPENDITURES ($1,000)
CONSTRUCTION
PRELIM. RIGHT GRAND
ENGR. OF WAY DAY TOTAL
541.11 541,20 CONTRACT LABOR 541.00
25 50 365
3
5 92
30 10 450
8 10 232
9 15 246
5
10 180
$440
$100
$550
$250
$270
$195
NOTEi
As per RAC 136-16-030, a list of all aajor equipment purchases conteaplated for year 1992 is attached hereto, rith the B R & R Budget subaitted
separately and by this reference is lade apart of this Annual Construction Prograa.
ADOPTED AND APPROVED 1 42 — clenn— 7 i
BOARD OF COUNTY COMMISSIONERS
MASON C001TY, WASHINGTON
LAURA E. PORTER
Member
MICHAEL D. GIBSON
Member
WILLIAM 0. BUNTER
Chairperson