Loading...
HomeMy WebLinkAbout161-91 - Res. 1992 Annual Road Construction ProgramPAGE! 1992 ANNUAL CONSTRUCTION PROGRAM (7) FUNCTIONAL CLASSIFICATION CODE 06 MINOR ARTERIAL, RURAL 07 MAJOR COLLECTOR, RURAL 08 MINOR COLLECTOR, RURAL 09 ACCESS, RURAL (0R LOCAL SYSTEM, RURAL) CRAB FORM 10. 3 (REV. 11-80 (1) (2) (3) 1 IA 2 3 4 5 6 YEAR ROAD PROGRAM ITEM 10. 162 CARRY OVER 4,566 9 ROAD LOG 10. 02070 15 PRINCIPAL ARTERIAL, 16 KIIOR ARTERIAL, I tAN 17 COLLECTOR ARTERIAL, 19 LOCAL SYSTEM, URBAN (4) ROAD NAME AID/OR BRIDGE COUNTT SIDE AC Pavement 1991 AC Carry Over BST Pavement Sub -base Repair, Minor Construction Upgrading Gravel Roadi CONSTRUCTION PROJECTS BRIDG65 Schafer State Park Bridge ROADS 6 18 23910 Agate Road -1 7 19 23910 Agate Road -2 8 20 23910 Agate Road -3 (8) TYPE 0? WORE CODE . GRADING AND DRAINING . BASE AND TOP COURSE . BITUMINOUS SURFACE TREATMENT . A.C. 0R C.C. PAVEMENT (5) (6) LOCATION LENGTH M.P. to N.P. TOTAL On all class of existing AC or BST pavements, plus shoulder videning on all class of existing AC or BST pavements, plus shoulder widening Eliminate high coot of gravel saintenance by grading, draining and surfacing Includes traffic control, drainage, safety projects, intersections, sidewalks, bikevay, guardrail, nab -base repair and Bridges Widen, realign, and surface vith gravel Replace Bridge S.R. 3 to 0,2 beyond Spencer Lake Road 0.20 beyond Spencer Lk. Rd. to Julian Rd Julian Rd. south to Bertelsen Rd. 1.25 1.37 0.12 E. ?. G. H. (7) rC UL NA CS T. S VAR VAR VAR VAR VAR 09 0.00 0.75 0.75 08 0.75 1.55 0.80 08 1.55 2,55 1.00 08 (9) ENVIRONMENTAL ASSESSMENT CURBS AND GUTTERS CODE SIDEKALIS TRAFFIC FACILITIES S. SIGNIFICANT PATES, TRAILS 6 BIKEWAYS I. INSIGNIFICANT BRIDGES E. EIEMPT FERRY FACILITIES COUNTY' MASON DATE OF SUBMISSION 01 RECOMMENDED PROGRAM DATE OF ENVIRONMENTAL ASSESSMENT N/A DATE 0? FINAL ADOPTION / 73 e ORDINANCE/ RESOLUTION N0. / I' '1/ (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) TYPE OF WORK D D AC ABCGHI AB I ABD ABD ABD EA I VS IM R.T FUNDING SOURCE FUNDS ($1,000) PROGRAM LOCAL 0 i. SOURCE E 150 234 CAPP E 1500 6 60 % 100 I 50 78 312 HBRRP I 150 200 RAP I 78 172 RAP I 54 196 RAP ESTIMATED EIPENDITURES ($1,000) CONSTRUCTION PRELIM. RIGHT GRAND ENGR. OF WAY DAY TOTAL 541.11 541.20 CONTRACT LABOR 541.00 14 5 10 5 370 1500 25 6 359 13 12 325 10 9 231 10 9 231 $384 $1,500 55 $60 90 $100 45 $50 $390 $350 $250 $250 PAGE 2 1992 AINOAL CONSTRUCTION PROGRAM (7) FUICTIONAL CLASSIFICATION CODS 06 MINOR ARTERIAL, RURAL 07 NAJOR COLLECTOR, RURAL 08 MINOR COLLECTOR, RURAL 09 ACC8S9, RURAL (0R LOCAL SYSTEM, RURAL) CRAB FORM 10. 3 (RSV. 11-80 (1) (2) (3) 6 YEAR ROAD PROGRAM ROAD ITEM ITEM LOG 10. 10. N0. 9 21 23910 10 16 15500 11 17 15500 12 21 58380 13 24 52210 14 25 52210 15 26 52210 16 28 60490 17 32 86800 18 30 63010 (8) TYPE OF MORE CODS 15 PRINCIPAL ARTERIAL, DRBAI A. GRADING AND DRAINING 16 EVE ARTERIAL, VIBE B. BASE AND TOP COURSE 17 COLLECTOR ARTERIAL, DABAR C. BITUMINOUS SURFACE 19 LOCAL ESTE, DRAAR TREATMEIT D. A.C. 0R C.C. PAVEMENT (4) ROAD IAMB AID/OR BRIDGI EEO Agate Road -4 Lynch Road -1 Lynch Road -2 Dalby Road Haeon Lake Road -1 Maven Lake Road -2 Mason Lake Road -3 Mason Lake Drive South (Little Hoquiai) Davison Avenue (Roy Boad Rd Ertention) Knoll Benson Road -2 (5) LOCATIOI Bertelsen Rd. to AC Hudson - Deer Harbor Deer Harbor/Bay Bast ley corridor NcReavy Road to S.R. 1106 St Andrews to Ballantrae Drive Ballantrae Drive to 600'paet Llaerick Rd 600'paat Limerick Rd to herald Lake Dr. Mason Lake Road to Mason Lake Court Rev road S.R. 1 3 to S.A. 1 300 Railroad Crossing (6) (7) LENGTH M.P. to M.P. TOTAL Fc DL NA CS T.S 2.55 3.42 0.87 08 2.95 3.95 1.00 08 3.95 4.95 1.00 08 0.00 1.02 1.02 09 2.25 2.85 0.60 08 2.85 3.75 0.90 08 3.75 5.03 1.28 08 0.00 0.73 0.73 09 0.00 0.21 0.21 08 1.22 1,24 0.02 08 Total Niles 10.28 CURBS AND GUTTERS SIDBMALSS TRATIC FACILITIES PATHS, TRAILS 6 BINEVAYS BRIDGES PERRY PACILITIBS (8) (9) (10) TYPE OF MORE ABD ABD ABD ABD ABDI ABD ABC ABC ABDF G EA I VS IM R.T Total Dollars E (9) ENVIRONMENTAL ASSESSMENT CODE S. SIGNIFICANT I. INSIGNIFICANT E. EIIMPT COUNTY' MASON DATE OF SUBMISSION OF RECOMMENDED PROGRAM DATE OF ENVIRONMENTAL ASSESSIKIIT N/A DATE OF FINAL ADOPTION 1) - 3c, ' q ORDINANCE/ RESOLUTION N0. /6, (II) (12) (t3) (14) (15) (16) (17) FUNDING SOURCE FUNDS ($1,000) LOCAL PROGRAM OTHER SOURCE 47 203 RAP 250 350 200 10 315 RAP 200 185 200 20 145 MSDOT 7 29 F8D 3749 1806 ESTIMATED EIPENDITURES ($1,000) CONSTRUCTION PRELIM. RIGHT GRAND RIGA. OF MAY DAY TOTAL 541.11 541.20 CONTRACT LABOR 541.00 10 9 231 $250 25 25 200 $250 25 35 290 $350 5 10 185 $200 10 15 360 $385 8 12 180 $200 8 12 165 $185 8 12 180 $200 165 $165 1 35 $36 192 166 5007 190 5555 1992 ANNUAL CONSTRUCTION PROGRAM (7) JUNCTIONAL CLASSIFICATION 06 MINOR ARTERIAL, RURAL 07 MAJOR COLLECTOR, RURAL 08 MINER COLLECTOR, RURAL 09 ACCESS, RURAL (0R LOCAL SYSTEM, RURAL) CRAB FORM 10. 3 (REV. 11-80 (1) (2) (31 ITEM 10, 6 YEAR ROAD PROGRAM ITEM N0. ROAD LOG 10. 19 31 77270 20 34 97500 21 49 62610 22 29 62310 23 33 96140 24 22 23910 25 CODE 15 PRINCIPAL ARTERIAL, URBAN 16 MINOR ARTERIAL, URBAN 11 COLLECTOR ARTERIAL, URBAN 19 LOCAL SYSTEM, URBAN 141 ROAD Mg AND/OR BRIDGE NUMBER ALTERNATE PROJECTS Haven Way Belfair - Tabuya Road Anthony Road Trails Road -1 Grapeviev Loop Road -6 Agate Road -5 (8) TYPE OF WORK CODE (5) LOCATION UNFUNDED (9) ENVIRONMENTAL ASSESSMENT . GRADING AND DRAINING E. CURBS AND GUTTERS CODE . BASE AND TOP COURSE 1. SIDEWALIS . BITUMINOUS SURFACE G. TRAFFIC FACILITIES S. SIGNIFICANT TREATMENT H. PATHS, TRAILS 6 BIKEWAYS I. INSIGNIIICANT A.C. OR C.C. PAVEMENT I. BRIDGES E. EIEMPT J. FERRY FACILITIES (6) (7) IC UL LENGTH N A CS M.P. to M.P. TOTAL T.S (8) (9) EA NS TYPE OF WORE V S IK R.T PAGE 3 COUNTY' MASON DATE OF SUBMISSION 07 RECOMMENDED PROGRAM DATE OF ENVIRONMENTAL ASSESSMENT NIA DATE 0! FINAL ADOPTION 1 o? - 3o ." Gf ORDINANCE! RESOLUTION N0. _ 7 (10) (11) (12) (13) (14) (15) (16) (17) FUNDING SOURCE FUNDS ($1,000) PROGRAM LOCAL OTHER SOURCE sp 0.91 to sp 2.40 0.91 2.40 1.49 09 ADD I 440 Haven Lake Road to 7.80 8.18 0.38 01 ABD I 100 Tabuya River Bridge 811 0.00 3,13 3.13 09 ABC I 550 S.R. 4106 to mile 0.00 0.80 0,80 08 ABC I 94 156 RAP post 0.80 Nelson Rd to S.R. 43 6.93 7.98 1.05 01 ABU I 270 Agate Store -Libby Rd 3.78 4,55 0.11 ABD I 195 8,10-15,23,35-48 6 50-91 Projects listed in the Sit Year Transportation Iaprovesent Program, years 1992 to 1997 1 ESTIMATED EIPENDITURES ($1,000) CONSTRUCTION PRELIM. RIGHT GRAND ENGR. OF WAY DAY TOTAL 541.11 541,20 CONTRACT LABOR 541.00 25 50 365 3 5 92 30 10 450 8 10 232 9 15 246 5 10 180 $440 $100 $550 $250 $270 $195 NOTEi As per RAC 136-16-030, a list of all aajor equipment purchases conteaplated for year 1992 is attached hereto, rith the B R & R Budget subaitted separately and by this reference is lade apart of this Annual Construction Prograa. ADOPTED AND APPROVED 1 42 — clenn— 7 i BOARD OF COUNTY COMMISSIONERS MASON C001TY, WASHINGTON LAURA E. PORTER Member MICHAEL D. GIBSON Member WILLIAM 0. BUNTER Chairperson