Loading...
HomeMy WebLinkAbout137-92 - Res. Annual Construction Program for 1993 ANNUAL CONSTRUCTION PROGRAM FOR 1993 AGENCY ACTION COUNTY:.......................MASON (7) TYPE OF WORK CODES DAY LABOR COMPUTATION Date of Submittal of A. GRADING&DRAINING F. SIDEWALKS (A)TOTAL CONSTRUCTION PROGRAM - columns (14) + (15) $5,456,000.00 Recommended Program..... 12/15/92 B. BASE&TOP COURSE G. TRAFFIC FACILITIES (B)COMPUTED DAY LABOR LIMIT(see back of page) . . . . . . . . . .$ 818,400.00 Date of Environmental C. BITUM SURF TREATMENT H. PATHS,TRAILS&BIKEWAYS (C)TOTAL DAY LABOR CONSTRUCTION PROGRAM-column(15)$ 493,000-00 Assessement................... 12/15/92 D. A.C./P.C.C.PAVEMENT I. BRIDGES Line(C)must be smaller than line(B) Date of Final Adaption........ 12/22/92 E. CURBS AND GUTTERS J. FERRY FACILITIES Ordinance\Resolution No. 137-92 (2) (3) 5 (6) (7) (8) (9) (10) (11) (12) (13) 1 (14) (15) (16) 6 YEAR FC TYPE EA SOURCE OF FUNDS ESTIMATED EXPENDITURES($1,000) PROGRAM ROAD ROAD/PROJECT NAME AND LOCATION LENGTH N A WORK VS COUNTY OTHER FUNDS CONSTRUCTION ITEM ITEM LOG (Include brief termini description or MP's;Bridge#) CS I FUNDS PRELIM. RIGHT GRAND NO. NO. NO. (Miles) T S (See work RS AMOUNT PROGRAM ENGR. OF WAY TOTAL codes) NS (1,000's) (1,0()0's) SOURCE 541.11 541.20 CONTRACT DAY LABOR 541.00 COUNTY WIDE PROJECTS 1 1&2 AC PAVING VAR D E 161 254 CAPP 15 400 415 2 3 BST PAVING- 2 shots 62670 Anthony Rd.(1992 project) 09 C E 23 23 23 00230 Loganberry Court(Ripple Wood) 09 C E 2 2 2 57530 Webb Hill Road mp 1.20 to 1.70 09 C E 15 15 15 3A BST PAVING-3rd Shot-1992 2 Shot Program 6.90 VAR C E 83 83 83 3 4 SAFETY PROJECTS Guardrail Program 97670 McReavy Road W.of Dalby Road 07 G E 8 8 8 96140 Grapeview Loop Road near Murrey Road 07 G E 3 3 3 44110 Old Mill Hill Road 09 G E 4 4 4 70950 Tahuya River Road 09 G E 4 4 4 Cul-de-sac Improvements 58300 Warren Drive 0.03 09 ABC 1 25 25 25 44110 Old Mill Hill 0.03 109 1 ABC I 1 15 15 15 PAGE/PROGRAM TOTALS= > 343 254 1 15 1 400 182 597 1 CRAB FORM NO. 3 (REV 11/91) page 1 of 5 ANNUAL CONSTRUCTION PROGRAM FOR 1993 AGENCY ACTION COUNTY:.......................MASON (7) TYPE OF WORK CODES DAY LABOR COMPUTATION Date of Submittal of A. GRADING&DRAINING F. SIDEWALKS (A)TOTAL CONSTRUCTION PROGRAM - columns (14) + (15) $5,456,000.00 Recommended Program..... 12/15/92 B. BASE&TOP COURSE G. TRAFFIC FACILITIES (3)COMPUTED DAY LABOR LM11T(see back of page) . . . . . . . . . .$ 818,400.00 Date of Environmental C. BITUM SURF TREATMENT H. PATHS,TRAILS&BIKEWAYS (C)TOTAL DAY LABOR CONSTRUCTION PROGRAM-column(15)$ 493,000.00 Assessement................... 12/15/92 D. A.C./P.C.C.PAVEMENT I. BRIDGES Line(C)must be smaller than line(B) Date of Final Adaption........ 12/22/92 E. CURBS AND GUTTERS J. FERRY FACILITIES Ordinance\Resolution No. .. 137-92 (1) (2) (3) 5 (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) 6 YEAR FC TYPE EA SOURCE OF FUNDS ESTIMATED EXPENDITURES($1,000) PROGRAM ROAD ROAD/PROJECT NAME AND LOCATION LENGTH N A WORK VS COUNTY OTHER FUNDS CONSTRUCTION ]TEM ITEM LOG (Include brief termini description or MP's;Bridge#) CS I FUNDS PRELIM. RIGHT GRAND NO. NO. NO. (Miles) T S (See work RS AMOUNT PROGRAM ENGR. OF WAY TOTAL codes) NS (1,000's) (1,000's) SOURCE 541.11 541.20 CONTRACT DAY LABOR 541.00 3cnt 4 SAFETY PROJECTS(cont.) Intersection Improvements 23500/20900 Agate Loop Road/Crestview Drive 8 2 2 4 8 4 5 — MINOR CONSTRUCTION VAR AC E Traffic Day Labor 25 25 25 Brockdale Walking Path 30 3 27 30 5 6 — BRIDGE&LARGE CULVERT CONSTRUCTION Drainage Day Labor VAR A 1 25 25 25 6 7 — UPGRADING GRAVEL ROADS VAR AB 1 76370 Tee Lake Road,including BST 1.10 ABC 1 120 5 115 120 24360 Bertlesen Road 0.95 ABC 1 12 12 12 24480 Julian Road 0.26 ABC 1 3 3 3 24600 Scarlet Road 0.58 ABC 1 8 8 8 BRIDGES 7 (9) 02070-1.30 Schafer State Park Bridge(carry over-under contract) 1.25 09 1 1 Ill 442 HBRRP 493 60 553 8 8 02300-0.04 Plug Mill Bridge mp 0.00 to 0.07 0.07 1 1 23 92 HBRRP 11 4 90 10 115 9 9 90100-23.35 Eddy Evers Bridge mp 23.25 to 23.50 0.25 1 1 162 1038 STP 120 20 1000 60 1200 ROADS Carry Over--Under Contract 10 (18-21) 23910 Agate Road mp 0.00 to 3.42 3.42 08 ABD 1 395 395 395 11 16 52210 Mason Lake Road mp 2.25 to 5.24 2.99 ,08 ABDI 1 487 315 RAP 802 802 PAGE/PROGRAM TOTALS= > 1409 1887 164 . 26 2780 326 3296 CRAB FORM NO. 3 (REV 11/91) page 2 of 5 ANNUAL CONSTRUCTION PROGRAM FOR 1993 AGENCY ACTION COUNTY:.......................MASON (7) TYPE OF WORK CODES DAY LABOR COMPUTATION Date of Submittal of A. GRADING&DRAINING F. SIDEWALKS (A)TOTAL CONSTRUCTION PROGRAM - columns (14) + (15) $5,456,000.00 Recommended Program..... 12/15/92 B. BASE&TOP COURSE G. TRAFFIC FACILITIES (B)COMPUTED DAY LABOR LIMIT(see back of page) . . . . . . . . . .$ 818,400.00 Date of Environmental. C. BITUM SURF TREATMENT H. PATHS,TRAILS&BIKEWAYS (C)TOTAL DAY LABOR CONSTRUCTION PROGRAM-column(15)$ 493,000.00 Assessement................... 12/15/92 D. A.C./P.C.C.PAVEMENT I. BRIDGES Line(C)must be smaller than line(B) Date of Final Adaption........ 12/22/92 E. CURBS AND GUTTERS J. FERRY FACILITIES Ordinance\Resolution No. 137-92 (1) (2) (3) 5 (6) (7) (8) (9) (10) (11) (12) (13) 1 (14) (15) (16) 6 YEAR FC TYPE EA SOURCE OF FUNDS ESTIMATED EXPENDITURES($1,000) PROGRAM ROAD ROAD/PROJECT NAME AND LOCATION LENGTH N A WORK VS COUNTY OTHER FUNDS CONSTRUCTION ITEM ITEM LOG (Include brief termini description or MP's;Bridge#) CS I FUNDS PRELIM. RIGHT GRAND NO. NO. NO. (Miles) TS (See work RS AMOUNT PROGRAM ENGR. OF WAY TOTAL codes) NS (1,000's) (1,000's) SOURCE 541.11 541.20 CONTRACT DAY LABOR 541.00 Carry Over---Under Contract(cont.) 12 (27) 58380 Dalby Road mp 0.00 to 1.02 1.02 09 ABD 1 373 373 373 13 18 97500 Belfair-Tahuya Road mp 7.80 to 8.18 0.38 07 ABD 1 150 150 ISO 14 (30) 63010 Mason Benson Road-Railroad Crossing mp 1.22 to 1.24 0.02 08 G E 8 32 FED-HAZ 40 40 Proposed New Construction 15 17 97670 MeReavy Road-SR 106 to 4th St.mp 0.00 to 0.23 0.23 7 ABD 1 100 5 10 85 100 16 24 15500 Lynch Road-2,mp 2.95 to 4.95(overland) 2.00 08 ABD 1 900 25 35 840 900 17 23 23910 Agate Road-5(Store to Libby Road)mp 3.78 to 4.55 0.77 08 ABD 1 53 172 RAP 5 5 215 225 is 26 91720 John's Prairie Road-Railroad Crossing mp 2.72 to 2.74 0.02 07 G E 8 32 FED-HAZ 40 40 19 27 51800 McEwen Prairie Road-Railroad Crossing mp 0.81 to 0.83 0.02 08 G E 8 32 FED-HAZ 40 40 Proposed P/E&R/W 20 4 77270 Haven Way mp 0.00 to 0.91 0.91 09 ABD 1 42 20 22 42 21 19 86070 Sand Hill Road-I mp 0.33 to 2.66 2.33 09 ABD 1 64 27 37 64 22 20 79800 Bear Creek-Dewatto Road mp 6.77 to 7.65 0.88 08 ABC 1 33 18 15 33 23 21 28850 Pickering Road-IA mp 0.37 to 1.23 0.86 07 ABD 1 28 4 24 28 24 22 28850 Pickering Road-2 mp 1.64 to 2.45 0.81 07 ABD 1 29 5 24 29 25 25 62670 Anthony Road mp 0.00 to 2.41 2.41 09 ABC 1 10 10 10 26 34 15500 Lynch Road-3 mp 4.95 to 6.85 1.90 08 ABD 1 38 5 33 38 27 50 15500 Lynch Road-4 mp 6.85 to 8.85 2.00 08 ABD 1 39 5 34 39 28 30 10000 Cloquallum Road-3 mp 15.60 to 17.44 1.84 08 ABD 1 60 15 45 60 29 29 62310 Trails Road-4 mp 2.55 to 3.45 0.90 08 ABC 1 35 7 28 35 PAGE/PROGRAM TOTALS= > 1977 268 151 3121 1783 1 2246 CRAB FORM NO. 3 (REV 11/91) page 3 of 5 ANNUAL CONSTRUCTION PROGRAM FOR 1993 AGENCY ACTION COUNTY:.......................MASON (7) TYPE OF WORK CODES DAY LABOR COMPUTATION Date of Submittal of A. GRADING&DRAINING F. SIDEWALKS (A)TOTAL CONSTRUCTION PROGRAM - columns (14) + (15) $5,456,000.00 Recommended Program..... 12/15/92 B. BASE&TOP COURSE G. TRAFFIC FACILITIES (B)COMPUTED DAY LABOR LIMIT(see back of page) . . . . . . . . . .$ 818,400.00 Date of Environmental C. BITUM SURF TREATMENT H. PATHS,TRAILS&BIKEWAYS (C)TOTAL DAY LABOR CONSTRUCTION PROGRAM-column(15)$ 493,000.00 Assessement................... 12/15/92 D. A.C./P.C.C.PAVEMENT I. BRIDGES Line(C)must be smaller than line(B) Date of Final Adaption........ 12/22/92 E. CURBS AND GUTTERS J. FERRY FACILITIES Ordinance\Resolution No. 137-92 (1) (2) (3) 5 (6) (7) (8) (9) (10) 1) (12) (13) 1 (14) (15) (16) 6 YEAR FC TYPE EA SOURCE OF FUNDS ESTIMATED EXPENDITURES($1,000) PROGRAM ROAD ROAD/PROJECT NAME AND LOCATION LENGTH N A WORK VS COUNTY OTHER FUNDS CONSTRUCTION ITEM ITEM LOG (Include brief termini description or MP's;Bridge#) CS I FUNDS PRELIM. RIGHT GRAND NO. NO. NO. (Miles) TS (See work RS AMOUNT PROGRAM ENGR. OF WAY TOTAL codes) NS (1,000's) (1,000's) SOURCE 541.11 541.20 CONTRACT DAY LABOR 541.00 Proposed P/E&R/W(cont.) 30 39 62310 Trails Road-3 mp 1.59 to 2.55 0.96 08 ABC 1 27 7 20 27 31 33 62310 Trails Road-2 mp 0.80 to 1.59 0.79 08 ABC 1 22 7 15 22 32 42 62310 Trails Road-1 mp 0.00 to 0.08 0.80 08 ABC 1 23 10 13 23 33 31 96140 Grapeview Loop Road-6 mp 6.93 to 7.98 1.05 07 ABD 1 30 10 20 30 34 52 96140 Grapeview Loop Road-3 mp 3.50 to 4.43 0.93 07 ABD 1 30 10 20 30 35 85 XXXXX New Road SR 3 to Grapeview Loop Road 1.80 00 ABD 1 30 30 30 36 All other projects listed in the Six Year Transportation Improvement Program,years 1993 to 1998 1 1 PAGE/PROGRAM TOTALS= > 162 74 88 162 , CRAB FORM NO. 3 (REV 11/91) page 4 of 5 ANNUAL CONSTRUCTION PROGRAM FOR 1993 AGENCY ACTION COUNTY:.......................MASON (7) TYPE OF WORK CODES DAY LABOR COMPUTATION Date of Submittal of A. GRADING&DRAINING F. SIDEWALKS (A)TOTAL CONSTRUCTION PROGRAM - columns (14) + (15) $5,456,000.00 Recommended Program..... 12/15/92 B. BASE&TOP COURSE G. TRAFFIC FACILITIES (B)COMPUTED DAY LABOR LIMIT(see back of page) . . . . . . . . . .$ 818,400.00 Date of Environmental C. BITUM SURF TREATMENT H. PATHS,TRAILS&BIKEWAYS (C)TOTAL DAY LABOR CONSTRUCTION PROGRAM-column(15)$ 493,000.00 Assessement................... 12/15/92 D. A.C./P.C.C.PAVEMENT I. BRIDGES Line(C)must be smaller than line(B) Date of Final Adaption........ 12/22/92 E. CURBS AND GUTTERS J. FERRY FACILITIES Ordinance\Resolution No. 137-92 (2) (3) 5 (6) (7) (8) (9) (10) (11) (12) (13) 1 (14) (15) (16) 6 YEAR FC TYPE EA SOURCE OF FUNDS ESTIMATED EXPENDITURES($1,000) PROGRAM ROAD ROAD/PROJECT NAME AND LOCATION LENGTH N A WORK VS COUNTY OTHER FUNDS CONSTRUCTION ]TEM ITEM LOG (Include brief termini description or MP's;Bridge#) CS I FUNDS PRELIM. RIGHT GRAND NO. NO. (Miles) TS (See work RS AMOUNT PROGRAM ENGR. OF WAY TOTAL I I codes) INS I (1,000's) (1,000's) SOURCE 541.11 541.20 CONTRACT DAY LABOR 541.00 PROGRAM TOTALS > 3892 1 2409 404 1 426 1 4963 5081 6301 Note: As per WAC 136-16-030,a list of all major equipment purchases contemplated for the year 1993 is attached hereto,with the E R&R Budget submitted separately and by this reference made a part of this Annal Construction Program. ADOPTED AND APPROVED BOARD OF COUNTY COMMISSIONERS MASON COUNTY, WASHINGTON LAURA E. PORTER WILLIAM 0. HUNTER MARV L. FAUGtIENDER Chairperson Commissioner Commissioner CRAB FORM NO. 3 (REV 11191) page 5 of 5