Loading...
HomeMy WebLinkAbout90-92 - Res. Six Year Transportation Program 1993 to 1998 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 93 TO 98 MASON COUNTY HEARING DATE : 09/08/92 ADOPTION DATE: 09/08/92 COUNTY NO: 23 RESOLUTION NO: 90-92 ------------------------------------------------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------------------------------------------------ P IF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL R IU I ICIFI I OBLIGATION I IN (PROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN 0 ICCI DESCRIPTION OF WORK IRINI I T I L T I F I R ITLI IRIDI 1ST 12ND 13RD 14TH I 0 I 0 TRAP I E I 1ST I4TH I I Al IYIIIYEAR (YEAR (YEAR 15TH I T I C ICAPP I D I THRU ITHRU T I SI I INI I I 16TH I A I A IUATA I R I 3RD I6TH Y I SI I IGI I I (YEAR I L I L ITIA I L I YEAR (YEAR 11 ICOUNTY WIDE PAVEMENT ON AC I IFI 2651 2651 2651 7951 15901 15901 I I PE I I I I I MJR CLASS of WK: 5 IR/W I I (On all class of existing asphalt pavements I I WORK CODES: BD ICON I I(ID-1) I I TOTAL LENGTH: F.A. PROJ NO. I -I - I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 2I (COUNTY WIDE AC PAVEMENT ON BST I IPI 1501 1501 1501 4501 9001 9001 I I PE I I I I I MJR CLASS of WK: 5 IR/W I I IAC pavement plus shoulder widening on all classes of I I WORK CODES: ICON I I (existing BST surfaced roads with high volumes I I TOTAL LENGTH: F.A. PROJ NO. I _I I(ID-2) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 3I (COUNTY WIDE BST I IPI 1701 1701 1701 5101 10201 10201 I I PE I I I I I MJR CLASS of WK: 4 IR/W I I (Eliminate high cost gravel maintenance by grading, I I WORK CODES: ABC ICON I I I draining and surfacing I I TOTAL LENGTH: F.A. PROJ NO. I I I(ID-3) I I UTILITY CODES: - - (TOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 4I (COUNTY WIDE SAFETY PROJECTS I IPI 2201 2201 2201 6601 13201 13201 I I PE I I I I I MJR CLASS of WK: IR/W I I (Includes traffic control, drainage, walks, I I WORK CODES: ABHKO ICON I I (bikeways and guardrails I I TOTAL LENGTH: F.A. PROJ NO. I ®I I (Projects off roadway surfaces (ID-4) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 5I (COUNTY WIDE MINOR CONSTRUCTION I IPI 951 951 951 2851 5701 5701 I I PE I I I I MJR CLASS of WK: IR/W I I (Reconstruction of sub-base and resurfacing I I WORK CODES: ABC ICON I I (Intersections - sight distance improvements I I TOTAL LENGTH: F.A. PROJ NO. I _I _ I (Projects primarily within traveled way (ID-5) I . I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 6I (COUNTY WIDE BRIDGE & LARGE CULVERT CONSTRUCTION I IPI 701 701 701 2101 4201 4201 I I PE I MJR CLASS of WK: 4 IR/W I (ID-6) I I WORK CODES: L ICON I TOTAL LENGTH: F.A. PROJ NO. I _I _ UTILITY CODES: - - ITOT OI 0 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 93 TO 98 Page 2 MASON COUNTY P IF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL R IU I ICIFI I OBLIGATION I IN IPROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN 0 ICCI DESCRIPTION OF WORK IRINI I T I L T I F I R ITLI IRIDI 1ST 12ND 13RD 14TH I 0 I 0 (RAP I E I 1ST I4TH I I Al IYIIIYEAR IYEAR IYEAR 15TH I T I C ICAPP I D I THRU ITHRU T I SI I INI I I 16TH I A I A IUATA I R I 3RD I6TH Y I SI I IGI I I IYEAR I L I L ITIA I L I YEAR IYEAR 71 ICOUNTY WIDE UPGRADING GRAVEL ROADS I IPI 1601 1601 1601 4801 9601 9601 I I PE I I I I I MJR CLASS of WK: 4 IR/W I I IFor alignment and drainage (ID-7) I I WORK CODES: ABC ICON I TOTAL LENGTH: F.A. PROD NO. I -I - I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 8I09I02310-0.04 PLUG MILL BRIDGE. I IFI 1001 I I I 1001 201 I 801 PE I I 10.02 TO 0.07 I I MJR CLASS of WK: 4 IR/W I I IReplacement of Bridge plus new approaches I I WORK CODES: L ICON I I I(ID-17) I I TOTAL LENGTH: .05 F.A. PROJ NO. I -I _ I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 9I08I90100-23.35 EDDY EVERS BRIDGE I IFI 501 7801 I I 8301 2101 I 6201 PE I I 123.25 TO 23.50 I I MJR CLASS of WK: 4 IR/W I I IReplacement of Bridge plus new approaches I I WORK CODES: L ICON I I ((Posted 24 Tons - one lane, truck and busses) I I TOTAL LENGTH: .25 F.A. PROJ NO. I -I - I I(ID-9) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 10I08I10000-16.60 CLOQUALLUM CREEK BRIDGE I IN I 1501 I I 1501 1501 I I PE I I 116.58 TO 16.62 I I MJR CLASS of WK: 4 IR/W I I IReplacement of Bridge plus new approaches I I WORK CODES: L ICON I I(ID-13) I I TOTAL LENGTH: .04 F.A. PROD NO. I ®I UTILITY CODES: - - ITOT 01 0 ------------------------------------------------------------------------------------------------------------------------------------ 11I08I10000-5.85 ROCK CREEK NO.1 BRIDGE I IN I I 701 I 701 701 I I PE I I 15.83 TO 5.87 I I MJR CLASS of WK: 4 IR/W I I IReplacement of Bridge plus new approaches I I WORK CODES: L ICON I I I(ID-10) I I TOTAL LENGTH: .04 F.A. PROD NO. I -I I I I I UTILITY CODES: - - ITOT OI 0 -----------------------------------------------------------------------------------------------------------------------------------., 12I08I10000-14.82 HERMAN'S OLD SCHOOLHOUSE BRIDGE I IPI I I 1101 I 1101 1101 I I PE I I I I I MJR CLASS of WK: 4 IR/W I I IReplacement of Bridge plus new approaches I I WORK CODES: L ICON I I I(ID-11) I I TOTAL LENGTH: .04 F.A. PROD NO. I -I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 13I08I10000-15.60 HERMAN'S CLOQUALLUM CREEK BRIDGE I IN I I 1351 I 1351 1351 I I PE I I 115.58 TO 15.62 I I MJR CLASS of WK: 4 IR/W I I IReplacement of Bridge plus new approaches I I WORK CODES: L ICON I I ((ID-12) I I TOTAL LENGTH: .04 F.A. PROD NO. I -I I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 93 TO 98 Page 3 MASON COUNTY P IF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL R IU I IXIFI I OBLIGATION I IN (PROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN 0 ICCI DESCRIPTION OF WORK IRIDI I T I L I I F I R ITLI IRIDI 1ST 12ND 13RD 14TH I 0 I 0 IRAP I E I 1ST I4TH I I Al IYIIIYEAR IYEAR IYEAR 15TH I T I C ICAPP I D I THRU ITHRU T I SI I INI I I 16TH I A I A IUATA I R I 3RD I6TH Y I SI I IGI I I IYEAR I L I L ITIA I L I YEAR IYEAR 14I08I10290-0.35 HLIBOKI BRIDGE I IUI I I 1251 I 1251 1251 I I PE I I 10.30 TO 0.40 (BULB FARM ROAD) I I MJR CLASS of WK: 4 IR/W I I IReplacement of Bridge plus new approaches I I WORK CODES: L ICON I I I(ID-14) I I TOTAL LENGTH: .10 F.A. PROD NO. I -I I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 15I07I96140-2.45 MCLANE COVE BRIDGE I IN I I I 4801 4801 4801 I I PE I I 12.35 TO 2.55 I I MJR CLASS of WK: 4 IR/W I I IReplacement of bridge plus new approaches (Realign) I I WORK CODES: L ICON I I ((ID-15) I I TOTAL LENGTH: .20 F.A. PROD NO. I ®I I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 16IO8I52210 MASON LAKE ROAD IXIFI 9761 I I I 9761 6611 3151 I PE I I I2.25 TO 5.24 I . I MJR CLASS of WK: 4 IR/W I I ISt. Andrews Drive to 0.20 mile beyond Emerald Lake Dr. I I WORK CODES: ABDL ICON I I IRealign and Regrade includes Cranberry Cr. Culvert I I TOTAL LENGTH: 2.99 F.A. PROD NO. I ei I I(ID-54) I I UTILITY CODES: CPTW - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 17I07I97670 MCREAVY ROAD I IFI 1001 I I I 1001 1001 I I PE I I 10.00 TO 0.23 I I MJR CLASS of WK: 4 IR/W I I IS.R. #106 to 4th Street I I WORK CODES: ABD ICON I I IRealign and Regrade, including sidewalks I I TOTAL LENGTH: .23 F.A. PROJ NO. I -I - I I(ID-44 RAP-45) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 18I07I97500 BELFAIR - TAHUYA ROAD I IFI 1051 I I I 1051 1051 I I PE I I IMP 7.80 TO 8.18 I I MJR CLASS of WK: 4 IR/W I I IHaven Lake Road to Tahuya River Bridge I I WORK CODES: ABD ICON I I IRealign and Regrade I I TOTAL LENGTH: .38 F.A. PROJ NO. I -I - I I(ID-43 RAP-67) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 19I09I86070 SAND HILL ROAD - 1 I IFI 4601 I I I 4601 4601 I I PE I I 10.33 TO 2.66 I I MJR CLASS of WK: 4 IR/W I I IFrom mile post 0.33 to Transfer Station . I I WORK CODES: ABD ICON I I IRealign and Regrade I I TOTAL LENGTH: 2.33 F.A. PROJ NO. I -I - I(ID-88) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 20I08I79800 BEAR CREEK - DEWATTO ROAD - 1 I IPI 3031 I I I 3031 611 2421 I PE I I 16.77 TO 7.65 I I MJR CLASS of WK: 4 IR/W I I 10.07 East of Panther Lake Road to 0.16 East of . I I WORK CODES: ABC ICON I I IGold Creek Road I I TOTAL LENGTH: .88 F.A. PROD NO. I -I - I IRealign and Regrade (ID-39 RAP-61) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 93 TO 98 Page L, MASON COUNTY ------------------------------------------------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------------------------------------------------ P IF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL R IU I ICIFI I OBLIGATION I IN IPROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN 0 ICCI DESCRIPTION OF WORK IRINI I T I L I I F I R ITLI IRINI 1ST 12ND 13RD 14TH I 01 0 IRAP I E I 1ST I4TH I I Al IYIIIYEAR IYEAR IYEAR 15TH I T I C ICAPP I D I THRU ITHRU T I SI I INI I I 16TH I A I A IUATA I R I 3RD I6TH Y I SI I IGI I I IYEAR I L I L ITIA I L I YEAR IYEAR 21I07I28850 PICKERING ROAD - 1A I IPI 200I I I I 200I 50I 150I I PE I I 10.37 TO 1.23 I I MJR CLASS of WK: 4 IR/W I I I1990 INTERSECTION PROJECT TO 1984 PROJECT . I I WORK CODES: ABD ICON I I IReaLign and Regrade I I TOTAL LENGTH: .86 F.A. PROD No. I ®I I I(ID-53 RAP-71) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 22I07I28850 PICKERING ROAD - 2 I IFI 250I I I I 250I 881 1621 I PE I I 11.64 TO 2.45 I I MJR CLASS of WK: 4 IR/W I I (East end of 1984 Project to AC I I WORK CODES: ABD ICON I I IReaLign and Regrade I I TOTAL LENGTH: .81 F.A. PROJ NO. I -I - I I(ID-29 RAP-71) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 23I08I23910 AGATE ROAD - 5 I IFI 2251 I I I 2251 2251 I I PE I I 13.78 TO 4.55 I I MJR CLASS of WK: 4 IR/W I I (Agate Store East to Libby Road I I WORK CODES: ABD ICON I I IReaLign and Regrade I I TOTAL LENGTH: .77 F.A. PROD NO. I _I _ I(ID-46 RAP-69) I I UTILITY CODES: - - ITOT 01 0 ------------------------------------------------------------------------------------------------------------------------------------ 24IO8I15500 LYNCH ROAD - 2 I IFI 900I I ( I 900I 900I I I PE I I 12.95 To 4.95 I I MJR CLASS of WK: 4 IR/W I I (From the Hudson Road to 0.30 miles North of Bay East I I WORK CODES: ABC ICON I I (New corridor overland I I TOTAL LENGTH: 2.00 F.A. PROJ NO. I -I - I I(ID-23 RAP-67) I . I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 25I09I62670 ANTHONY ROAD I IFI 10I I I I 10I 10I I I PE I I I0.00 TO 2.41 I I MJR CLASS of WK: 4 IR/W I I ISR #3 north to the 1993 Project I I WORK CODES: U ICON I I IReaLign and Regrade (PE only) I I TOTAL LENGTH: 2.41 F.A. PROJ NO. I -I -. I I(ID-56) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 26I09I51720 JOHN'S PRAIRIE ROAD - 3 I IFI 40I I I I 40I 81 I 321 PE I I 12.72 TO 2.74 I I MJR CLASS of WK: 6 IR/W I I IRaiLroad Crossing I I WORK CODES: I ICON I I I(ID-81) I I TOTAL LENGTH: .02 F.A. PROJ NO. I -I - I I I I UTILITY CODES: RRS - - ITOT 01 0 ------------------------------------------------------------------------------------------------------------------------------------ 27I08I51800 MCEWAN PRAIRIE ROAD I IFI 40I I I I 40I 81 I 321 PE I I 10.81 TO 0.83 I I MJR CLASS of WK: 6 IR/W I I IRaiLroad Crossing I I WORK CODES: I ICON I I(ID-79) I I TOTAL LENGTH: .02 F.A. PROD NO. I -I - I I I I UTILITY CODES: RRS - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 93 TO 98 Page 5 MASON COUNTY ------------------------------------------------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------------------------------------------------ P IF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL R IU I ICIFI I OBLIGATION I IN (PROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN 0 ICCI DESCRIPTION OF WORK IRINI I T I L I I F I R ITLI IRIDI 1ST 12ND 13RD 14TH I 0 I 0 IRAP I E I 1ST I4TH I I Al IYIIIYEAR IYEAR IYEAR 15TH I T I C ICAPP I D I THRU ITHRU T I SI I INI I I 16TH I A I A IUATA I R I 3RD I6TH Y I SI I IGI I I IYEAR I L I L ITIA I L I YEAR IYEAR ------------------------------------------------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------------------------------------------------ 28I09I54650 ST. ANDREWS DRIVE I IFI 401 I I I 401 81 I 321 PE I I 12.01 TO 2.03 I I MJR CLASS of WK: 6 IR/W I I IRaiLroad Crossing I I WORK CODES: I ICON I I I(ID-82) ' I TOTAL LENGTH: .02 F.A. PROJ NO. I -I - I I I ' UTILITY CODES: RRS - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 29I08I62310 TRAILS ROAD - 4 I IPI 2851 I I I 2851 2851 I I PE I I 12.55 To 3.45 I I MJR CLASS of WK: 4 IR/W I I IMiLe Post 2.55 to 0.10 Mile So. Mason Lake Drive West. I I WORK CODES: ABC ICON I I (Realign and Regrade I I TOTAL LENGTH: .90 F.A. PROJ NO. I ®I I(ID-36 RAP-53) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 30IO8I10000 CLOQUALLUM ROAD - 3 I IN I 7361 I I 7361 3281 4081 I PE I I 115.60 TO 17.44 I ' MJR CLASS of WK: 4 IR/W I I (Herman's CLoquaLLum Creek Bridge to mile post 17.44 I I WORK CODES: ABD ICON I I IRealign and Regrade I I TOTAL LENGTH: 1.84 F.A. PROJ NO. I -I - I I(ID-20 RAP-76) I I UTILITY CODES: PT - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 31I07I96140 GRAPEVIEW LOOP ROAD - 6 I IUI I 3051 I I 3051 3051 I I PE I I 16.93 TO 7.98 I I MJR CLASS of WK: 4 IR/W I I INeLson Road to S.R. #3 I I WORK CODES: ABD ICON I I IRealign and Regrade I I TOTAL LENGTH: 1.05 F.A. PROJ NO. I -I - I I(ID-50 RAP-63) I I UTILITY CODES: - - ITOT 01 0 ------------------------------------------------------------------------------------------------------------------------------------ 32I09I70950 TAHUYA RIVER ROAD I IUI I 6301 I I 6301 6301 I I PE I I 11.61 To 4.02 I ( MJR CLASS of WK: 45 IR/W I I Ilntersection with Belfair-Tahuya Road in Sec. 22 I I WORK CODES: ABC ICON I I Inortherly 2.41 miles I I TOTAL LENGTH: 2.41 F.A. PROD NO. I -I _ I I(ID-77 Yr-92) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 33IO8I62310 TRAILS ROAD - 2 I IUI I 2301 I I 2301 2301 I I PE I I 10.80 TO 1.59 I I MJR CLASS of WK: 4 IR/W I I IMiLe post 0.80 to Traits End Drive . I I WORK CODES: ABC ICON I I IRealign and Regrade ' I TOTAL LENGTH: .79 F.A. PROJ NO. I ®I _- I I(ID-34 RAP-49) I I UTILITY CODES: - - ITOT 01 0 ------------------------------------------------------------------------------------------------------------------------------------ 34I08I15500 LYNCH ROAD - 3 I IPI I 4251 I I 4251 4251 I I PE I I 14.95 TO 6.85 I I MJR CLASS of WK: 4 IR/W I I 10.30 North of Bay East to Totten Shores I I WORK CODES: ABD ICON I I IRealign and Regrade I I TOTAL LENGTH: 1.90 F.A. PROD NO. I -I - I I(ID-45 RAP-49) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 93 TO 98 Page 6 MASON COUNTY ------------------------------------------------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------------------------------------------------ P IF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- ( FEDERAL R IU I ICIFI ( OBLIGATION I IN IPROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN 0 ICCI DESCRIPTION OF WORK IRINI I T I L I I F I R ITLI IRIDI 1ST 12ND 13RD 14TH I 0 I 0 IRAP I E I 1ST I4TH I I Al IYIIIYEAR IYEAR IYEAR 15TH I T I C ICAPP I D I THRU ITHRU T I SI I INI I I 16TH I A I A (UATA I R I 3RD I6TH Y I SI I IGI I I IYEAR I L I L ITIA I L I YEAR IYEAR ------------------------------------------------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------------------------------------------------ 35I09I86070 SAND HILL ROAD - 2 I IN I 3451 I I 3451 3451 I I PE I I 12.66 TO 3.94 I I MJR CLASS of WK: 4 IR/W I I ITransfer Station to Delmore Road I I WORK CODES: ABC ICON I I (Realign and Regrade I I TOTAL LENGTH: 1.28 F.A. PROD NO. 1 -1 - I ((ID-89) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 36I17I13200 WALKER PARK ROAD I IPI I 3851 I I 3851 1201 2651 I PE I I 10.36 TO 1.06 I I MJR CLASS of WK: 4 IR/W I I IRebuild Road with Curbs, Gutters and Sidewalks I I WORK CODES: BDFG ICON I I I(ID-16) I I TOTAL LENGTH: .70 F.A. PROD NO. I -I I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 37I08I10000 CLOQUALLUM ROAD - 1 I IUI I 4001 I I 4001 4001 I I PE I I 111.75 TO 12.47 I I MJR CLASS of WK: 4 IR/W I I (Rock Corner (1 mile west of Bulb Farm Road) I I WORK CODES: ABD ICON I I (Realign (Relax Curve) I I TOTAL LENGTH: .72 F.A. PROJ NO. I -1 - I ((ID-51 RAP-41) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 38I09I02750 STAR LAKE ROAD I IUI I 1151 I I 1151 1151 I I PE I I 10.00 TO 1.10 I I MJR CLASS of WK: 3 IR/W I I ICLoquaLLum Road north 1.10 miles to Country Club I I WORK CODES: ABC ICON I I IRegrade, drain and surface I I TOTAL LENGTH: 1.10 F.A. PROJ NO. I -I - I I (71) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 39I08I62310 TRAILS ROAD -3 I IN I 2851 I I 2851 851 2001 I PE I I 11.59 TO 2.55 I I MJR CLASS of WK: 4 IR/W I I ITraiLs End Drive south to Mile Post 2.55 I I WORK CODES: ABC ICON I I (Realign and Regrade I I TOTAL LENGTH: .96 F.A. PROJ NO. I -1 - I I(ID-35 RAP-59) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 40I09I04670 LITTLE EGYPT ROAD I IUI I 501 501 1001 2001 2001 I I PE I I 10.00 TO 2.00 I I MJR CLASS of WK: 3 IR/W I I IShelton-Matlock Road south to 2.00 Mile Post I I WORK CODES: ABC ICON I I IRegrade, drain and surface I I TOTAL LENGTH: 2.00 F.A. PROJ NO. I -I - I I (70) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 41I08I79800 BEAR CREEK - DEWATTO ROAD - 2 I IN I I 2851 I 2851 2851 I I PE I I 17.65 TO 8.60 I I MJR CLASS of WK: 4 IR/W I I 10.16 E. GoLd Creek Road to 0.37 W. Tiger Mission Road, I I WORK CODES: ABC ICON I I IReaLign and Regrade I I TOTAL LENGTH: .95 F.A. PROD NO. I -1 - I I(ID-40 RAP-57*) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 93 TO 98 Page 7 MASON COUNTY P IF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL R IU I ICIFI I OBLIGATION I IN IPROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN 0 ICCI DESCRIPTION OF WORK IRINI I T I L T I F I R ITLI IRIDI 1ST 12ND 13RD 14TH I 0 I 0 IRAP I E I 1ST I4TH I I Al IYIIIYEAR IYEAR IYEAR 15TH I T I C ICAPP I D I THRU ITHRU T I SI I INI I I 16TH I A I A IUATA I R I 3RD I6TH Y I SI I IGI I I IYEAR I L I L ITIA I L I YEAR IYEAR 42108162310 TRAILS ROAD - 1 I IUI I I 3851 I 3851 771 3081 I PE I I 10.00 TO 0.80 I I MJR CLASS of WK: 4 IR/W I I IS.R. #106 to mile post 0.80 I I WORK CODES: ABC ICON I I IRealign and Regrade I I TOTAL LENGTH: .80 F.A. PROD NO. I -I I I(ID-33 RAP-81 YR-85) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 43I07I97500 BELFAIR-TAHUYA ROAD I IN I I 9351 I 9351 6351 I 3001 PE I I 10.00 TO 1.85 I I MJR CLASS of WK: 15 IR/W I I (North Shore Road northerly 2.00 miles . I I WORK CODES: ABD ICON I I (Horizontal and Vertical realignment I I TOTAL LENGTH: 2.00 F.A. PROJ NO. I -I - I I(ID-19 RAP-51) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 44I07I96140 GRAPEVIEW LOOP ROAD - 5 I IN I I 2301 I 2301 1751 551 I PE I I 16.10 TO 6.93 I ( MJR CLASS of WK: 4 IR/W I I ICronquist Road to Nelson Road . I I WORK CODES: ABD ICON I I IRealign and Regrade I I TOTAL LENGTH: .83 F.A. PROJ NO. I -I - I I(ID-64 RAP-39) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 45IO8I10000 CLOQUALLUM ROAD - 2 I IN I I 6041 I 6041 6041 I I PE I I 114.09 TO 15.60 I I MJR CLASS of WK: 4 IR/W I I (Mile post 14.09 to mile post 15.60 I I WORK CODES: ABD ICON I I IRealign and Regrade I I TOTAL LENGTH: 1.51 F.A. PROJ NO. I _I I ((ID-21 RAP-50) I I UTILITY CODES: PT - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 46I07I96140 GRAPEVIEW LOOP ROAD - 4 I IN I I 3451 I 3451 701 2751 I PE I I 14.43 TO 5.90 I I MJR CLASS of WK: 4 IR/W I I IGrapeview Store to Cronquest Road I I WORK CODES: ABD ICON I I IRealign and Regrade I I TOTAL LENGTH: 1.47 F.A. PROD NO. I sI - I I(ID-63 RAP-61) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 47I09I39410 WINGART ROAD I IPI I I 1501 I 1501 1501 I I PE I I 10.00 TO 0.52 I I MJR CLASS of WK: 4 IR/W I I (North Island Drive to Jarrell Cove State Park I I WORK CODES: ABC ICON I I IRealign and Regrade I I TOTAL LENGTH: .52 F.A. PROD NO. I ®I I I(ID-75) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 48I08I79800 BEAR CREEK - DEWATTO ROAD - 3 I IPI I I 2851 I 2851 2851 I I PE I I 18.60 TO 9.75 I I MJR CLASS of WK: 4 IR/W I I 10.37 W. of Tiger Mission Road to start of Chip Seal . I I WORK CODES: ABC ICON I I IRealign and Regrade I I TOTAL LENGTH: 1.15 F.A. PROJ NO. I -I - I I(ID-38 RAP-54) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 93 TO 98 Page 8 MASON COUNTY P IF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL R (U I ICIFI I OBLIGATION I IN IPROJECT IDENTIFICATION / IAIUI —EXPENDITURE PLAN--- -----SOURCE----- I PLAN 0 ICCI DESCRIPTION OF WORK IRINI I T I L I I F I R ITLI IRINI 1ST 12ND 13RD 14TH I 0 I 0 IRAP I E I 1ST I4TH I I Al IYIIIYEAR IYEAR IYEAR 15TH I T I C ICAPP I D I THRU (THRU T I SI I INI I I 16TH I A I A JUATA I R I 3RD I6TH Y I SI I IGI I I IYEAR I L I L ITIA I L I YEAR IYEAR 49109139630 NORTH ISLAND DRIVE - 1 I IN I I 2301 I 2301 2301 I I PE I I IMP 0.31 TO 1.31 I I MJR CLASS of WK: 4 IR/W I I (End of AC north 1 mite I I WORK CODES: ABD ICON I I (Realign and Regrade I I TOTAL LENGTH: 1.00 F.A. PROD NO. I -I - I ((ID-68) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 50IO8I15500 LYNCH ROAD - 4 I IN I I 4101 I 4101 4101 I I PE I I 16.85 TO 8.85 I I MJR CLASS of WK: 4 IR/W I I (Totten Shores Road to Arcadia Road . I I WORK CODES: ABC ICON I I (Realign and Regrade I I TOTAL LENGTH: 2.00 F.A. PROJ NO. I -I -. I I(ID-52 RAP-31) I I UTILITY CODES: - - ITOT OI Cl ------------------------------------------------------------------------------------------------------------------------------------ 51I07I96140 GRAPEVIEW LOOP ROAD - 2 I IN I I I 2851 2851 851 2001 I PE I I2.78 To 3.50 I I MJR CLASS of WK: 4 IR/W I I IMurray Road South to Lombard Road I I WORK CODES: ABD ICON I I (Realign and Regrade I I TOTAL LENGTH: .72 F.A. PROJ NO. I _I I I(ID-61 RAP-58) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 52I07I96140 GRAPEVIEW LOOP ROAD - 3 I IN I I I 2881 2881 581 2301 I PE I I 13.50 To 4.43 I I MJR CLASS of WK: 4 IR/W I I (Lombard Road to Store I I WORK CODES: ABD ICON I I (Realign and Regrade I I TOTAL LENGTH: .93 F.A. PROD NO. I ®I I I(ID-62 RAP-73) I I UTILITY CODES: - - ITOT 01 0 ------------------------------------------------------------------------------------------------------------------------------------ 53IO8I28850 PICKERING ROAD - 3 I IPI I I I 3101 3101 3101 I I PE I I 13.41 TO 4.51 I I MJR CLASS of WK: 4 IR/W I I IHartstene Bridge Road South to Scenic View Road . I I WORK CODES: ABC ICON I I IReaLign and Regrade I I TOTAL LENGTH: 1.10 F.A. PROD NO. I -I -. I I(ID-47 RAP-42) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 54I09I28370 CLAY ROAD I IUI I I I 951 951 951 I I PE I I 10.99 TO 1.53 I I MJR CLASS of WK: 3 IR/W I I IPhiLLips Lake Loop Road to Dead End I I WORK CODES: ABC ICON I I IRegrade, drain and surface I I TOTAL LENGTH: .54 F.A. PROD NO. I -I - I I(ID-72) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 55I08I20900 CRESTVIEW DRIVE I IUI I I I 4601 4601 4601 I I PE I I 10.00 TO 2.02 I I MJR CLASS of WK: 4 IR/W I I (Agate Store to HiLLcrest Drive I I WORK CODES: ABC ICON I I IReaLign and Regrade I I TOTAL LENGTH: 2.02 F.A. PROJ NO. I -I - I I(ID-59 RAP-48) I I UTILITY CODES: - - ITOT 01 0 ------------------------------------------------------------------------------------------------------------------------------------ SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 93 TO 98 Page 9 MASON COUNTY ------------------------------------------------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------------------------------------------------ P IF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL R IU I ICIFI I OBLIGATION I IN IPROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN 0 ICCI DESCRIPTION OF WORK IRINI I T I L I I F I R ITLI IRINI 1ST 12ND 13RD 14TH I 0 I 0 IRAP I E I 1ST I4TH I I Al IYIIIYEAR IYEAR IYEAR 15TH I T I C ICAPP I D I THRU ITHRU T I SI I INI I I 16TH I A I A IUATA I R I 3RD I6TH Y I SI I IGI I I IYEAR I L I L ITIA I L I YEAR IYEAR ------------------------------------------------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------------------------------------------------ 56IO8I80610 ELFENDAHL PASS ROAD I IUI I I I 4601 4601 4601 I I PE I I 10.00 TO 1.85 I I MJR CLASS of WK: 4 IR/W I I INorth Shore Road to Belfair Tahuya Road I I WORK CODES: ABC ICON I I IRealign and Regrade I I TOTAL LENGTH: 1.85 F.A. PROD NO. I -1 - I I(ID-86 RAP-36) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 57I08I79800 BEAR CREEK - DEWATTO ROAD - 4 I IN I I I 2301 2301 2301 I I PE I I 19.75 TO 10.68 I I MJR CLASS of WK: 4 IR/W I (West end of Chip Seal to Old Belfair Highway I I WORK CODES: ABC ICON I I IRealign and Regrade I I TOTAL LENGTH: .93 F.A. PROD NO. I -I - I(ID-41 RAP-49) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 58I08I51720 JOHN'S PRAIRIE ROAD -2 I IN I I I 4001 4001 4001 I I PE I I 13.42 TO 3.90 I I MJR CLASS of WK: 1 IR/W I I (Capitol Hill Road to S.R. #3 I I WORK CODES: ABD ICON I I INew Construction on New Alignment I I TOTAL LENGTH: .48 F.A. PROJ NO. I -I - I(ID-58) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 59I07I96140 GRAPEVIEW LOOP ROAD - 1 I IPI I I I 2851 2851 651 2201 I PE I I 11.62 TO 2.78 I I MJR CLASS of WK: 4 IR/W I I (Stadium Beach Road to Murray Road South I I WORK CODES: ABD ICON I I IRealign and Regrade I I TOTAL LENGTH: 1.16 F.A. PROD NO. I ®I I I(ID-60 RAP-40) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 60I14I90100 SHELTON - MATLOCK ROAD I IUI I I I 7201 7201 1601 5601 I PE I I 10.91 TO 1.38 I I MJR CLASS of WK: 3 IR/W I I (City Limits to Goldsborough Bridge I I WORK CODES: ABD ICON I I IMinor Widening I I TOTAL LENGTH: .47 F.A. PROJ NO. I -1 -. I I(ID-42 RAP-48) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 61I09I86070 SAND HILL ROAD - 3 I IN I I I 4601 4601 4601 I I PE I I 13.94 TO 5.82 I I MJR CLASS of WK: 4 IR/W I I IDelmore Road to Bear Creek - Dewatto Road I I WORK CODES: ABC ICON I I IRealign and Regrade I I TOTAL LENGTH: 1.88 F.A. PROD NO. I -1 - I I(ID-90) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 62I08I70390 NORTH SHORE ROAD I IN I I I 3101 3101 1801 1301 I PE I I 19.63 TO 10.63 I I MJR CLASS of WK: 4 IR/W I I IMile Post 9.63 to Belfair Tahuya Road I I WORK CODES: ABD ICON I I IRealign and Regrade I I TOTAL LENGTH: 1.00 F.A. PROJ NO. I -1 - I I(ID-37 RAP-51) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 93 TO 98 Page 10 MASON COUNTY P IF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL R IU I ICIFI I OBLIGATION I IN (PROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN 0 ICCI DESCRIPTION OF WORK IRINI I T I L I I F I R ITLI IRIDI 1ST 12ND 13RD 14TH I 0 I 0 TRAP I E I 1ST I4TH I I Al IYIIIYEAR IYEAR (YEAR 15TH I T I C ICAPP I D I THRU ITHRU T I SI I INI I I 16TH I A I A IUATA I R I 3RD I6TH Y I SI I IGI I I IYEAR I L I L ITIA I L I YEAR IYEAR 63I09I67580 LAKELAND DRIVE I IUI I I I 80I 80I 80I I I PE I I ICROWN OF HILL I I MJR CLASS of WK: 4 IR/W I I (Reconstruction of Crown Vertical I I WORK CODES: ABC ICON I ITo improve sight distance I I TOTAL LENGTH: .07 F.A. PROD NO. I —I _ I I(ID-74) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 64I09I64500 ECKERT ROAD I I I I I I 200I 200I 200I I I PE I I I0.00 TO 0.84 I I MJR CLASS of WK: 4 IR/W I I (Minor widening and surfacing I I WORK CODES: ABC ICON I I I(ID-26 Yr-92) I I TOTAL LENGTH: .84 F.A. PROD NO. I —1 _ I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 65I09I64330 STRETCH ISLAND ROAD SOUTH I I I I I I 200I 200I 200I I I PE I I I0.00 TO 0.74 I I MJR CLASS of WK: 4 IR/W I I IMinor Widening and surfacing I I WORK CODES: ABC ICON I I ((ID-25 Yr-92) I I TOTAL LENGTH: .74 F.A. PROJ NO. I —1 — I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 66I09I51930 JENSEN ROAD I IUI I I 1 851 851 851 I I PE I I I0.00 TO 0.48 I I MJR CLASS of WK: 4 IR/W I IBROCKDALE ROAD TO END OF COUNTY ROAD I I WORK CODES: ABC ICON I I (Realign and Regrade I I TOTAL LENGTH: .48 F.A. PROJ NO. I ®I I I(ID-87) I I UTILITY CODES: - - ITOT O) 0 ------------------------------------------------------------------------------------------------------------------------------------ 67I09I47100 TERRACE ROAD I IUI I I I 250I 250I 250I I I PE I I I I I MJR CLASS of WK: 1 IR/W I I (Improve access to U.S. #101 from plats of I I WORK CODES: ABC ICON I I ICanaL View Terrace and White Star. I I TOTAL LENGTH: .70 F.A. PROJ NO. I —1 — I I(ID-76) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 68I09I39630 NORTH ISLAND DRIVE - 2 I IUI I I I 510I 5101 510I I I PE I 11.31 TO 3.09 I I MJR CLASS of WK: 45 IR/W I I (Realign and Regrade I I WORK CODES: ABD ICON I(ID-48) I I TOTAL LENGTH: 1.78 F.A. PROD NO. I —I — I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 69I09I36360 MCMICKEN ROAD I I I I I I 100I 100I 100I I I PE I I I0.00 TO 0.62 I I MJR CLASS of WK: 4 IR/W I I IMinor widening and resurfacing I I WORK CODES: ABC ICON I I(ID-49 Yr-92) I I TOTAL LENGTH: .62 F.A. PROJ NO. I —I -- I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 93 TO 98 Page 11 MASON COUNTY P IF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL R IU I ICIFI I OBLIGATION I IN IPROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN 0 ICCI DESCRIPTION OF WORK IRIDI I T I L I I F I R ITLI IRIDI 1ST 12ND 13RD 14TH I 0 I 0 (RAP I E I 1ST I4TH I I Al IYIIIYEAR IYEAR IYEAR 15TH I T I C ICAPP I D I THRU ITHRU T I SI I INI I I 16TH I A I A IUATA I R I 3RD I6TH Y I SI I IGI I I IYEAR I L I L ITIA I L I YEAR IYEAR 70108128850 PICKERING ROAD - 4 I IN I I I 2501 2501 501 2001 I PE I I 14.51 TO 5.35 I I MJR CLASS of WK: 4 IR/W I I (Scenic View Road to Schneider Road I I WORK CODES: ABC ICON I I (Realign and Regrade I I TOTAL LENGTH: .84 F.A. PROD NO. I -I I I(ID-84 RAP-30) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 71I08I28850 PICKERING ROAD - 5 I IN I I I 2851 2851 1351 1501 I PE I I 15.35 To 6.24 I I MJR CLASS of WK: 4 IR/W I I (Schneider Road to Benson Loop Road I I WORK CODES: ABC ICON I I (Realign and Regrade I I TOTAL LENGTH: .89 F.A. PROJ NO. I -I I I(ID-85 RAP-36) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 72I09I28240 SPENCER LAKE ROAD - 1 I IN I I I 3551 3551 3551 I I PE I I 10.00 TO 1.88 I I MJR CLASS of WK: 4 IR/W I (Agate Road north to 1987 project I I WORK CODES: ABC ICON I I (Realign and Regrade I I TOTAL LENGTH: 1.88 F.A. PROJ NO. I -) - I I(1D-28) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 73I09I28240 SPENCER LAKE ROAD - 2 I IN I I I 801 801 801 I I PE I I 12.45 TO 2.78 I I MJR CLASS of WK: 4 IR/W I I (From 1987 project north to Pickering Road I I WORK CODES: ABC ICON I I (Realign and Regrade I I TOTAL LENGTH: .33 F.A. PROD NO. I -I I I(ID-30) I I UTILITY CODES: - - ITOT OI (l ------------------------------------------------------------------------------------------------------------------------------------ 74I09I23600 SUNSET ROAD I I I I I I 2801 2801 2801 I I PE I I 10.00 TO 1.39 I I MJR CLASS of WK: 4 IR/W I I (Minor Widening and surfacing I I WORK CODES: ABC ICON I I I(ID-27 Yr-92) I I TOTAL LENGTH: 1.39 F.A. PROJ NO. I ®I I I I I UTILITY CODES: - - ITOT 01 0 ------------------------------------------------------------------------------------------------------------------------------------ 75IO8I20000 SATSOP CLOQUALLUM ROAD I IN I I I 4001 4001 801 3201 I PE I I 13.69 TO 6.33 I I MJR CLASS of WK: 4 IR/W I I IMinor widening & BST Surfacing I I WORK CODES: ABC ICON I I(ID-8 Yr-92) I I TOTAL LENGTH: 2.64 F.A. PROJ NO. I -I - I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 76I09I11600 STORY ROAD EXTENSION I IUI I I I 8951 8951 8951 I I PE I I (END OF STORY ROAD TO CLOQUALLUM ROAD I I MJR CLASS of WK: 1 IR/W I I INew construction from end of Story Road to I I WORK CODES: ABD ICON I I ICloquallum Road to provide access to U.S. #101 I I TOTAL LENGTH: .50 F.A. PROJ NO. I -I - I I(ID-78) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 93 TO 98 Page 12 MASON COUNTY ------------------------------------------------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------------------------------------------------ P IF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL R IU I ICIFI I OBLIGATION I IN IPROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN 0 ICCI DESCRIPTION OF WORK IRINI I T I L T I F I R ITLI IRIDI 1ST 12ND 13RD 14TH I 0 I 0 IRAP I E I 1ST I4TH I I Al IYIIIYEAR IYEAR IYEAR 15TH I T I C ICAPP I D I THRU ITHRU T I SI I INI I I 16TH I A I A IUATA I R I 3RD I6TH Y I SI I IGI I I IYEAR I L I L ITIA I L I YEAR IYEAR 77109111200 HURLEY-WALDRIP ROAD I I I I I I 2001 2001 2001 I I PE I I 10.00 TO 0.25 I I MJR CLASS of WK: 4 IR/W I I (Intersection Project I I WORK CODES: ABC ICON I I I(ID-24 Yr-92) I I TOTAL LENGTH: .25 F.A. PROD NO. I —I — I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 78I09I05850 GALLAGHER ROAD I I I I I I 3001 3001 3001 I I PE I I 10.00 TO 1.88 I I MJR CLASS of WK: 4 IR/W I I (Minor widening and surfacing I I WORK CODES: ABC ICON I I I(ID-22 Yr-92) I I TOTAL LENGTH: 1.88 F.A. PROJ NO. I —I — I I I I UTILITY CODES: - - ITOT OI (1 ------------------------------------------------------------------------------------------------------------------------------------ 79100INEW ROAD FROM SOUTH ISLAND DR. TO HARTSTENE IS.NO. RD. I IUI I I I 5701 5701 5701 I I PE I I I I I MJR CLASS of WK: 1 IR/W I I IA New Road from South Island Drive easterly to I I WORK CODES: ABC ICON I I IHartstene Island North Road- follows No. Line of I I TOTAL LENGTH: 1.62 F.A. PROJ NO. I —1 — I ISec. 11 (ID-18) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 80I INEW RD CONNECTING TAHUYA RIVER DRIVE & TAHUYA RIVER RD I I I I I I 5201 5201 5201 I I PE I I I I I MJR CLASS of WK: 1 IR/W I I (Extend Tahuya River Drive (7521) Approx. 1.3 miles to I I WORK CODES: ABD ICON I I (intersect Tahuya River Road (7095) I I TOTAL LENGTH: 1.30 F.A. PROJ NO. I —1 — I I(ID-31 Yr-92) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 81IOOINEW ROAD FROM S.R. #101 TO BROCKDALE ROAD I IUI I I I 6751 6751 6751 I I PE I I I I I MJR CLASS of WK: 1 IR/W I I IA New Road from S.R. #102 east to McEwan Prairie Road. I I WORK CODES: ABD ICON I I ITo provide a direct route from #101 to the Mason Lake. I I TOTAL LENGTH: 2.00 F.A. PROJ NO. I —1 — I (area. A bypass of the City of Shelton (ID-65). I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 82100INEW ROAD FROM JOHN'S PRAIRIE ROAD TO MASON LAKE ROAD I IUI I I I 4001 4001 4001 I I PE I I I I I MJR CLASS of WK: 1 IR/W I I 10.30 miles east of railroad tracks on John's Prairie I I WORK CODES: ABD ICON I I (Road to area of Mikkelsen Road on Mason Lake Road I I TOTAL LENGTH: 1.00 F.A. PROJ NO. I —I — I I(ID-67) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 83) INEW ROAD CONNECTING BINNS SWIGGER LOOP & PHILLIPS ROAD I I I I I I 5201 5201 5201 I I PE I I IAPPROX. 1.3 MILES + BRIDGE I I MJR CLASS of WK: IR/W I I 11.3 miles of New Construction I I WORK CODES: ICON I I I(ID-32 Yr-92) I I TOTAL LENGTH: 1.30 F.A. PROJ NO. I ®I I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 93 TO 98 Page 13 MASON COUNTY ------------------------------------------------------------------=----------------------------------------------------------------- P IF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL R IU I ICIFI I OBLIGATION I IN IPROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN 0 ICCI DESCRIPTION OF WORK IRINI I T I L I I F I R ITLI IRINI 1ST 12ND 13RD 14TH I 0 I 0 TRAP I E I 1ST I4TH I I Al IYIIIYEAR (YEAR IYEAR 15TH I T I C ICAPP I D I THRU ITHRU T I SI I INI I I 16TH I A I A IUATA I R I 3RD I6TH Y I SI I IGI I I IYEAR I L I L ITIA I L I YEAR IYEAR 84100INEW ROAD FROM MASON LAKE ROAD SOUTHEASTERLY TO I IUI I I I 6751 6751 6751 I I PE I I IPICKERING ROAD I I MJR CLASS of WK: 1 IR/W I I INew Road from Mason Lake Road Southeasterly I I WORK CODES: ABDLI ICON I I Ito SR-3 at the Pickering Road I I TOTAL LENGTH: 2.20 F.A. PROJ NO. I -I I I(ID-92) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 85100INEW ROAD FROM S.R. #3 TO GRAPEVIEW LOOP ROAD I IUI I I I 5251 5251 5251 I I PE I I I I I MJR CLASS of WK: 1 IR/W I I (From S.R. #3 east to the Grapeview Loop Road I I WORK CODES: ABD ICON I I Inear the Fair Harbor Marina I I TOTAL LENGTH: 1.80 F.A. PROJ NO. I -1 - I I(ID-66) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 86I INEW ROAD MCREAVY TO MASON LAKE ROAD I I I I I 11500I 1500I 1500I I I PE I I (APPROX. 5 MILES I I MJR CLASS of WK: 4 IR/W I I (Construct Approx. 5.0 miles of new Road from 2 mi. I I WORK CODES: ABD ICON I I (North of Webb Hilt Rd to 1/2 mi. North of Simpson I I TOTAL LENGTH: 5.00 F.A. PROD NO. I -1 - I (Recreation Area (ID-55 Yr-92) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 87100INEW ROAD FROM TWANOH FALLS PLAT EAST TO TRAIL ROAD/106 I IUI I I I 600I 600I 600I I I PE I I IAPPROX. 1.5 MILES I I MJR CLASS of WK: 1 IR/W I I (Construct appoximatly 1.5 miles of new road I I WORK CODES: ABD ICON I I I(ID 94 YR 92) I I TOTAL LENGTH: 1.50 F.A. PROJ NO. I -1 -. I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ SIX YE, TRANSPORTATION IMPROVEMENT PROGRAM 93 TO 8 Page 14 MASON COUNTY SUMMARY OF COSTS BY FUNDING CATEGORY EXPENDITURE PLAN FUNDING PLAN FEDERAL OBLIGATION PLAN A � FUNDED PROJECTS 1st Year 3561 Local 4393 ( Years 1-3 Years 4-6 Totals 2nd Year 1045 I RAP 315 P E 0 0 0 3rd Year 265 j CAPP 0 I R/W 0 0 0 4-6 Year 795 I TIA 0 ' CONST 0 0 0 DATA 0 Fed. 796 Totals ... 5666 5504 0 0 0 ------------------------------------------------------------------------------------------------------------------------------------ UNFUNDED PROJECTS 1st Year 1653 I Local 25508 I Years 1-3 Years 4-6 Totals (Proposed and Unknown) 2nd Year 4921 I RAP 2938 P E 0 0 0 3rd Year 5214 ' CAPP 0 R/W 0 0 0 4-6 Year 17933 I TIA 0 CONST 0 0 0 UATA 825 Fed. 300 � I 0 Totals ... 29721 29571 0 0 0 ------------------------------------------------------------------------------------------------------------------------------------ TOTAL ALL PROJECTS ( 1st Year 5214 I Local 29901 Years 1-3 Years 4-6 Totals 2nd Year 5966 I RAP 3253 I P E 0 0 0 3rd Year 5479 CAPP 0 I R/W 0 0 0 4-6 Year 18728 I TIA 0 CONST 0 0 0 UATA 825 Fed. 1096 r � Totals ... 35387 35075 0 0 0 WHEREAS, in compliance with R.C.W. 36.81.121 and W.A.C. 136-14, the Board of Mason County Commissioners hereby certifies that a priority array of potential projects on this County's arterial system was prepared by the County Engineer and was available to the Board of County Commissioners during the preparation of the proposed Six Transportation Improvement Program for the period January 1, 1993, through December 31, 1998; and WHEREAS, in further compliance with said law, the Board has held thereon public hearing(s) dated September 8, 1992, to consider same. NOW, THEREFORE, BE IT HEREBY RESOLVED by the Board of Mason County Commissioners, in regular session assembled, that the attached Six Transportation Improvement Program for Mason County roads be adopted, as set forth in detail, for the period mentioned, consisting of pages numbered 1 through 14, which are incorporated and made part of this Resolution. Passed and unanimously adopted this 8th day of September, 1992. BOARD OF COUNTY COMMISSIONERS MASON COUNTY, WASHINGTON ATTEST: Laura E.Porter, Chairperson Rebecca 3`Rogers,Clerk of the Board c ' ,41 ✓' c: cmm:. William 0.Hunter,Commissioner Enginwr CRAB Urban Artaid 8osrd Dept.of Trans.Aocsl Programs Div. Resigned 7/31/92 Michael D.Gibson,Commissioner