HomeMy WebLinkAbout2023/10/03 - Commissioner Retreat Packet Board of Mason County Commissioners
Commissioners'Retreat
Public Works
100 W Public Works Dr, Shelton, WA 98584
October 3, 2023
AW 9:00 a.m.
Our Commission meetings are live streamed at http://www.masonwebtv.com/
Effective May 10,2022,regular Commission business meetings will be held in-person and via Zoom.
Please click the Zoom meeting link posted on the Mason County homepage and use the"raise hand"feature to be
recognized by the Chair to provide your comments and testimony.
Public comment and testimony can be provided in-person,and you can also e-mail
msmithgmasoncountywa.gov;mail in to the Commissioners'Office at 411 N 5'St,Shelton,WA 98584;or call
(360)427-9670 ext.419.
If you need to listen to the Commission meeting via telephone,please provide your telephone number to the
Commissioners'Office no later than 4:00 p.m.the Friday before the meeting.
1. Call to Order
2. Roll Call
3. Public Comment
4. 2023 Goal Updates and 2024 Goals:
a. Community Development
b. Public Health
c. Public Works—Utilities &Waste
d. Public Works—Roads
e. Human Resources
f. Support Services
5. Adjournment
Community Development Comments
Project Name
Comprehensive Plan Periodic Update/Environmental Impact Statemenl
County Wide Planning Policies(Shelton)
Public Participation Plan
Required GMA Elements
pital Facilities Plan(Cap Facilities Element+Cap Imp Program]
Docketing Process
EIS Mitigation(Fire,Schools,Transportation
Short Term Rental Regulations
Amendments(2021 ICC adoption)(Building/Planning Fee Update] DONE
rocedures Manual update(Subdivision/FPA Planner position) DONE
Fire Marshal—Long Term program
2024-2025 Fire Investigation Contract
Title 8;8.16 SEPA rules update(consistent with State)
Scanning/Archiving(underway and ongoing)
Subdivision(PLT/LLS/BLA/DPC)Archives
Title 15 Amendments(Enforcement section)
Public Health 2023 Update
Bring WIC&Women's Health Clini c back to south Mason WIC contract secured.Phase one is underway with supplies purchased and
1 County position descriptions complete. Hiring underway.
Connection to City water project grant application complete;design work has
Evergreen Estates begun.The project continues to evolve as access to sewer is more probable
2 now.
Explore options for Capital projects Just received approval(9/23)to use FPHS funds for rent but not construction
3 or purchase.
4 SmartGov staffing Still working with SmartGov for improvement
5 Eliminate briefing for filling openings in existing positions Done
Create code enforcement section Improved coordination and have added an additional staff to support solid
6 waste
7 Build new county website Done: https:Hhealthymasoncounty.com/
8 Analyze non-rep postions In progress
Implement County-wid a electronic employee evaluation
In progress with HR
9 process
10 Create employee recognition program Not complete
11 Review,adjust,and adopt 2015 drought response plan Not complete
12 Review and adopt organization of the Board of Health Complete with the exception of term limits
On-going.Now Mason County Public Health and Human Services 21aunch
Re-brand public health following COVID and maintain re-branded Public Health&Human Services website,social
media,and"Vlog"for health education,program promotion,and to showcase
13 Public Health"in action"
Transition staffing COVID staff have been reassigned into traditional PH work areas(emergency
14 response,communication,epidemiology,chronic disease)
Inventory public water systems and incorporate into Capital
In Progress.Working with Mott McDonald on WRIA 14 plan
15 Facilities section of the Comprehensive Plan
16 Implement a drinking water section into County code Code revision continuing
17 WRIA 14 study Nearly complete
EH additional
Revised EH Building Permit Policy
-Contract signed with Inspect2GO for food Inspector Software
-Responded to reports of Algae Blooms in Lakes
-Amended MCC Title 15 to comply with State PSEA fee requirements
-Onsite Sewage Advisory Committee Bylaws amended and approved by Board
of Health.
-Brady Trucking Aerated Compost Facility permitted and fully operational.
-Major solid waste sites abated.
-50%of Sewage cases corrected and closed
-Translated Food Establishment Application to Spanish(21 page document)
-EH hosted Oscar X02(new septic technology)training for septic service
providers
-First in-person septic homeowner workshop since 2019.
-Added 1FTE to our Solid Waste Code Enforcement program.
-Produced our first annual Water Quality Report for the Clean Water District.
Admin Additional
Completed implementation of Permitium online
Community Health Additional
2021 CHA published on healthymasoncounty.com
Presentation of current gaps and recommendations for the 2022-2026 CHIP
presented to the Health Coalition Executive Committee
WIC Coordinator/Certifier position being posted on 9/27
I. Training and onboarding to occur October—December
Target start date to begin serving clients January 2024
In the interim,supplies,equipment,and furniture ordered and ready for
launch
Working with epidemiologist to evaluate pilot program data and design
proposals/parameters for permanent programs
New contracts and programs launching in January 2024 a working with
epidemiologist to establish key performance indicators
2024 goals
Hire permanent Community Health Specialist to manage
contracts under Housing&Homelessness and Behavioral
Health. Position will specialize in Coordinated Entry,engaging
both homeless crisis services providers and behavioral health
service providers,to strengthen our local system and provide
enhanced wrap around services to clients.
Social media content scheduled throughout the year;annual
calendar being developed and"Public Health in Layman's
Terms"Blog being planned,which will feature staff highlights,
interviews,and photos/videos of staff in action in the field
Impact Reports published on healthymasoncounty.com
Impact Reports presented to BOH,BoCC,Housing&Behavioral
Health Advisory Board
Establish teams within public health:1)Housing&Behavioral
Health,2)Health Education&Outreach,and 3)Registered
Nurses to ensure coordination,collaboration,and coverage of
programs.
Hire a permanent Community Health Specialist to manage
contracts under Housing&Homelessness and Behavioral
Health.The position will specialize in Coordinated Entry,
engaging both homeless crisis services providers and behavioral
health service providers,to strengthen our local system and
provide enhanced wrap-around services to clients.
Full online permitting services for all permit types #of completed online permit submittals
Full online Sewage Contractor Licenses #of completed online initial applications and renewals
Train new hires thoroughly in their assigned programs within
New staff able to handle 90%of duties without supervisor input.
6mo of hire
Revise and amend MCC 6.64 Group B Water System Regulations
and revise associated policy for consistency Revised policy approved by BoH. Revised policy approved by BoH
Implement New Food Program Inspection Software Inspections completed using new software. Inspection Reports available
online
Revise and amend MCC 6.68 Water Adequacy regulations for
consistency with RCW 90.94. Revise policy for to suite changes. Revised code adopted by BoCC
Amend MCC to allow county abatement of solid waste without
lien of property taxes Revised abatement code adopted by BoCC.
Provide incentive for staff to attain RS/REHS Signed and approved revised position descriptions
Clean-up and revise MCC Title 6 regulations for clarity and
consistency and to bridge gaps in coverage. Code revisions approved by BoCC
Increase number of solid waste facilities inspected Number of facilities inspected
Create new Assistant/Deputy EH Manager,develop PD,and fill
position Assistant/Deputy EH Manager hired.
Clean Water District Advisory Committee bylaws drafted and
approved by Board of Health Approved bylaws by BoH
Mason County Public Works- Utilities
9/27/2023
Mission•
Mason County Utilities and Waste Management is responsible for managing water, wastewater and
solid waste facilities in the unincorporated areas of Mason County.
This includes operations of the Rustlewood and Beards Cove water systems and the Rustlewood, North
Bay/Case Inlet, and Belfair water reclamation/sewer collection and treatment facilities.
The Division also manages solid waste, recycling and household hazardous waste collection at the
Union, Hoodsport and Belfair Drop Box stations and at the Eells Hill Transfer Station near Shelton.
The 2024 budget for the Mason County Public Works Utilities Division was prepared to be consistent
with the budget instructions from the Commissioners. It includes:
• Utility rates/fee increases:
o Solid Waste rate increases are tied to expected increases in transportation and disposal,
net effect to overall budget 4%, as well as a general inflationary increase of 2%factored
in for expected price increases.
o Wastewater: proposed rate increases were derived based on actual Utility need and the
desire to work towards becoming financially solvent while maintaining affordability to
the best of our ability.
o Water: proposed new methodology and rate structure which promotes equity among
customers and encourages resource conservation.
• Continued REET funds for payment of debt and facility improvements for Belfair and Rustlewood
systems.
• Operation and maintenance costs to improve Belfair, North Bay, and Rustlewood sewer
systems.
• Capital Improvements to upgrade biological process control as well as supervisory command
and data acquisition reliability at the Belfair WRF, replace tipping floor and the outer station
booths, as well as replacing the aged AC water pipe and associated valving in Beards Cove.The
System plan for the NBCI will be updated as well as Rustlewood.
Page 1 of 13
Mason County Public Works- Utilities
9/27/2023
Fund 402 —Solid Waste
Mission: The Solid Waste Division operates the main transfer station at Eells Hill, as well as three
satellite drop-box stations at Belfair, Hoodsport and Union. Over 50,000 Tons of wastes from all over
Mason County are handled each year at these facilities. Additionally, Household Hazardous Waste is
accepted at the main Eells Hill Transfer Station and the drop-box stations accept used oil and antifreeze.
2023 Accomplishments:
• Added additional open days to each site. Shelton is now open 7 days/week and Belfair is open 5
days/week. All stations are open Saturdays and Sundays.
• Received new Yard Goats.
• Ordered and received a new roll-off truck.
• Improved solid waste compaction for transport with the clamshell/compactor attachment for
the excavator/loader. Resulting so far in an estimated trip reduction of 29 loads this year.This
calculates into an estimated savings of$43,716 to date on transport costs.
o This year we purchased a second Clamshell/compactor attachment so there are no
lapses in our ability to maximize the capacity of each trailer that is loaded.
• Cleared the site of excess brush.
• Staff replaced the stairways at Hoodsport.
• Implemented new physical security measures at our Eels Hill facility. Added another security
coded door.
• Continue to work with the Treasurer's office to update and train employees on improved Cash
Handling Procedures and policies.
• Recruited enough new SWAC members to maintain a quorum.
• Worked with Parametrix to facilitate all required testing and site access.
2024 Goals:
• Continue to work closely with MC Health, WA DOE and Parametrix to satisfy all remaining
requirements for"Post-Closure Care and Monitoring".
o Expect to get final report for this testing cycle early in 2024 for review and submittal to
WA DOE. Approval to end post-closure responsibilities to follow.
• Continue to build on the work efficiencies we have recognized over the past year, provide
excellent customer service, and improve our facilities to make them safer and more reliable.
• County will continue to implement required activities associated with our CROP (Contamination
Reduction and Outreach Plan) in concert with the SWAC (Solid Waste Advisory Committee).
• Replace all outer station operator stations.
• Purchase new skid steer w/attachments to consistently maintain the site.
Page 2 of 13
Mason County Public Works- Utilities
9/27/2023
• Evaluate customer flow patterns and capacity regarding commercial and residential traffic at
the Eels Hill facility; Optimize existing infrastructure and plan for future improvements.
• Research Household Hazardous Waste operations to include present and future capacity
needs.
• Seek funding sources for capital work through grants or low-interest loans.
• Remove and replace existing asphalt tipping floor surface with a new concrete deck.
Budget Savings:
• Staff continue to work diligently to achieve optimal weight for containers transported via our
long-haul contract. This results in savings to the County for disposal.
• We continue experience savings through coordination and cooperation by the Road Department
and ER&R:
o tackling equipment needs and repairs, as old equipment has failed.
o The Road department came and assisted Solid Waste staff with another hole in our
tipping floor,this extended the useful life until the entire tipping floor can be replaced
with a more durable concrete surface.
o PW Engineering has provided a construction estimate based on the proposed use.
Budget Issues•
• As part of our Solid Waste System Capital Improvement Needs Assessment, our consultant
identified significant improvements that are needed. It will be important to prioritize and
carefully select and deliver the work that will provide the most benefit for the cost.
• The volume of waste our Eells Hill Facility is receiving is increased substantially, 24.2%+
compared to 2020 figures. As the County grows in population and businesses,waste volume will
increase to the point that a larger facility will be needed. The current tipping fee structure
generates enough revenue for operational expenses and some repairs, but is not enough to
fund an expanded facility without outside funding. If state funds are not available,the County
may need to increase tipping fees higher to fund the new facility.
Page 3 of 13
Mason County Public Works- Utilities
9/27/2023
Personnel Summary:
The proposed 2024 Organizational Chart looks like:
Public Works Director
Deputy Director/U&W
Manager
Solid Waste Program Manager
Solid Waste Attendant Solid Waste Operators
(6) (5)
Page 4 of 13
Mason County Public Works- Utilities
9/27/2023
Fund 403 — North Bay Sewer
Mission: This division operates and maintains the North Bay Wastewater Reclamation Facility, as well as
the collection system in the Allyn area, with over 1,200 residential and commercial connections.
2023 Accomplishments:
• Utilization of SmartGov and improved inter-county communication
• Operators have taken and passed exams increasing their state certification levels in wastewater.
• Improved collections of overdue accounts led to an increase in revenues in 2023.
• A new automatic transfer switch installed in the Lakeland pump station emergency generator.
• Overflow storage and Effluent storage ponds were emptied in the summer.
• Retrained staff on troubleshooting and repairing Grinder pumps.
• Rewrote the bulk of Mason County Code Chapter 13 Utilities.
• Troubleshot and repaired the TPU pump station electrical issues.
• An RFP was published for a Facility plan/General Sewer plan.
o Scoping the effort currently.
o Will begin the process before the end of the year and continue through 2024.
2024 Goals:
• Zero permit violations
• Develop new General Sewer/Facility Plan for the NBCI Wastewater Utility
• Improve on collection system repairs and maintenance to reduce Inflow and Infiltration(1&1).
• Complete Mason County Code revisions make them more "User" friendly and consistent.
• Maintain existing staffing levels of seven operators (shared with all utilities) and a
water/wastewater manager.
• Provide operator flexibility by cross-training operators on different utility systems and allow
staff to move into new roles as we have absences or turnovers in the workforce.
• Complete required maintenance projects that have been deferred.
o sprayfield maintenance
• Prepare all reporting documents to maintain our permits.
• Improve operation of plant to meet all State Permit requirements;
• Provide all documentation needed for State Audits;
• Repair and/or replace all pumps out of service at lift stations or at the plant.
• Provide input to the GSP/FP rewrite.
Page 5 of 13
Mason County Public Works- Utilities
9/27/2023
Budget Issues•
• A new rate and rate structure need to be agreed upon and implemented.
• Increases in repair costs are expected as old parts are replaced.
• Pump repairs/replacements at some lift stations will be needed.
• Flow and loadings coming into the plant are nearing the level where Ecology will require the
County to plan for plant expansion.
o Staff will be more aggressive inspecting and identifying sources of inflow and infiltration.
Personnel Summary:
The proposed 2024 Organizational Chart for all water and wastewater systems looks like:
Public Works Director
Deputy Director of Public Works-Utilities
Water/Wastewater Manager
CS&W Operators(7)
Building Maintenance/Remodel Requests:
• System upgrades that are needed have been budgeted as repairs within the fund and will be
completed by contractors selected through appropriate procurement processes.These include:
o Valve and pump repairs.
o Identified spray field repairs.
o Electrical and control repairs/corrections
Page 6 of 13
Mason County Public Works- Utilities
9/27/2023
Fund 411 — Rustlewood Water and Sewer
Mission: This division operates and maintains the Rustlewood Wastewater Treatment Plant and the
collection system in the Rustlewood area,with 145 connections. Additionally,this division operates and
maintains the drinking water system in Rustlewood with 145 connections.
2023 Accomplishments:
• Utilization of SmartGov and improved inter-county communication
• Maintained direct communication and working relationship with the RW HOA
• Performed source water testing.
• Assisted WA DOH with a Sanitary Survey of the potable water system.
• Installed new PRV replacement in the drinking water system.
• Purchased new reservoir inspection equipment.
• Installation of the final few water meters at Rustlewood is in process and will be completed by
the end of November 2023.
• Improved collections of overdue accounts led to an increase in revenues in.
• Completed consumer confidence report for the system and mailed to all customers.
• Rewrote the bulk of Mason County Code Chapter 13. Utilities.
• Assisted in the development of a new water consumption-based rate structure that promotes
equity among customers and water conservation with as minimal of an impact as possible.
2024 Goals:
• Improve on the current level of efficiency through improved plant and collection system repairs
and maintenance.
• Provide operator flexibility by continuing to train and cross-train operators on different utility
systems and allow staff to provide operational redundancy.
• Implement new rate structure from flat rate to one based on consumption.
• Prepare all reporting documents to maintain our permits.
Budget Issues•
• The rate revenues received by customers do not pay for all the expenses of the water and sewer
systems, requiring REET 2 funds to pay for debt and capital improvements.
• Installation of the final few water meters will be complete by end of year 2023. Development of
a rate based on consumption is has occurred and will be presented to the BOCC for approval for
implementation.
Page 7 of 13
Mason County Public Works- Utilities
9/27/2023
Personnel Summary:
The proposed 2024 Organizational Chart looks like:
Public Works Director
Deputy Director of Public Works-Utilities
Water/Wastewater Manager
CS&W Operators(7)
Page 8 of 13
Mason County Public Works- Utilities
9/27/2023
Fund 412— Beards Cove Water
Mission: This division operates and maintains the Beards Cove drinking water system with over 450
connections.
2023 Accomplishments:
• Utilization of SmartGov and improved inter-county communication
• Completed Sanitary Survey with WA DOH.
o Deficiencies noted in survey have all been corrected.
• System met all Washington Department of health testing and reporting requirements in 2022.
• Operators improved their certification levels by passing state examinations.
• Completed installation of water service meters for all connections.
• Completed new consumer confidence report for the system and mailed to all customers.
2024 Goals:
• Improve the current level of efficiency through improved system repairs and maintenance.
Provide operator flexibility by cross-training operators on different utility systems and allow
staff to move into new roles as we have turnover in the workforce.
• Replace the AC pipe and associated piping in the intersection of Larson Lake Rd and Larson Rd.
in partnership with the Roads dept who wishes to address the complaints associated with this
intersection.
• Prepare all reporting documents to maintain our permit.
• Provide all documentation needed for State Audits.
• Meet all water quality testing and reporting requirements for the system.
Budget Issues:
• Development of a rate based on consumption is underway and will be presented to the BOCC
for approval for implementation.
• This should provide better equity in charges by charging large water users more than smaller
users.
Page 9 of 13
Mason County Public Works- Utilities
9/27/2023
Personnel Summary:
The proposed 2024 Organizational Chart looks like:
Public Works Director
Deputy Director of Public Works-Utilities
Water/Wastewater Manager
CS&W Operators(7)
Page 10 of 13
Mason County Public Works- Utilities
9/27/2023
Fund 413— Belfair Sewer
Mission: This division operates and maintains the Belfair Wastewater Reclamation Facility, as well as
the collection system in the Belfair area,with about 420 equivalent residential units.
2023 Accomplishments:
• Continued utilization of SmartGov and improved inter-county communication.
• The bulk of Chapter 17 (Utilities) has been rewritten and is only waiting on rate and rate
structure information.
• Improved collections of overdue accounts led to an increase in revenues in 2023.
• Continue to maintain all components associated with the UV system keeping it functioning in
"As-New" condition.
• Blowers have been rebuilt.
• New pumps have been installed at LS#3 with an additional third pump that can be installed to
maintain station redundancy as required.
• A third pump has been procured as a backup for Belfair's LS-1
• LS#4 has been built and will be ready to accept flows as soon as the RR crossing is completed.
• We have processed over 90 Sewer adequacy applications for the Olympic Ridge development so
far this year.
• The storage pond was emptied, dried, and inspected this summer.
• Engineering interns performed GIS work identifying/mapping some of our assets in the field.
2024 Goals:
• Zero discharge violations
• Complete sewer extension north to Log Yard Rd.
• Inspect and track new connections as they develop.
• Update the Control and monitoring system (SCADA) as well as provide redundant Historian
capabilities.
• Focus on process control.
• Provide operator flexibility by cross-training operators on different utility systems and allow
staff to move into new roles as we have turnover in the workforce.
• Prepare all reporting documents to maintain our permit;
Page 11 of 13
Mason County Public Works- Utilities
9/27/2023
Personnel Summary:
The proposed 2024 Organizational Chart looks like:
Public Works Director
Deputy Director of Public Works-Utilities
Water/Wastewater Manager
CS&W Operators(7)
Building Maintenance/Remodel Requests:
• Plant upgrades that are needed have been budgeted as capital improvements within the fund
and will be completed by contractors selected through appropriate procurement processes.
These include:
o Various pump, piping, and valve repairs.
Page 12 of 13
Mason County Public Works- Utilities
9/27/2023
Fund 428—Solid Waste Post-Closure
This fund started at approximately 20+years ago,with the closure of the landfill on Eells Hill Road. Since
that time, groundwater monitoring has taken place. In 2017 Ecology and MCPH stated quarterly
monitoring for two more years was required before they can decide on landfill closure. Questions still
remain regarding the results from the latest ground water monitoring. We are currently in discussion
with MCPH and our consultant to map out what the next steps are/will be.
Page 13 of 13
TOTAL$S COUNTY>> MASON
A TOTAL COSTRUCTION DONE-columns(13)+(14) $ 14,049,825 DATE RECOMMENDED PROG.SUBMITTED August 22,2022
B COMPUTED COUNTY FORCES LIMIT $ 1,260,423 DATE OF FINAL ADOPTION September 27,2022
C TOTAL COUNTY FORCES CONSTRUCTION-(column(14) $ 960,500 ORDINANCE/RESOLUTION NO. 2022-063
DATE OF AMENDMENT
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15)
w o z o f SOURCES OF FUNDS ESTIMATED EXPENDITURES
V' ca Q W W (,7 U W W
W � = ~ ROAD SEGMENT INFORMATION z z a OTHER FUNDS CONSTRUCTION
a Z PROJECT NAME a J Z � COUNTY
Q g w H N PE&CE RIGHT OF WAY GRAND TOTAL
z W > w > ¢ ROAD PROGRAM 595.10) (595.20) CONTRACT COUNTY
Z ~ AMOUNT ( (ALL595)
z o z FUNDS SOURCE FORCES
d ROAD# ROAD NAME BMP EMP FFC (Miles) d
01 1 Harstine Island Polyester Overlay CRP 2026 30000 Harstine Bridge Road 0.12 0.40 07 0.28 D 1 0 2,237,000 BRAC 0 2,237,000 0 2,237,000
COMPLETED 2023
02 2 Mason Lake Road Improvement Project CRP 2031 52210 Mason Lake Road 5.23 6.23 07 1.00 D E 250,000 550,000 STP 800,000 0 800,000
COMPLETED 2023
03 3 Clear Zone Improvements CRP 2027 Various 14.76 G 1 0 1,427,000 HSIP 1,427,000 1,427,000
COMPLETED 22-2023
04 4 Mason Lake Road Improvement Project#2 52210 Mason Lake Road 6.23 7.83 07 1.60 D E 118,000 692,000 STP 10,000 0 800,000 0 810,000
COMPLETED 2023
05 5 Shelton Valley Road Culvert Replacement 05930 Shelton Valley Road 1.94 2.06 08 0.12 A,L 1 66,700 492,300 RAP 45,904 0 513,096 0 559,000
06 6 Kamilche Point Road Improvement Project 14880 Kamilche Point Road 0.02 2.80 08 2.78 D E 165,250 984,750 STP 10,000 0 1,140,000 1,150,000
07 7 Sunnyside Road Resurfacing Project 42360 Sunnyside Road 1.55 3.45 09 1.90 RC E 95,000 0 0 0 95,000 95,000
COMPLETED 2023
08 8 Toonerville Bridge Replacement 79800 Bear Creek Dewatto Rd. 5.28 5.30 07 0.02 1 1 1,860,000 BRAC 600,000 50,000 1,210,000 1,860,000
09 9 Kelley Hall Road Resurfacing Project 01300 Kelley Hall Road 0.00 1.95 09 1.95 RC E 97,500 0 0 0 97,500 97,500
COMPLETED 2023
10 10 Programmatic Bridge Repair Various 0.00 1 E 65,000 0 10,000 5,000 25,000 25,000 65,000
11 11 County-Wide Small Capital Projects Various 0.00 Other E 100,000 0 10,000 5,000 45,000 40,000 100,000
12 12 Neighborhood Roadway Safety Grants Various 0.00 Other E 10,000 0 10,000 10,000
13 13 Johns Prairie Road/SR 3 Intersection 91720 Johns Prairie Road 3.60 3.77 17 0.17 Other E 55,000 0 15,000 40,000 55,000
DESIGN WORK COMPLETED
14 14 North Fork Goldsborough Bridge Repair 04670 Little Egypt Road 0.34 0.35 09 0.02 1 1 167,000 BRAC 42,000 0 125,000 167,000
15 15 Uncle Johns Lower Culvert 23500 Agate Loop 1.02 1.02 09 0.00 L,A 1 152,000 598,000 FBRB(RCO) 50,000 40,000 660,000 0 750,000
16 16 Sunnyslope Road Resurfacing Project 61950 Sunnyslope Road 0.00 0.55 09 0.55 RC E 30,000 0 30,000 30,000
COMPLETED 2023
17 17 Harstine Island Bridge Column Repairs 30000 Harstine Island Road 0.12 0.40 07 0.28 D 1 315,090 2,684,910 BRAC 740,000 0 2,260,000 0 3,000,000
WAS NOT FUNDED
18 18 Belfair Connector-Log Yard Road E. New Log Yard Road E. 0.00 A,B,D,G S 250,000 0 200,000 50,000 0 0 250,000
ON HOLD FOR WSDOT DESIGN
19 19 Belfair Connector-Romance Hill Road 86500 Romance Hill Road 0.00 A,B,D,G S 100,000 0 50,000 50,000 0 0 100,000
ON HOLD FOR WSDOT DESIGN
20 20 Skokomish Valley Road Reconstruction 41640 Skokomish Valley Road 3.80 4.60 08 0.80 A,B,D,G 1 0 10,000 FbD 10,000 0 0 0 10,000
PERMIT STAGE
21 21 North Island Drive Culvert Replacement 39630 North Island Drive 3.46 3.47 07 0.01 LA 1 320,000 500,000 RAP 125,771 40,000 654,229 0 820,000
PE,ROW COMPLETED 2023 CONST 2024
22 22 Old Belfair Highway Improvement Project 98250 Old Belfair Highway 1.20 2.60 07 1.40 LA 1 232,000 1,188,000 RAP 120,000 700,000 450,000 1,270,000
COMPLETED 2023
23 23 Trails Road Alternate Route-Rasor Road Rasor Road 09 0.00 Other S 150,000 0 0 150,000 0 0 150,000
IN PROCESS OF PURCHASEING ROW 2023
24 24 WSDOT/County Intersection Feasability Clifton,OBH/SR300,N.Bay/SR3 Other S 40,000 0 40,000 40,000
25 25 County Safety Program-Guardrail Bridge Retrofit Varies 0.00 G I 0 385,000 HSIP 49000 13,000 323,000 0 385,000
......................................: .................
PE,COMPLETED 2023 CONST.2024
26 26 County Safety Program-Horizontal Curve Analysis Varies 0.00 G 1 01 73,000I HSIP 0 0 73,000 73,000
COMPLETED 2023
...._....................................................._ ..........................
27 27 County Safety Program-Sign Post Reflective Panels Varies 0.00 G 1 54,000 HSIP 4000 0 50,000 54,000
................................................................................,......................................
COMPLETED 2023
28 30 Northshore Road Little Shoefly Culvert Replacement 70390 Northshore Road 8.10 8.10 0.00 LA I 300,000 10000 20,000 170,000 100,000 300,000
.......................................................................................................................
COMPLETED 2023
................................................................................;......................................
29 64 Shelton Matlock Road Shoulder Safety Improvement 90100 Shelton Matlock Road 1.76 7.67 07 5.91 D E 10,000. 10,000 0 0 0 10,000
PAGE/PROGRAM TOTALS,CONSTRUCTION 2,921,540 13,902,960 2,098,675 463,000 13,089,325 960,500 16,674,500
CRAB FORM#3,MC REVISED 9/28/2023
1AIVIVUHL l.U1V31 KUl.11UIV rmuunAivI rum LUL4 (/-1U-LUL3)
TOTAL$'S COUNTY>> MASON
A TOTAL COSTRUCTION DONE-columns(13)+(14) $ 10,301,857 DATE RECOMMENDED PROG.SUBMITTED
B COMPUTED COUNTY FORCES LIMIT $ 1,260,423 DATE OF FINAL ADOPTION
C TOTAL COUNTY FORCES CONSTRUCTION-(column(14) $ 1,049,840 ORDINANCE/RESOLUTION NO.
DATE OF AMENDMENT
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15)
w o z = o F F SOURCES OF FUNDS ESTIMATED EXPENDITURES
o
0 m ¢ w_ u z z
= cc ROAD SEGMENT INFORMATION 0 z w OTHER FUNDS CONSTRUCTION
a Z PROJECT NAME a W.
z COUNTY
g w PE&CE RIGHT OF WAY GRAND TOTAL
z W > b > ¢ ROAD PROGRAM COUNTY
o z AMOUNT (595.10) (595.20) CONTRACT (ALL 595)
a ROAD# ROAD NAME BMP EMP FFC (Miles)
O w FUNDS SOURCE FORCES
01 1 Eells Hill Road(gravel conversion) 40850 Eells Hill Road 0.00 5.61 09 5.61 RC 272,790 0 0 0 0 272,790 272,790
02 2 Tahuya Blacksmith Rd(gravel conversion) 70670 Tahuya Blacksmith Rd 2.90 4.63 09 1.73 RC E 108,990 0 0 0 0 108,990 108,990
03 3 Ellis Rd(gravel conversion) 15960 Ellis Rd 0.00 0.58 09 0.58 RC E 35,000 0 0 0 0 35,000 35,000
04 4 Yates Rd(gravel converstion) 36600 Yates Rd 0.00 1.31 09 1.31 RC E 82,530 0 0 0 0 82,530 82,530
05 5 Shelton Valley Road Culvert Replacement 05930 Shelton Valley Road 1.94 2.06 08 0.12 A,L 1 66,700 492,300 RAP 45,904 0 513,096 0 559,000
06 6 Kamilche Point Road Improvement Project 14880 Kamilche Point Road 0.02 2.80 08 2.78 D E 139,050 890,950 STP 0 0 1,030,000 1,030,000
07 7 Tahuya Post Office Bridge 70390 N.Shore Rd 14.88 14.90 08 0.02 1 1 200,000 0 0 0 200,000 200,000
08 8 Toonerville Bridge Replacement 79800 Bear Creek Dewatto Rd. 5.28 5.30 07 0.02 1 1 1,860,000 BROS 600,000 50,000 1,210,000 1,860,000
09 9 Bear Creek Dewatto Rd 79800 Bear Creek Dewatto Rd. 0.43 1.02 07 0.59 RC 1 64,000 576,000 RAP 20,000 20,000 300,000 300,000 640,000
10 10 Programmatic Bridge Repair Various 0.00 1 E 65,000 0 10,000 5,000 25,000 25,000 65,000
11 11 County-Wide Small Capital Projects Various 0.00 Other E 100,000 0 10,000 5,000 45,000 40,000 100,000
12 12 Neighborhood Roadway Safety Grants Various 0.00 Other E 10,000 0 10,000 10,000
13 13 Johns Prairie Road/SR 3 Intersection 91720 Johns Prairie Road 3.60 3.77 17 0.17 Other E 55,000 0 15,000 40,000 55,000
14 14 North Fork Goldsborough Bridge Repair 04670 Little Egypt Road 0.34 0.35 09 0.02 1 1 167,000 BROS 0 0 167,000 167,000
15 15 Uncle Johns Lower Culvert 23500 Agate Loop 1.02 1.02 09 0.00 L,A 1 152,000 598,000 FBRB(RCO) 50,000 40,000 660,000 0 750,000
16 16 Bear Creek Dewatto Rd(Tiger) 79800 Bear Creek Dewatto Rd. 1.53 1.96 07 0.43 RC i 103,500 931,500 RAP 20,000 20,000 995,000 1,035,000
17 17 Shelton Matlock Rd Safety Enhancement 90100 Shelton Matlock Rd 1.76 7.67 17,07 5.91 G E 0 1,396,692 HSIP 0 0 1,396,692 0 1,396,692
18 18 Belfair Connector-Log Yard Road E. New Log Yard Road E. 0.00 A,B,D,G S 250,000 0 200,000 50,000 0 0 250,000
19 19 Belfair Connector-Romance Hill Road 86500 Romance Hill Road 0.00 A,B,D,G S 100,000 0 50,000 50,000 0 0 100,000
20 20 Skokomish Valley Road Reconstruction 41640 Skokomish Valley Road 3.80 4.60 08 0.80 A,B,D,G 1 0 1,600,000 FLAP 0 1,600,000 0 1,600,000
21 21 North Island Drive Culvert Replacement 39630 North Island Drive 3.46 3.47 07 0.01 L,A 1 320,000 500,000 RAP 125,771 40,000 654,229 0 820,000
22 22 Beerbower Rd(gravel conversion) 02230 Beerbower Rd 1.25 3.06 09 1.81 RC E 114,030 0 0 0 0 114,030 114,030
23 23 Rasor Road Extention 62400 Rasor Road 09 0.00 Other S 150,000 0 0 150,000 0 0 150,000
24 24 WSDOT/County Intersection Feasability Clifton,OBH/SR300,N.Bay/SR3 Other S 40,000 0 40,000 40,000
.......................................
25 25 County Safety Program-Guardrail Bridge Retrofit Varies 0.00 G 1 0€ 385,000 HSIP 49000 0 336,000 0 385,000
26 26 Shetland Road RID Shetland Road 0.00 1.30 1.30 RC E 71,500 RID 0 0 71,500 71,500
27 27 Roessel Road 69660 Roessel Road 0.00 0.29 9.00 0.29 RC E 120,000s 0 120,000 120,000
CRAB FORM#3,MC REVISED PAGE/PROGRAM TOTALS,CONSTRUCTION I pi 2,548, 68,9421 1,196,675 470,000 9,252,017 1,049,840 12,017,532 9/28/2023
Operations and Maintenance
Completed in 2023
Chip seal: Sunnyside Rd, Sunny Slope Rd, and Kelley Hall Rd
Hot Mix Asphalt Pre-Level: Lakeland Dr, Homestead Dr,Shadowood Dr,Sunrise Dr, also paved Front St for
the City
Hot Mix Asphalt Shoulder work: Grapeview Rd, Lynch Rd, Shelton Matlock Rd,Johns Prairie Rd, McReavy
Rd, Sand Hill Rd, Brockdale Rd
Gravel shoulder work and drainage: Mason Lake Rd, Old Belfair Highway
Rock Creek Bridge Superstructure replacement
Trails Rd HMA patching and drainage work
Sunny Side Rd culvert replacement
North Shore Lil Shoe Fly culvert replacement
Operations and Maintenance for 2024
Chip seal; Belfair Tahuya Rd,Trails Rd, Union area drainage and chip seal, Shelton Matlock, Beerbower
Rd,Tahuya Blacksmith Rd,Yates, Eells Hill Rd, and Ellis Rd
HMA Pre-Level: Old Olympic Highway, Satsop Cloquallum
HMA shoulders: Shelton Matlock Rd, Mason Lake Rd
Gravel shoulder work: Kamilche Point Rd, Shelton Matlock Rd
Satsop Cloquallum culvert replacement
Matlock Brady culvert replacement
Hurley Waldrip culvert replacement
/ HR 2023-2024 Strategic Plan
Goals Strategic Initiatives—2023-2024 Strategic Outcome Measures 2023-1 Update 2023-2 Update 2023-3 Update
High-level long-term What we will do to cause measurable progress toward that goal What we will measure to quantify results
results and communicate progress
we must achieve
If we provide . competitive,sustainable total compensation package...
1. In Progress:Complete 4 open CBAs:Sheriff's #of contracts ratified -4 contracts ratified. -2 contracts ratified. -2 contracts ratified.
Deputies,AFSCME,OPD Support Staff,Juvenile -Year over year compensation -Non-Represented -FSA program (Total of 8)
Detention cost increases Class/Comp Study completed/implemented.
Total Reward and 2. In Progress:Bargain 2 upcoming CBAs: Probation, -Compensation is within+/-of completed
Benefits Public Defenders comparable agencies -FSA approved by the
3. Completed:Begin implementation of Non- Board
Represented Class/Comp Study
4. Completed:Research FSA/HSA options
employeesWe can attract&hire ..
1. Completed:Implement NEOGov -1st year turnover -Linkedln:70%increase in -NEOGov fully -Attended 3
2. In Progress:New hire onboarding processes -Time to hire followership implemented recruiting events
3. Ongoing•Increase recruitment presence in the -#of applicants per position -Working to link -Anecdotal evidence of -Internship program
community and at regional events -Linked ln/social media activity Instagram account increased talent pools debrief/report
4. In Progress:Increase recruitment presence on -Up to 3,750 followers on and quality of applicants. forthcoming
Recruitment social media and identify new talent pipelines. Facebook -Attended 3 recruiting -Linkedln followers:
and hiring 5. Completed:Research conducting a county-wide events 282
career fair. -Linkedln followers:271 -FB Followers:4,300
6. Completed:Develop and implement Internship -FB followers:3,900 -IG Followers: 114
Program AG Followers:75
-3 interns in PW through
August
...who reflect the diversity of the communities we serve...
1. In Progress:Implement a Legal and Effective -retention rate -Delivered 2 -Removed technology
Diversity and Interviewing training for recruitment panels. %of hiring managers trained Legal/Effective barrier to application
inclusion 2. Ongoing Identify ways to decrease barriers Interviewing classes process(print/scan).
throughout the process
...offer them opportunities to develop and grow...
1. Completed:Create a Supervisor Toolkit with -%of employees with -Supervisor Toolkit -Supervisor Boot Camp -Expanded new
performance evaluation templates,tools to performance evaluations referenced and being 5/16 employee
conduct performance reviews,interview question -number of added used by hiring managers -Verbal SWOT 5/17 orientation
examples,etc. certifications for Career -Delivered 2 leadership
Learning and 2. In Progress:Implement leadership development Incentive Policy classes
Development curriculum. %of employees who promote -Hosting Supervisor Boot
3. In Progress: Career Incentive Program Policy 5.13 successfully Camp May 16
—adding approved certifications. -Percentage of employees
4. In Progress:Improve new employee orientation; trained in leadership
add a new supervisor/manager orientation development
1(rev. 6/28/23) 9/27/2023
1�:i� HR 2023-2024 Strategic Plan
support ..
1. In Progress:Learn Munis functionality to -Number of handoffs in HR -Implement NEOGov -Completed position -Waiting on chart of
Systems streamline HR processes. processes control training accounts
2. Completed:Implement NEOGov -#s of processes mapped
productive....then,employees will be healthy,engaged and
1. Completed:Conduct employee engagement -2022 employee engagement -142 responses to -Second employee -Third employee
survey and complete organizational analysis survey Engagement Survey, townhall conducted townhall...
Engagement and 2. In Progress:Benefits Fair and training -Number of employees briefed survey on 2/27/23 5/31/23
Well-Being opportunities for employees attending events/training -First employee townhall
3. In Progress:Increased engagement with County -Number of opportunities for conducted on 2/23/23
leadership employees to engage with
leadership
...and our HR team members will be learning&growing as service providers
1. Completed:HR staff have development plans, -%of employees with -HR employees have -HR employees have -HR employees
classes,and on-the-job training opportunities development plans that are spent time with roads spent time with roads spent time with
(SHRM,LRI,WCIF&BF training,WAPELRA,etc.) tracked and resourced crew,Clerk's office,and crew,transfer station, roads crew,transfer
HR Team 2. In Progress:HR will identify opportunities for Sheriff's office and jail station,jail,
Development cross-training as well as developing skills in major detention,Clerk's
functional areas within HR,as applicable. Office,elections
3. In Progress:HR will job shadow customers to
understand their work duties and environment
Stay legally compliant and that allows us . .. the more strategic work above
1. In Progress:Evaluate organizational risk more #of policies updated and -2 updates to personnel -1 update to personnel -2 update to
comprehensively. adopted policies policies personnel policies
2. In Progress:Reasonable Suspicion training and #of risks found/mitigated
Legal Compliance policy
3. In Progress:Personnel Policies update
4. In Progress:Update Risk and Safety Policies
2(rev. 6/28/23) 9/27/2023
HR 2024 Strategic Plan
Goals Strategic Initiatives—2024 Strategic Outcome Measures
High-level long-term What we will do to cause measurable progress toward that goal What we will measure to quantify results
results and communicate progress
we must achieve
If we provide a competitive,sustainable total compensation package...
1. New: Complete 2024 contracts before expiration #of contracts completed
2. New: Research total compensation packages -Year over year compensation cost
Total Reward and increases
3. New:Work with hiring managers to implement
Benefits total compensation practices when possible. -Compensation is within+/-of
comparable agencies
We can attract&hire employees based upon the right competencies,at the right time...
1. New: Utilize NEOGov for statistical updates and -1st year turnover
key performance indicators(KPIs) -Time to hire per department
2. New:New hire onboarding process -#of applicants per position
Recruitment 3. In Progress: Increase recruitment presence in -Linked In/social media activity
and hiring the community and at regional events -Internship applications and
4. New: Increase recruitment presence on social program report.
media and identify new talent pipelines
5. New:Conduct Internship Program
...who reflect the diversity of the communities we serve...
1. In Progress: Implement a Legal and Effective -retention rate
Diversity and Interviewing training for recruitment panels. %of hiring managers trained
inclusion 2. New: Identify ways to decrease barriers
throughout the recruitment process
opportunities to develop and grow..
1. In Progress: Implement leadership development %of employees with performance
curriculum. evaluations
Learning and 2. New: Improve new employee orientation; add a %of employees who promote
Development new supervisor/manager orientation successfully
-Percentage of employees trained
in leadership development
...and support them with efficient,flexible,and customer-focused systems& ..
1. In Progress: Learn Munis functionality to -Number of handoffs in HR
streamline HR processes. processes
Systems 2. New: Upon completion of Chart of Accounts,
utilize Munis to implement position control.
productive....then,employees will be healthy,engaged,and
1. In Progress:Conduct employee engagement -2023 employee engagement survey
survey and complete organizational analysis and measurement
Engagement and 2. In Progress: Benefits Fair and training -Number of employees attending
Well-Being opportunities for employees events/training
3. New: Increased engagement with County -Number of opportunities for
leadership—Employee Townhalls employees to engage with
leadership
...and our HR team members will be learning&growing as service providers
1. Ongoing:All staff have development plans,with %of employees with development
classes and on-the-job training opportunities plans that are tracked and
(SHRM, LRI,WCIF&BF training,WAPELRA,etc.) resourced
HR Team
2. Ongoing:Staff will identify opportunities for -#of departments/hours out in the Development cross-training as well as developing skills in field with employees
major functional areas within HR,as applicable
3. Ongoing:Staff will job shadow employees to
understand their work duties and environment
1(rev. 9/26/23) 9/27/2023
HR 2024 Strategic Plan
Stay legally compliant and that allows us . .. the more strategicabove
1. In Progress: Evaluate organizational risk more #of policies updated and adopted
comprehensively. #of risks found/mitigated
2. In Progress: Reasonable Suspicion training and
Legal Compliance policy
3. Ongoing: Personnel Policies update
4. New: Update Risk and Safety Policies
2(rev. 9/26/23) 9/27/2023
2023 PROJECT PRIORITY LISTS
Budget Office
Project Name Cost Funding Source Budgeted?Y/N Timeline/Benchmarks Comments
ARPA Funding Obligated&Spent 6/30/2024 $ 6,500,000 Yes Federal grant money W/like to have all ARPA Funding Expended by 6/2024
Will allow us to
$14k pd in implement other Munis
Chart of Accounts Revision/Crosswalk 1/1/2024 $ 28,000 Yes,2021 modules&help make Original timeline of 7/1/22 was too optimistic.New goal is 1/1/24 to implement this huge project.
us more efficient
Position Control 3/1/2024 $ - N/A No more manual Need COA revision done before Position Control implementation
tracking of positions
Revisions to Purchasing Policy 10/1/2023 $ N/A Helps w/grant funding Include suspension/debarment process&other purchasing clarifications.Draft is complete 7/2023
Motor Pool Written Policy&Procedures 2/1/2024 $ - N/A Documented process This has been started.Group Effort.Need to revisit.
&procedures
Executime purchase&implement 7/1/2024 $ 125,000 No Will take the place of Need to purchase the module,implement Position Control,&Fund&BARS Crosswalk before
Help PWs&Health transition to Munis modules 2023&2024 $ 200,000 No Helpful to have all This is a HUGE undertaking&will require PWs buy-in.
Delete Skokomish Flood Zone&create lines w/in Road fund 2024 Less funds is less complicated
for this
Delete Trial Court Improvement Fund&create lines w/in CE 2025 Less funds is less complicated
(District Court?)
Archive&Digitize Records Ongoing
Central Services Administration
Project Name Cost Funding Source Budgeted?Y/N Timeline/Benchmarks Comments
Fill Switchboard position/x419 position C/E Y ASAP Annie's last day is May 12,2023;Kacee hired,now have x419 position to fill
Provide support to Administrator Priceless When x419 filled Support for Mark(Admin,organize office,digitize files,manage emails)
Transfer VAB&staff Lead duties to McKenzie Time Effective 4/1/23 McKenzie and Cassidy have been attending monthly VAB meetings
Create training/meeting space in modular courtroom $ 25,000 REET 1 N 2023/2024
Prepare for Anne's(Parks)retirement in 2024 2 month cross-over C/E N 2023/2024 Post position in October 2023 with intent to hire in November for cross over training in December/January.
Prepare for Diane's retirement in 2024 A Lot N 2023/2024 Restructure Diane's position so in 2024 McKenzie is Office Manager for Commissioners'Office;
decide what to do for DEM,IT,Parks and Facilities
Fill Public Records Coordinator Position C/E Y Filled position Completed
All Commissioners'meeting CD's are digitized and transferred;disposed/transferred of 50+boxes of
Digitize Commissioners'records/CD's and send to SOS Staff Time On-going records
Implement Policy Index Staff Time 2023 Completed;moved to Intranet
Community Development Comments
Project Name
Comprehensive Plan Periodic Update/Environmental Impact Statement
County Wide Planning Policies(Shelton)
Public Participation Plan
Required GMA Elements
pital Facilities Plan(Cap Facilities Element+Cap Imp Program)
Docketing Process
EIS Mitigation(Fire,Schools,Transportation
Short Term Rental Regulations
Amendments(2021 ICC adoption)(Building/Planning Fee Update; DONE
rocedures Manual update(Subdivision/FPA Planner position) DONE
Fire Marshal—Long Term program
2024-2025 Fire Investigation Contract
Title 8;8.16 SEPA rules update(consistent with State)
Scanning/Archiving(underway and ongoing)
Subdivision(PLT/LLS/BLA/DPC)Archives
Title 15 Amendments(Enforcement section)
Project Name Cost Funding Source Budgeted?Y/N Timeline/Benchmarks Comments
DCD Organization(with Managers and less leads)
All SmartGov permits available through on-line portal
Emergency Management
Project Name Cost Funding Source Budgeted?Y/N Timeline/Benchmarks Comments
Resolve Tammi's position Y Completed Implemented Lead Pay
Increase Duty Officer Pool Y In Progress Added Dept.Manager to the Roster;Lt.Severence being added,one addl't in progress
UTV Usage Program In-Process Tranfering to MCFD-4(Once Tracks are mounted)
Projected Closeout EMPG-R-20 Fed thru WA State Y Closed CERT Trailers Completed and deployed
EOC Operations Manual Y DRAFT Work In Progress/Based on McEwen Fire AAR
MC Hazard Mitigation Plan Update $ 85,000 Federal Y 2nd Qtr. ON TRACK TO COMPLETE/Contractor,Bridgeview Consultant
DEM Equipment Inventory Completed Using existing software;updated as items are received
EOC Upgrades TBD Federal Y 3-4th Qtr. In progress,on track to complete by by 3rd Qtr 2024
SHSP Grant Equipment Inventory 4th Qtr. On track to complete/Applicaition completed&submitted to State fo review
Tier II Reporting-Hazardous materials 4th Qtr. DEM Staff reports to WA State
SAR Commo Project-Zoleo TBD Federal Y 3-4th Qtr. Approved to be purchased-County Assets/Partners($250 each/$50 annual license)
Hazard Materials Emergency Response Plan 4th Qtr. Reviewed/Update In-progress
Mass Notification System-Code Red $ 16,800 Federal Y In Progress Currently paid for out of SHSP,but qualifies for EMPG funding/MC Parnter Asset
IPAWs Revisions-Warning System Completed Incorporated into Code Red
Continued NIMS Training Y Quaterly ICS-191/300/400/402 IMT Specific Tng./Additional training scheduled for MC Staff
ICS Implementation Plan Completed Traning and Exercise Plan&County Training Schedule
City of Shelton Coordination No Response Continuing to reach out.
County Animal Response Team(CART) Unknown TBD N Beginning New organization to replace Disaster Animal Response Team(County Affiliation Terminated)
Search&Rescue Unknown TBD Y Continuous Coordinating with MC,Sheriff's Office and MCSAR.(Call-out,Training,&Exercise)
Code Red Alert Notification System $ 16,800 Federal Y Grant Cycle Currently paid for out of SHSP,but qualifies for EMPG funding/MC Parnter Asset
Community Emergency Response Team(CERT) Unknown TBD N Expansion (CERT)Contiuing to expand the Program to needy communities in Mason County
MC Disaster Air Response Team(DART) N/A N/A TBD Development Program development using local Sanderson Field Pilots(Becoming NIMS Compliant)
Oysterfest Unknown TBD TBD Deadline 09/09/23 Organization planning with Mason County Emergency Management,attempting to contact
CWDP Grant(Wildfire Plan) $ 79,590 Federal N In-Progress Second round of grants not due until October,2023,Update Completed under review PUD-1
Facilities and Grounds
Project Name Cost Funding Source Budgeted?Y/N Timeline/Benchmarks Comments
BUILDING 1
MOVE ELECTION/TAX BOXES Staff Time 2023 COMPLETED
ELECTION REMODEL $ 25,000 REET Y Mar-23 COMPLETED
CARPET FINANCE $ 10,000 REET Y 2023 COMPLETED
2ND FLOOR BACK HALL REMODEL $ 1,500 Facilities-C/E Y 2023 COMPLETED
2ND FLOOR HALL LIGHTING $ 1,500 Facilities-C/E Y 2023 COMPLETED
REMOVE SMOKING AREA $ 250 Facilities-C/E Y 2023 COMPLETED
NEW WINDOWS $ 50,000 REET N 2024
BUILDING 2
Project Name Cost Funding Source Budgeted?Y/N Timeline/Benchmarks Comments
REMODEL BOILER ROOM $ 1,000 Facilities-C/E Y 2023 COMPLETED
REPAIR SCREEN DOORS $ 1,000 Facilities-C/E Y 2023 COMPLETED
NEW A.0 $ 30,000 REET N 2025
BUILDING 3
Project Name Cost Funding Source Budgeted?Y/N Timeline/Benchmarks Comments
REMODEL BASMENT $ 25,000 REET N AS SOON AS CORONER IS MOVED
NEW GUTTER SYSTEM $ 5,000 REET N 2023 COMPLETED
CELING TILE $ 7,000 REET N 2024
HEAT PUMP $ 25,000 REET N 2024
NEW ROOF $ 75,000 REET N 2024
REMOVE FRONT STEPS $ 7,000 REET N 2024
REPAIR SIDE STEP AND RAMP $ 5,000 REET N 2023 COMPLETED
Project Name Cost Funding Source Budgeted?Y/N Timeline/Benchmarks Comments
BUILDING 4
Project Name Cost Funding Source Budgeted?Y/N Timeline/Benchmarks Comments
HEAT PUMP $ 25,000 REET N 2025 29 YEARS OLD
NEW ROOF $ 30,000 REET N 2025
BUILDING 5
Project Name Cost Funding Source Budgeted?Y/N Timeline/Benchmarks Comments
PRUNE MONKEY TREE $ 1,000 Facilities-C/E Y 2023 COMPLETED
BUILDING 6
Project Name Cost Funding Source Budgeted?Y/N Timeline/Benchmarks Comments
REMODEL FOR TRAINING ROOMS $ 25,000 REET N 2024 WHEN WE MOVE THERAPEUTIC COURT OUT
FIX RAMPS $ 2,500 REET N 2024
BUILDING 7
Project Name Cost Funding Source Budgeted?Y/N Timeline/Benchmarks Comments
REMOVE TREE IN PARKING LOT $ 5,000 REET N 2024 DANGER TREE
BUILDING 8
Project Name Cost Funding Source Budgeted?Y/N Timeline/Benchmarks Comments
UPGRADE SPACE $ 5,000 REET N 2024 AS SOON AS SCANNING IS DONE
REPLACE WINDOWS $ 40,000 REEET N 2025
INSULATE ROOF $ 15,000 REET N 2025
BUILDING 9
Project Name Cost Funding Source Budgeted?Y/N Timeline/Benchmarks Comments
BUILDING 10
Project Name Cost Funding Source Budgeted?Y/N Timeline/Benchmarks Comments
FINISH PHASE 2 $ 1,000,000 REET Y 2023/2024 ON HOLD UNTIL FURTHER NOTICE
BUILDING 11
Project Name Cost Funding Source Budgeted?Y/N Timeline/Benchmarks Comments
REMOVE REST OF BENTONITE $ 20,000 REET N 2023/2024
NEW GUTTERS $ 10,000 REET N 2023/2024
BUILDING 12
Project Name Cost Funding Source Budgeted?Y/N Timeline/Benchmarks Comments
MOVE FACILITIES $ 25,000 REET N 2023 CITY HEARING 8/28/23
MOVE CORONER $ 25,000 REET N 2023
COURT HOUSE
Project Name Cost Funding Source Budgeted?Y/N Timeline/Benchmarks Comments
ELEVATOR $ 165,000 REET N ASAP Contract signed 4/25/23
REMODEL $ 1,000,000 REET N 2025 AS SOON AS B-10 IS DONE
SHERIFFS OFFICE
Project Name Cost Funding Source Budgeted?Y/N Timeline/Benchmarks Comments
Project Name Cost Funding Source Budgeted?Y/N Timeline/Benchmarks Comments
REMODEL FRONT OFFICE $ 30,000 REET N 2023 COMPLETED
HEAT PUMP EVIDENCE $ 15,000 REET N 2023 DUCTLESS SYSTEM
NEW WINDOWS $ 30,000 REET N 2024
M-H
Project Name Cost Funding Source Budgeted?Y/N Timeline/Benchmarks Comments
REFINISH FLOORS $ 7,000 REET N 2024
REMODEL RESTROOMS $ 10,000 REET N 2024
REMODEL KITCHEN $ 10,000 REET N 2024
JUVIE
Project Name Cost Funding Source Budgeted?Y/N Timeline/Benchmarks Comments
REDO RAMPS $ 7,000 REET N 2024
JAIL
Project Name Cost Funding Source Budgeted?Y/N Timeline/Benchmarks Comments
Circulating Pump-Hot Water $ 8,000 REET N 2023 Replaced one pump-Completed
PAINT INTERIOR $ 50,000 REET N 2025
OUTSIDE FENCE $ 15,000 REET N 2025
CHURCH HOUSE
Project Name Cost Funding Source Budgeted?Y/N Timeline/Benchmarks Comments
SHED FOR TRACTOR $ 5,000 REET N 2023 COMPLETED
GUTTERS $ 500 Facilities-C/E Y 2023 COMPLETED
BELFAIR SHERIFF
Project Name Cost Funding Source Budgeted?Y/N Timeline/Benchmarks Comments
REPAIR ALL DAMAGE TO BUILDING $ 20,000 REET N 2023
MOVE TO NEW LOCATION/REMODEL $ 100,000 REET N 2023 WAITING FOR FLOORPLAN
Information Technolor;ll
Project Name Cost Funding Source Budgeted?Y/N Timeline/Benchmarks Comments
Fiber Upgrade Project $320K ARPA Y 6/1/2024 deadline Should be done this fall;permits approved;waiting on HCC for construction
Migration to new fiber/install new Backbone Staff time By end of 2023 May need some odds and ends;dependent on fiber install
2023 Computer Upgrades(92 Computers) Y Sep-23 12 left for 2023,waiting for new hire to start as training opportunity
Move Zoom to Teams Platform Save$4600 Jun-23 Many staff are using Teams instead of Zoom-cut Zoom cost in half
Create/Launch County Intranet Staff time initial launch completed.Need input for future expansion
Improve internal communications with departments Staff time on-going Tech tips and development of intranet
Clean out Server Rooms Staff time Completed Completed
Server Room Buildout&Migration from Bid 3 to Bldg 10 Minimal 2023/2024 Minimal Cost,Operational-we cleaned out a rack a PW and will move to Bid 10 soon
Server OS Upgrades $10k in 2023 Pay from IT,Operational,have inventory of servers,14 licenses ordered Aug 2023,$10K
Continue Developing IT Policies Staff time Document Current Procedures-in progress
Computer Management System $100K N Test,Purchase&Implement-have tested Pro Services-tested on system,IT staff didn't like it
Office 365 Completed Install Training is needed-need ideas on what to train on
Building 10 District Court Move REET Waiting on buildout
Building 12 Move Minimal 3/4 complete $90 per month for wireless-mostly completed,waiting on buildout to finish
Building 11 Completed Security System is managed by MCSO
MUNIS Upgrade IT Y Chart of Accounts Dependent-Operational-moving to Cloud 2024
Staff time+some
Relocate MCSO Belfair Location $ Waiting for floorplan;will take up to 2 weeks of 2 IT employee's time
Project Name Cost Funding Source Budgeted?Y/N Timeline/Benchmarks Comments
Telecommunications Audit-Spyglass n/a Completed Spyglass is paid
Sheriff and Election Website Migration Staff time Completed Will be managed by IT staff
Replace Jail Cameras $100? ? Getting Quote will be contracted with CGI;replace cameras/cable-no more spare parts for existing system-CTG i
gathering equipment and will schedule soon
Cybersecurity on-going Albert Sensor,KnowBe4(Risk Pool pays for 1/2),MFA,SonicWall,WAZUH software
Audit/Plan Network Switch Replacement $50K N 2023/2024 About 40-50 total switches;approximate cost$1,000 each;Plan approved at 9 switches a year.Will
purchase first batch at end of 2023 if budget allows.
Parks&Trails
Project Name Cost Funding Source Budgeted?Y/N Timeline/Benchmarks Comments
New Mower $ 38,578 REET y 7/1/2022 COMPLETED
New Gate Sunset Bluff $ 1,500 REET y 5/1/2022 COMPLETED
Mason Lake Ramp Re-surface $ 6,500 REET y 4/1/2022 COMPLETED
RV Cover for Park Host-Sandhill $ 17,500 REET 2 y Fall 2023 Briefed on 5/1/23;expecting delivery in September 2023
RV Cover for Park Host-Mason Lake $ 17,500 REET 2 y 2024 Needs excavation work to enlarge area;complete when caretaker position is vacant
Foothills Dog Park $ 20,000 REET 2/Donations y Fencing completed April 2023;need to finish to comply for helipad,will be paid with SHSP grant
Oakland Bay Speed Bumps $ 2,000 REET 2 y COMPLETED Completed April 2023
MCRA Shop Lean To $ 10,000 REET2 y Will be completed in 4th quarter 2023
RV Cover for Park Host-Truman Glick $ 17,300 REET 2 y COMPLETED 1/15/2023
New Batting Cage Machines-MCRA $ 28,300 REET 2 y COMPLETED 1/31/2023
Play Toy Bark $ 4,500 REET 2 y COMPLETED 1/31/2023
Playground Equipment-Sandhill $ 75,000 REET 2 y 4th quarter 2023 Go to bid 8/29/23
Field Groomer $ 18,000 REET 2 y Received in 2023 Stored at Sandhill Park
Gang Mower $ 30,000 REET 2 y PLR in 2024 budget
Painting restroom interiors at various parks REET2 y Winter 2023
Latimer's Landing new asphalt parking lot $ 25,000 RCO grant N Winter/early 2024 Applying for RCO grant due in Sept 2023