Loading...
HomeMy WebLinkAbout80-94 - Res. Setting Bridge Limits RESOLUTION NO. 60-94 Bridge Limits WHEREAS, in conformance with procedures adopted by the Washington State Association of Counties, and in the interest of safety, Mason County makes periodic inspections of bridges on the County Road System; and, WHEREAS, inspection and evaluation of Mason County bridges was completed on July 17, 1994; and, WHEREAS, such inspection revealed no measurable deterioration in Mason County bridges; and, WHEREAS, such inspection has determined that three (3) bridges of Mason County's 57 bridges cannot be certified as safe for all legal highway loads. NOW, THEREFORE, BE IT RESOLVED, that the gross loads continue to be limited, and that the lane limitations and speed limits continue to be posted to control traffic volume and impact loading on the bridges, all as listed below, for a period of one (1) year, unless the Board shall, by appropriate action based upon proper certification, modify or remove such restrictions. Bridge Bridge Max. Load Max. Speed No. Name Limit No. of Lanes Limit 10290-0.35 Hliboki Bridge --- 1 --- Bulb Farm Road 10510-0.14 Rock Creek #3 BR. --- 1 --- Bolling Road 90100-23.34 Ever's Bridge 24 Ton 1 (truck or bus) --- Shelton-Matlock Road NOW, THEREFORE, BE IT FURTHER RESOLVED that the County Engineer shall post the said bridges as listed with the load, speed and/or lane limits as set forth herein. Violation of these load limits shall constitute a misdemeanor in accordance with RCW 26.75.270. DATED this 9th day of August, 1994. BOARD OF COUNTY COMMISSIONERS MASON COUNTY, WASHINGTON 7 M. L. FAUGHENDERU Chairperson LAURA E. PORTER, mmi Toner WILLIAM 0. HUNTER, Commissioner ATTEST: REBECCA S. ROGERS Clerk of the Board P ROVED ' S TO FORM: MICHAEL CLIFT Deputy Prosecuting Attorney C: Public Works Sheriff Prosecutor