Loading...
HomeMy WebLinkAbout70-95 - Res. Six Year Transportation Improvement Program 1996 to 2001 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1996 TO 2001 MASON COUNTY HEARING DATE : 06/27/95 ADOPTION DATE: 07/11/95 COUNTY NO: 23 RESOLUTION NO: 70-95 P IPPIF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL R IARIU I ICIFI I OBLIGATION I ISIIN IPROJECT IDENTIFICATION / IAIUI —EXPENDITURE PLAN--- -----SOURCE----- I PLAN 0 ITOICCI DESCRIPTION OF WORK IRINI I T I L I I F I R ITRI LI IRIDI 1ST 12ND 13RD 14TH I 0 I 0 IRAP I E I 1ST I4TH I I II Al IYIIIYEAR IYEAR IYEAR 15TH I T I C ICAPP I D I THRU ITHRU T I TI SI I INI I I 16TH I A I A IUATA I R I 3RD I6TH Y I YI SI I IGI I I IYEAR I L I L ITIA I L I YEAR IYEAR 11 11 IMASON COUNTY'S TRANSPORTATION PLAN ICIFI 511 511 I I 1021 141 I 88I PE 881 I I ITO COMPLETE THE TRANSPORTATION ELEMENT OF MASON I I MJR CLASS of WK: IR/W I I I ICOUNTY'S COMPREHENSIVE PLAN AS REQUIRED BY THE GROWTH I I WORK CODES: U ICON I I I IMANAGEMENT ACT. I I TOTAL LENGTH: F.A. PROJ NO. I -I I I I(4A) I I UTILITY CODES: - - ITOT 881 0 ------------------------------------------------------------------------------------------------------------------------------------ 2I 21 ICOUNTY WIDE PAVEMENT ON AC PAVEMENT I IFI 2561 2561 2561 7681 15361 6301 9061 I PE I I I I I I MJR CLASS of WK: 5 CAPP IR/W I I I I(ID-1) I I WORK CODES: BD ICON I I I I I I TOTAL LENGTH: F.A. PROJ NO. I -I I I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 3I I ICOUNTY WIDE AC PAVEMENT ON BST PAVEMENT I IFI 1461 1461 1461 4381 8761 3661 5101 I PE I I I I I I MJR CLASS of WK: 5 CAPP IR/W I I I I(ID-2) I I WORK CODES: ICON I I I I I I TOTAL LENGTH: F.A. PROJ NO. I -( I I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 4I 41 ICOUNTY WIDE BST PAVEMENT ON GRAVEL I IFI 2141 2141 2141 6421 12841 12841 I I PE I I I I I I MJR CLASS of WK: 4 IR/W I I I I(ID-3) I I WORK CODES: ABC ICON I I I I I I TOTAL LENGTH: F.A. PROJ NO. I -( I I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 5I 51 ICOUNTY WIDE SAFETY PROJECTS I IFI 2141 2141 2141 6421 12841 12841 I I PE I I I I I I MJR CLASS of WK: IR/W I I I IIncludes traffic control, drainage, walks, I I WORK CODES: ABHKO ICON I I I (bikeways and guardrails I I TOTAL LENGTH: F.A. PROJ NO. I -I - I I ]Projects off roadway surfaces (ID-4) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 6I 61 ICOUNTY WIDE MINOR CONSTRUCTION I IFI 1071 1071 1071 3211 6421 6421 I I PE I I I I I I MJR CLASS of WK: IR/W I I I (Reconstruction of sub-base and resurfacing I I WORK CODES: ABC ICON I I I Ilntersections - sight distance improvements I I TOTAL LENGTH: F.A. PROJ NO. I -I I I I(ID-5) I I UTILITY CODES: - - ITOT 01 0 ------------------------------------------------------------------------------------------------------------------------------------ SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1996 TO 2001 Page 2 MASON COUNTY P IPPIF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL R [AR[U I ICIFI I OBLIGATION I ISIIN (PROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN 0 ITOICCI DESCRIPTION OF WORK IRINI I T I L T I F I R ITRI LI IRIDI 1ST 12ND 13RD 14TH [ 0 I 0 TRAP I E I 1ST I4TH I [ II Al IYIIIYEAR (YEAR (YEAR 15TH I T I C ICAPP I D I THRU ITHRU T I T I S I I INI I I 16TH I A I A I DATA I R I 3RD I6TH Y I YI SI I IGI I I (YEAR I L I L ITIA I L I YEAR (YEAR 71 71 ICOUNTY WIDE BRIDGE & LARGE CULVERT CONSTRUCTION I IFI 771 771 771 2311 4621 4621 I I PE I I I I I I MJR CLASS of WK: 4 IR/W I I I I(ID-6) I I WORK CODES: L ICON I I I I I I TOTAL LENGTH: F.A. PROJ NO. I ®I _ I I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 8I11[07I91720 JOHN'S PRAIRIE ROAD - 3 I IFI 431 I I I 431 101 I 331 PE I I I 12.72 TO 2.74 I I MJR CLASS of WK: 6 IR/W I I I IRailroad Crossing I I WORK CODES: I ICON I I I I(ID-81) I I TOTAL LENGTH: .02 F.A. PROJ NO. I _I UTILITY CODES: RRS - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 9I12[08I51800 MCEWAN PRAIRIE ROAD I IFI 43I I I I 431 101 I 331 PE I I I 10.81 TO 0.83 I I MJR CLASS of WK: 6 IR/W I I I IRailroad Crossing I I WORK CODES: I ICON I I I I(ID-79) i I TOTAL LENGTH: .02 F.A. PROJ NO. I ®I I I I I I UTILITY CODES: RRS - - [TOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 10I13[08[15500 LYNCH ROAD - 3 I IFI 5971 I I I 5971 5971 I I PE I I I 14.95 TO 6.85 I I MJR CLASS of WK: 4 IR/W I I I (0.30 North of Bay East to Totten Shores I I WORK CODES: ABD ICON I I I IRealign and Regrade I I TOTAL LENGTH: 1.90 F.A. PROJ NO. I ®[ I I I(ID-45 RAP-49) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 11I14[08I15500 LYNCH ROAD - 4 I IFI 6281 I I I 6281 6281 I I PE I 1 I 16.85 TO 8.85 I I MJR CLASS of WK: 4 IR/W I I I (Totten Shores Road to Arcadia Road I I WORK CODES: ABC ICON I I I IRealign and Regrade I I TOTAL LENGTH: 2.00 F.A. PROJ NO. I ®I I I I(ID-52 RAP-31) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 12[15[08I86070 SAND HILL ROAD - 1 I IFI 6451 I I I 6451 6451 I I PE I I I 10.33 TO 2.66 I I MJR CLASS of WK: 4 IR/W I I I (From mile post 0.33 to Transfer Station I I WORK CODES: ABD ICON I I I IRealign and Regrade I I TOTAL LENGTH: 2.33 F.A. PROJ NO. I —I I I I(ID-88) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 13I16I08I79800 BEAR CREEK - DEWATTO ROAD - 1 I IFI 3001 I I I 3001 421 2581 I PE I I I 16.57 TO 7.45 I [ MJR CLASS of WK: 4 RAP IR/W I I 10.07 East of Panther Lake Road to 0.16 East of I I WORK CODES: ABC ICON I I I (Gold Creek Road - Realign and Regrade [ I TOTAL LENGTH: .88 F.A. PROJ NO. I -I I I I(ID-39 RAP-61) I [ UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1996 TO 2001 Page 3 MASON COUNTY P IPPIF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL R IARIU I ICIFI I OBLIGATION I ISIIN IPROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN 0 ITOICCI DESCRIPTION OF WORK IRINI I T I L T I F I R ITRI LI IRIDI 1ST 12ND 13RD 14TH I 0 I 0 [RAP I E I 1ST I4TH I I II Al IYIIIYEAR (YEAR (YEAR 15TH I T I C ICAPP I D I THRU ITHRU T I T) SI I INI I I 16TH I A I A IUATA I R I 3RD I6TH Y I YI SI I IGI I I IYEAR I L I L ITIA I L I YEAR IYEAR 14118108110000 CLOQUALLUM ROAD - 2 I IFI 6101 I I I 6101 3181 2921 I PE I I I 114.09 TO 15.60 I I MJR CLASS of WK: 4 RAP IR/W I I I IMiLe post 14.09 to mile post 15.60 I I WORK CODES: ABD ICON I I I IRealign and Regrade I I TOTAL LENGTH: 1.51 F.A. PROJ NO. I -I I I I(ID-21 RAP-50) I I UTILITY CODES: PT - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 15I19I08I10000-14.82 HERMAN'S OLD SCHOOLHOUSE BRIDGE I IPI 2361 I I I 2361 2361 I I PE I I I 114.80 TO 14.84 I I MJR CLASS of WK: 4 IR/W I I I (Replacement of Bridge plus new approaches I I WORK CODES: L ICON I I I I(ID-11) I I TOTAL LENGTH: .04 F.A. PROJ NO. I -1 I I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 16I20IO8I10000-15.60 HERMAN'S CLOQUALLUM CREEK BRIDGE I IPI 2361 I I I 2361 2361 I I PE I I I 115.58 TO 15.62 I I MJR CLASS of WK: 4 IR/W I I I (Replacement of Bridge plus new approaches I I WORK CODES: L ICON I I I I(ID-12) I I TOTAL LENGTH: .04 F.A. PROJ NO. I -I I I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 17I23I07I96140 GRAPEVIEW LOOP ROAD - 6 I IFI 2991 I I I 2991 221 2771 I PE I I I 16.93 TO 7.98 I I MJR CLASS of WK: 4 RAP IR/W I I I INeLSon Road to S.R. #3 I I WORK CODES: ABD ICON I i I IRealign and Regrade I I TOTAL LENGTH: 1.05 F.A. PROJ NO. I -I I I I(ID-50 RAP-63) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 18I24I08I10000 CLOQUALLUM ROAD - 1 I IPI 3981 I I I 3981 3981 I I PE I I I 111.75 TO 12.47 I I MJR CLASS of WK: 4 IR/W I .I I (Rock Bluff Curve (1 mile west of Bulb Farm Road) I I WORK CODES: ABD ICON I I I IRealign (Relax Curve) I I TOTAL LENGTH: .72 F.A. PROJ NO. I -I I I I(ID-51 RAP-41) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 19I--I09I54650 ST. ANDREWS DR I IFI 31 40I I I 431 101 I 331 PE I I I 12.00 TO 2.04 I I MJR CLASS of WK: 6 IR/W I I I IRaiLroad Crossing I I WORK CODES: I ICON I I I I(ID-95) I I TOTAL LENGTH: .04 F.A. PROJ NO. I -I I I I I I UTILITY CODES: RRS - - ITOT 01 0 ------------------------------------------------------------------------------------------------------------------------------------ 20I21I08I28850 PICKERING ROAD - 3 I IPI 441 3211 I I 3651 3651 I I PE I I I 13.41 TO 4.51 I I MJR CLASS of WK: 4 IR/W I I I IHartstene Bridge Road South to Scenic View Road I I WORK CODES: ABC ICON I I I IRealign and Regrade I I TOTAL LENGTH: 1.10 F.A. PROD NO. I -I I I I(ID-47 RAP-42) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------=----------------------------------------- SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1996 TO 2001 Page 4 MASON COUNTY P IPPIF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL R IARIU I ICIFI I OBLIGATION I ISIIN (PROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN 0 ITOICCI DESCRIPTION OF WORK IRINI I T I L T I F I R ITRI LI IRIDI 1ST 12ND 13RD 14TH I 0 I 0 TRAP I E I 1ST I4TH I I II Al IYIIIYEAR (YEAR (YEAR 15TH I T I C ICAPP I D I THRU ITHRU T I TI SI I INI i I 16TH I A I A IUATA I R I 3RD I6TH Y I YI SI I IGI I I (YEAR I L I L ITIA I L I YEAR (YEAR 21127107197500 BELFAIR-TAHUYA ROAD I IPI 671 9671 I I 10341 10341 I I PE I I I 10.00 TO 1.85 I I MJR CLASS of WK: 15 IR/W I I I IKay's Corner northerly 2.00 miles I I WORK CODES: ABD ICON I I I IHorizontal and Vertical realignment I I TOTAL LENGTH: 2.00 F.A. PROJ NO. I ®I I I I(ID-19 RAP-51) I I UTILITY CODES: - - ITOT 01 0 ------------------------------------------------------------------------------------------------------------------------------------ 22I28I09I39630 NORTH ISLAND DRIVE - 1 I IPI 211 3121 I I 3331 3331 I I PE I I I IMP 0.31 TO 1.31 I I MJR CLASS of WK: 4 IR/W I I I (End of AC north 1 mile I I WORK CODES: ABD ICON I I I IRealign and Regrade I I TOTAL LENGTH: 1.00 F.A. PROJ NO. I ®I I I I(ID-68) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 23I29I08I79800 BEAR CREEK - DEWATTO ROAD - 2 I IPI 211 3121 I I 3331 3331 I I PE I I I 17.45 TO 8.45 I I MJR CLASS of WK: 4 IR/W I I I 10.16 E. Gold Creek Road to 0.37 W. Tiger Mission Road I I WORK CODES: ABC ICON I I I [Realign and Regrade I I TOTAL LENGTH: 1.00 F.A. PROD NO. I -I I I I(ID-40 RAP-57) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 24I79I07INEW ROAD FROM S.R. #3 TO GRAPEVIEW LOOP ROAD I IUI 501 3501 I I 4001 4001 I I PE I I I I I I MJR CLASS of WK: 1 IR/W I I I I.From S.R. #3 east to the Grapeview Loop Road I I WORK CODES: ABD ICON I I I Iat the Cronquist Road I I TOTAL LENGTH: .90 F.A. PROJ NO. I -1 I I I(ID-66) I I UTILITY CODES: - - ITOT 01 0 ------------------------------------------------------------------------------------------------------------------------------------ 25I38I07I91720 JOHNS PRAIRIE ROAD - SR # 3 SIGNALIZATION I IUI 201 1361 I I 1561 1561 I I PE I I I 13.80 TO 3.90 I I MJR CLASS of WK: 6 IR/W I I I (INSTALL TRAFFIC SIGNAL AT JUNCTION WITH SR 3 I I WORK CODES: I ICON I I I I(ID 13) I I TOTAL LENGTH: .10 F.A. PROJ NO. I -1 - I I I I I UTILITY CODES: PT - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 26I21I09I77270 HAVEN WAY - 2 I IN I 201 4241 I 4441 4441 I I PE I I I 10.91 TO 2.30 I I MJR CLASS of WK: 4 IR/W I I I (HAVEN LAKE DRIVE TO END OF AC 1993 PROJECT I I WORK CODES: ABD ICON I I I IRealign and Regrade I I TOTAL LENGTH: 1.39 F.A. PROJ NO. I -I I I I(ID-7 Yr-94) I I UTILITY CODES: PT - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 27I44I08I20900 CRESTVIEW DRIVE I IUI I 791 5891 I 6681 6681 I I PE I I I 10.00 TO 2.02 I I MJR CLASS of WK: 4 IR/W I I I (Agate Store to Hillcrest Drive I I WORK CODES: ABC ICON I I I IRealign and Regrade I I TOTAL LENGTH: 2.02 F.A. PROJ NO. I -I I I ((ID-59 RAP-48) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ s SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1996 TO 2001 Page 5 MASON COUNTY P IPPIF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL R IARIU I ICIFI I OBLIGATION I ISIIN (PROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN 0 ITOICCI DESCRIPTION OF WORK IRINI I T I L T I F I R ITRI LI IRID[ 1ST 12ND 13RD 14TH [ 0 I 0 TRAP I E I 1ST I4TH I I II Al IYIIIYEAR (YEAR IYEAR 15TH I T I C ICAPP I D I THRU ITHRU T I TI SI I INI I I 16TH I A I A IUATA I R I 3RD I6TH Y I YI SI I IGI I I IYEAR I L I L ITIA I L I YEAR IYEAR 28131109162670 ANTHONY ROAD - 1 [ IUI I 471 3541 I 4011 4011 I [ PE I I I 10.00 TO 1.20 I I MJR CLASS of WK: 4 IR/W I I I ISR #3 North 1.20 Miles I I WORK CODES: ABC ICON I I I IRealign and Regrade I I TOTAL LENGTH: 1.20 F.A. PROD NO. I -I - I I I(ID-82) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 29I36IO8I79800 BEAR CREEK - DEWATTO ROAD - 3 I IUI [ 321 3521 I 3841 3841 I I PE I I I 18.45 TO 9.60 I I MJR CLASS of WK: 4 IR/W I I I 10.37 W. of Tiger Mission Road to start of Chip Seal I I WORK CODES: ABC ICON I I I IRealign and Regrade I I TOTAL LENGTH: 1.15 F.A. PROD NO. I -I I I I(ID-38 RAP-54) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 30I34I07I96140-2.45 MCLANE COVE BRIDGE I IUI [ 731 4581 I 5311 5311 I I PE I [ I 12.35 TO 2.55 I I MJR CLASS of WK: 4 IR/W I I I [Replacement of bridge plus new approaches (Realign) I I WORK CODES: L ICON I I I I(ID-15) I I TOTAL LENGTH: .20 F.A. PROD NO. [ ®[ I I I I [ UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 31I37I09I86070 SAND HILL ROAD - 2 I IUI [ 331 3471 I 3801 3801 I [ PE I I [ 12.66 TO 3.94 I I MJR CLASS of WK: 4 IR/W I I I (Transfer Station to Delmore Road I I WORK CODES: ABC ICON I I I IRealign and Regrade I I TOTAL LENGTH: 1.28 F.A. PROJ NO. I -I - I I I(ID-89) I I UTILITY CODES: - - ITOT 01 0 ------------------------------------------------------------------------------------------------------------------------------------ 32I32I09I62670 ANTHONY ROAD - 2 [ IUI I I 471 3541 4011 4011 [ [ PE I I [ 11.20 TO 2.41 I I MJR CLASS of WK: 4 IR/W I .I I (Mile Post 1.20 North to 1993 Project I I WORK CODES: ABC ICON I I I IRealign and Regrade I I TOTAL LENGTH: 1.21 F.A. PROJ NO. I -I - I I I(ID-56) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 33I33I09I11600 STORY ROAD EXTENSION I IUI [ I 881 9001 9881 9881 I I PE I I I (END OF STORY ROAD TO CLOQUALLUM ROAD I I MJR CLASS of WK: 1 IR/W I I I INew construction from end of Story Road to I I WORK CODES: ABD ICON I I I ICloquallun Road to provide access to U.S. #101 I I TOTAL LENGTH: .50 F.A. PROJ NO. I -I I I I(ID-78) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 34I35I09I39630 NORTH ISLAND DRIVE - 2 [ IUI I [ 421 5511 5931 5931 I I PE I [ I 11.31 TO 3.09 I I MJR CLASS of WK: 45 IR/W I I I IRealign and Regrade I I WORK CODES: ABD ICON I I I I(ID-48) I I TOTAL LENGTH: 1.78 F.A. PROJ NO. I ®I s I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1996 TO 2001 Page 6 MASON COUNTY P IPPIF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL R IARIU I ICIFI I OBLIGATION I ISIIN IPROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN 0 ITOICCI DESCRIPTION OF WORK IRINI I T I L I I F I R ITRI LI IRIDI 1ST 12ND 13RD 14TH I 0 I 0 IRAP I E I 1ST I4TH I I II Al IYIIIYEAR IYEAR IYEAR 15TH I T I C ICAPP I D I THRU ITHRU T I TI SI I INI I I 16TH I A I A IUATA I R I 3RD I6TH Y I YI SI I IGI I I IYEAR I L I L ITIA I L I YEAR IYEAR 35I39I08I10000-5.85 ROCK CREEK NO.1 BRIDGE I IUI I I 271 761 1031 1031 I I PE I I I 15.83 TO 5.87 I I MJR CLASS of WK: 4 IR/W I I I IReplacement of Bridge plus new approaches I I WORK CODES: L ICON I I I I(ID-10) I I TOTAL LENGTH: .04 F.A. PROJ NO. I ®I I I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 36I25I08I62310 TRAILS ROAD - 2 I IUI I I 351 3101 3451 3451 I I PE I I I 10.80 TO 1.59 I I MJR CLASS of WK: 4 IR/W I I I IMile post 0.80 to Trails End Drive I I WORK CODES: ABC ICON I I I (Realign and Regrade I ' TOTAL LENGTH: .79 F.A. PROJ NO. I -I I I I(ID-34 RAP-49) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 37I30I09I77270 HAVEN WAY - 1 I IN I I 441 3211 3651 3651 I I PE I I I 10.00 TO 0.91 I I MJR CLASS of WK: 4 IR/W I I I IMt. View Drive Southwesterly to Haven Lake Drive I I WORK CODES: ABD ICON I I I (Realign and Regrade I I TOTAL LENGTH: .91 F.A. PROJ NO. I -1 I I I(ID-23) I I UTILITY CODES: - - ITOT 01 0 ------------------------------------------------------------------------------------------------------------------------------------ 38I40I09I10290-0.35 HLIBOKI BRIDGE I IUI I I 301 1351 1651 1651 I I PE I 1 I 10.30 TO 0.40 (BULB FARM ROAD) I I MJR CLASS of WK: 4 IR/W I I I lRepLacement of Bridge plus new approaches I ' WORK CODES: L ICON I I I I(ID-14) I I TOTAL LENGTH: .10 F.A. PROJ NO. I -1 _ UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------- ---------------------------------------------------------------------- 39141109170950 TAHUYA RIVER ROAD I IUI I I 901 7101 8001 8001 I I PE I I I 11.61 TO 4.02 I I MJR CLASS of WK: 45 IR/W I .I I (Intersection with Belfair-Tahuya Road in Sec. 22 I I WORK CODES: ABC ICON I I I Inortherly 2.41 miles I I TOTAL LENGTH: 2.41 F.A. PROJ NO. I -I - I I I(ID-77 Yr-92) I I UTILITY CODES: - - ITOT 01 0 ------------------------------------------------------------------------------------------------------------------------------------ 40I26I07I96140 GRAPEVIEW LOOP ROAD - 3 I IFI I I 401 2791 3191 361 2831 I PE I I I 13.50 To 4.43 I I MJR CLASS Of WK: 4 RAP IR/W I I I ILombard Road to Store I I WORK CODES: ABD ICON I I I (Realign and Regrade I I TOTAL LENGTH: .93 F.A. PROJ NO. I ®I - I(ID-62 RAP-73) I I UTILITY CODES: - - ITOT 01 0 ------------------------------------------------------------------------------------------------------------------------------------ 41I70I07I96140 GRAPEVIEW LOOP ROAD - 4 I IFI I I 441 4371 4811 741 4071 I PE I I I 14.43 TO 5.90 I I MJR CLASS of WK: 4 RAP IR/W I I I IGrapeview Store to Cronquest Road I I WORK CODES: ABD ICON I I I IRealign and Regrade I I TOTAL LENGTH: 1.47 F.A. PROJ NO. I -1 I I I(ID-63 RAP-61) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1996 TO 2001 Page 7 MASON COUNTY P IPPIF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL R IARIU I ICIFI I OBLIGATION I ISIIN (PROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN 0 ITOICCI DESCRIPTION OF WORK IRINI I T I L T I F I R ITRI LI IRIDI 1ST 12ND 13RD 14TH I 0 I 0 IRAP I E I 1ST I4TH I I I[ Al IYIIIYEAR (YEAR (YEAR 15TH I T I C ICAPP I D I THRU ITHRU T I TI S) I INI I I 16TH I A I A IUATA I R I 3RD I6TH Y I YI SI I IGI I I IYEAR I L I L ITIA I L I YEAR (YEAR 42143117113200 WALKER PARK ROAD I IUI I [ [ 4231 4231 4231 [ [ PE I I I 10.36 TO 1.06 I I MJR CLASS of WK: 4 IR/W I I I IRebuild Road with Curbs, Gutters and Sidewalks I I WORK CODES: BDFG ICON I I I I(ID-16) I I TOTAL LENGTH: .70 F.A. PROJ NO. I -I I I I I I UTILITY CODES: - - ITOT 01 0 ------------------------------------------------------------------------------------------------------------------------------------ 43I45I09I28240 SPENCER LAKE ROAD - 1 [ IUI I I I 6211 6211 6211 I I PE I I I 10.00 TO 1.88 I I MJR CLASS of WK: 4 IR/W I I I (Agate Road north to 1987 project I I WORK CODES: ABC ICON I I I IRealign and Regrade I I TOTAL LENGTH: 1.88 F.A. PROJ NO. I ®[ I I I(ID-28) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 44I46I08I28850 PICKERING ROAD - 4 I IUI I I I 2771 2771 2771 I I PE I I I 14.51 To 5.35 I I MJR CLASS of WK: 4 IR/W I I I [Scenic View Road to Schneider Road I I WORK CODES: ABC ICON I I I IRealign and Regrade I I TOTAL LENGTH: .84 F.A. PROJ NO. I ®[ I I I(ID-84 RAP-30) I I UTILITY CODES: - - [TOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 45I47I09I39410 WINGART ROAD I IUI I [ [ 1711 1711 1711 I I PE I I [ 10.00 TO 0.52 I I MJR CLASS of WK: 4 IR/W I I I [North Island Drive to Jarrell Cove State Park I I WORK CODES: ABC ICON I I I IRealign and Regrade I I TOTAL LENGTH: .52 F.A. PROJ NO. I ®[ I I I(ID-75) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 46I48I07INEW ROAD FROM TRAILS RD TO SR 3 / SR 106 I IUI I I 11600I 16001 16001 [ I PE I I I (APPROXIMATELY 4 MILES I I MJR CLASS of WK: 45 IR/W I i I (Reconstruct the Rasor Road to meet County Standards I I WORK CODES: ABD ICON I I I I(ID-20) I I TOTAL LENGTH: 4.00 F.A. PROJ NO. [ ®[ I I UTILITY CODES: PTC - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 47I71I07I96140 GRAPEVIEW LOOP ROAD - 5 [ IUI I I I 2541 2541 2541 [ I PE I I [ 16.10 TO 6.93 I I MJR CLASS of WK: 4 IR/W I I I ICronquist Road to Nelson Road I I WORK CODES: ABD ICON I I I IRealign and Regrade I I TOTAL LENGTH: .83 F.A. PROJ NO. I -I I I I(ID-64 RAP-39) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 48I42I09I11200 HURLEY-WALDRIP ROAD I IUI I I I 2191 2191 2191 I I PE I I [ 10.00 TO 0.25 I I MJR CLASS of WK: 4 IR/W I I I (Intersection With SR #108 Realign and Regrade I I WORK CODES: ABC ICON I I I I(ID-24 Yr-92) I I TOTAL LENGTH: .25 F.A. PROJ NO. I -I I I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1996 TO 2001 Page 8 MASON COUNTY P (PPIF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL R IARIU I ICIFI I OBLIGATION I ISIIN IPROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN 0 ITOICCI DESCRIPTION OF WORK IRINI I T I L I I F I R ITRI LI IRIDI 1ST 12ND 13RD 14TH I 0 I 0 IRAP I E I 1ST I4TH I I II Al IYIIIYEAR IYEAR IYEAR 15TH I T I C [CAPP I D I THRU ITHRU T I TI SI I INI I I 16TH I A I A IUATA I R I 3RD I6TH Y I YI SI I IGI I I IYEAR I L I L ITIA I L I YEAR IYEAR 49151109102750 STAR LAKE ROAD I IUI I I I 4111 4111 4111 I I PE I I I 10.00 TO 1.10 I I MJR CLASS of WK: 3 IR/W I I I ICloquallum Road north 1.10 miles to Country Club I I WORK CODES: ABC ICON I I I IRegrade, drain and surface I I TOTAL LENGTH: 1.10 F.A. PROD NO. I -I I I I (ID-71) I I UTILITY CODES: - - [TOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 50[52[09[05850 GALLAGHER ROAD I IUI I I I 3331 3331 3331 I I PE I I I 10.00 TO 1.88 [ I MJR CLASS of WK: 4 IR/W I I I IMinor widening and surfacing [ I WORK CODES: ABC ICON I I I I(ID-22 Yr-92) [ I TOTAL LENGTH: 1.88 F.A. PROJ NO. I ®I I I I [ I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 51I53I09I23600 SUNSET ROAD I IUI I I I 3121 3121 3121 I I PE I I I 10.00 TO 1.39 [ [ MJR CLASS of WK: 4 IR/W I I I IMinor Widening and BST surfacing [ I WORK CODES: ABC ICON I I I I(ID-27 Yr-92) [ I TOTAL LENGTH: 1.39 F.A. PROD NO. I -) I I I [ I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 52I54I09I28240 SPENCER LAKE ROAD - 2 I IUI I I I 1091 1091 1091 I I PE I I I 12.45 TO 2.78 [ [ MJR CLASS of WK: 4 IR/W I I I IFrom 1987 project north to Pickering Road I I WORK CODES: ABC ICON I I I IRealign and Regrade I I TOTAL LENGTH: .33 F.A. PROD NO. I ®I I I I(ID-30) I [ UTILITY CODES: - - [TOT 01 0 ------------------------------------------------------------------------------------------------------------------------------------ 53I55I09[28370 CLAY ROAD I IUI I I I 1791 1791 1791 I I PE I I I 10.99 TO 1.53 I I MJR CLASS of WK: 3 IR/W I .I I IPhillips Lake Loop Road to Dead End I I WORK CODES: ABC ICON I I I IRegrade, drain and surface I [ TOTAL LENGTH: .54 F.A. PROD NO. I -I - I I I(ID-72) I I UTILITY CODES: - - ITOT 01 0 ------------------------------------------------------------------------------------------------------------------------------------ 54I56I08[28850 PICKERING ROAD - 5 I IUI I I I 3151 3151 3151 I I PE I I I 15.35 TO 6.24 I [ MJR CLASS of WK: 4 IR/W I I I (Schneider Road to Benson Loop Road I I WORK CODES: ABC ICON [ I I IRealign and Regrade I I TOTAL LENGTH: .89 F.A. PROD NO. I ®I I I I(ID-85 RAP-36) I I UTILITY CODES: - - ITOT 01 0 ------------------------------------------------------------------------------------------------------------------------------------ 55I57I09[36360 MCMICKEN ROAD I IUI I I I 2061 2061 2061 I I PE I I I 10.00 TO 0.62 I I MJR CLASS of WK: 4 IR/W I I I IMinor widening and resurfacing I I WORK CODES: ABC ICON I I I I(ID-49 Yr-92) I I TOTAL LENGTH: .62 F.A. PROD NO. I -I - I I I I I UTILITY CODES: - - ITOT 01 0 ------------------------------------------------------------------------------------------------------------------------------------ SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1996 TO 2001 Page 9 MASON COUNTY P IPPIF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL R (ARIU I ICIFI I OBLIGATION I ISIIN (PROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN 0 ITOICCI DESCRIPTION OF WORK IRINI I T I L T I F I R ITRI LI IRIDI 1ST 12ND 13RD 14TH [ 0 I 0 [RAP I E I 1ST I4TH I I II AI IYIIIYEAR [YEAR (YEAR 15TH I T I C ICAPP I D I THRU ITHRU T I TI SI I IN[ I I 16TH I A I A IUATA I R I 3RD I6TH Y I Y[ SI I IGI I I IYEAR I L I L ITIA I L I YEAR (YEAR 56158109147100 TERRACE ROAD I IUI I [ I 2351 2351 2351 I I PE I I I I I I MJR CLASS of WK: 1 IR/W I I I (Intersection Project with U.S. #101 from plats of I I WORK CODES: ABC ICON I I I (Canal View Terrace and White Star. I I TOTAL LENGTH: .07 F.A. PROJ NO. I ®[ I I I(ID-76) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 57I59I09[51930 JENSEN ROAD I IUI I I I 1611 1611 1611 I I PE I I I I0.001TO 0.48 I I MJR CLASS of WK: 4 IR/W I I I IBROCKDALE ROAD TO END OF COUNTY ROAD [ [ WORK CODES: ABC ICON I I I IRealign and Regrade [ [ TOTAL LENGTH: .48 F.A. PROJ NO. I ®I I I I(ID-87) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 58I60I09I64330 STRETCH ISLAND ROAD SOUTH I IUI I I I 2461 2461 2461 I I PE I I I 10.00 TO 0.74 I I MJR CLASS of WK: 4 IR/W I I I (Minor Widening and surfacing I I WORK CODES: ABC ICON I I I I(ID-25 Yr-92) I I TOTAL LENGTH: .74 F.A. PROJ NO. I ®[ I I I [ I UTILITY CODES: - - ITOT O[ 0 ------------------------------------------------------------------------------------------------------------------------------------ 59I61I09I64500 ECKERT ROAD I IUI I I [ 2771 2771 2771 I [ PE I I I 10.00 TO 0.84 I I MJR CLASS of WK: 4 IR/W I I I [Minor widening and surfacing I I WORK CODES: ABC ICON I I I I(ID-26 Yr-92) I I TOTAL LENGTH: .84 F.A. PROJ NO. I ®[ I I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 60I62I09I67580 LAKELAND DRIVE I IUI I [ I 891 891 891 I I PE I I I 10.15 TO 0.22 CROWN OF HILL I I MJR CLASS of WK: 4 IR/W [ .I I (Reconstruct Vertical Curve to Improve Sight Distance I I WORK CODES: ABC ICON I I I I(ID-74) I I TOTAL LENGTH: .07 F.A. PROJ NO. I _I - I I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 61I63I08I70390 NORTH SHORE ROAD I IUI I I [ 3331 3331 3331 I I PE I I I 19.63 TO 10.63 I I MJR CLASS of WK: 4 IR/W I I I IMile Post 9.63 to Belfair Tahuya Road I I WORK CODES: ABD ICON I I I (Realign and Regrade [ I TOTAL LENGTH: 1.00 F.A. PROJ NO. I _[ I I I(ID-37 RAP-51) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 62I64I08I79800 BEAR CREEK - DEWATTO ROAD - 4 I IUI I I I 3091 3091 3091 I [ PE I I I 19.75 TO 10.68 I I MJR CLASS of WK: 4 IR/W I I I [West end of Chip Seal to Old Belfair Highway I I WORK CODES: ABC ICON I I I IRealign and Regrade I I TOTAL LENGTH: .93 F.A. PROJ NO. I ®i I I I(ID-41 RAP-49) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1996 TO 2001 Page 10 MASON COUNTY P IPPIF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL R IARIU I ICIF[ ' OBLIGATION I ISIIN IPROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- ' PLAN 0 ITOICCI DESCRIPTION OF WORK IRINI I T I L I I F I R ITRI LI IRINI 1ST 12ND 13RD 14TH I 0 I 0 IRAP I E I 1ST I4TH I I II Al (YIIIYEAR IYEAR (YEAR 15TH I T I C ICAPP I D I THRU ITHRU T I TI SI I [NJ I I 16TH I A I A IUATA I R I 3RD I6TH Y I YI SI I IGI I I IYEAR I L I L ITIA I L I YEAR IYEAR 63165108180610 ELFENDAHL PASS ROAD I Jul I I I 6161 6161 6161 I I PE I I I 10.00 TO 1.85 I I MJR CLASS of WK: 4 IR/W I I I (North Shore Road to Belfair Tahuya Road I I WORK CODES: ABC ICON I I I (Realign and Regrade I ' TOTAL LENGTH: 1.85 F.A. PROJ NO. I -1 I I I(ID-86 RAP-36) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 64I66I09I86070 SAND HILL ROAD - 3 I Jul I I I 6241 6241 6241 I I PE I I I 13.94 TO 5.82 I I MJR CLASS of WK: 4 IR/W I I I IDelmore Road to Bear Creek - Dewatto Road I I WORK CODES: ABC ICON I I I IRealign and Regrade I I TOTAL LENGTH: 1.88 F.A. PROD NO. I ®I _ I I I(ID-90) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 65I67I14I90100 SHELTON - MATLOCK ROAD I Jul I I I 7921 7921 7921 I I PE I I I 10.91 TO 1.38 I I MJR CLASS of WK: 3 IR/W I I I (City Limits to Goldsborough Bridge ( I WORK CODES: ABD ICON I I I (Minor Widening I I TOTAL LENGTH: .47 F.A. PROD NO. I -1 I I I(ID-42 RAP-48) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 66I68I08I91720 JOHN'S PRAIRIE ROAD -2 I Jul I I I 4411 4411 4411 I I PE I I I 13.42 TO 3.90 I I MJR CLASS of WK: 1 IR/W I I I (Capitol Hill Road to S.R. #3 I I WORK CODES: ABD ICON I I I [New Construction on New Alignment I I TOTAL LENGTH: .48 F.A. PROJ NO. I eI I I I(ID-58) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------ ----------------------------------------------------------------------------- 67149107196140 GRAPEVIEW LOOP ROAD - 2 I Jul I I I 3151 3151 3151 I I PE I I I 12.78 TO 3.50 I I MJR CLASS of WK: 4 IR/W I I I (Murray Road South to Lombard Road I I WORK CODES: ABD ICON I I I IRealign and Regrade I I TOTAL LENGTH: .72 F.A. PROJ NO. I -I I I I(ID-61 RAP-58) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 68I72I09I04670 LITTLE EGYPT ROAD I Jul I I I 6661 6661 6661 I I PE I I I 10.00 TO 2.00 I I MJR CLASS of WK: 3 IR/W I I I (Shelton-Matlock Road south to 2.00 Mile Post I I WORK CODES: ABC ICON I I I IRegrade, drain and surface I I TOTAL LENGTH: 2.00 F.A. PROJ NO. I -I I I I (ID-70) I I UTILITY CODES: - - [TOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 69I69I07I96140 GRAPEVIEW LOOP ROAD - 1 I Jul I I I 3861 3861 3861 I I PE I I I 11.62 TO 2.78 [ I MJR CLASS of WK: 4 IR/W I I I (Stadium Beach Road to Murray Road South I I WORK CODES: ABD ICON I I I IRealign and Regrade I I TOTAL LENGTH: 1.16 F.A. PROD NO. I -I - I I I(ID-60 RAP-40) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1996 TO 2001 Page 11 MASON COUNTY P IPPIF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL R IARIU I ICIFI I OBLIGATION I ISIIN (PROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN 0 ITOICCI DESCRIPTION OF WORK [RINI I T I L I I F I R ITRI LI IRIDI 1ST 12ND 13RD 14TH I 0 I 0 TRAP I E I 1ST I4TH I I I) Al IYIIIYEAR IYEAR IYEAR 15TH I T I C ICAPP I D I THRU ITHRU T I TI SI I INI I I 16TH I A I A IUATA I R I 3RD I6TH Y I YI SI I IGI I I IYEAR I L I L ITIA I L I YEAR IYEAR 70I73100INEW ROAD FROM SOUTH ISLAND DR. TO HARTSTENE IS.NO. RD I [UI I [ [ 6301 6301 6301 [ [ PE I I I I I I MJR CLASS of WK: 1 IR/W I I I IA New Road from South Island Drive easterly to I I WORK CODES: ABC ICON I I i IHartstene Island North Road- Follows No. Line of I I TOTAL LENGTH: 1.62 F.A. PROJ NO. [ ®I [ I ISec. 11 (ID-18) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 71I74100INEW RD CONNECTING TAHUYA RIVER DR & TAHUYA RIVER RD I IUI I I I 5731 5731 5731 I [ PE I I I I I I MJR CLASS of WK: 1 IR/W I I I (Extend Tahuya River Drive (7521) Approx. 1.3 miles to I I WORK CODES: ABD ICON I I I (intersect Tahuya River Road (7095) i I TOTAL LENGTH: 1.30 F.A. PROJ NO. [ -I I I I(ID-31 Yr-92) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 72I75IOOINEW ROAD FROM S.R. #101 TO BROCKDALE ROAD I IUI I [ [ 7441 7441 7441 [ I PE I I I I I I MJR CLASS of WK: 1 IR/W I I I (A New Road from S.R. #102 east to McEwan Prairie Road I I WORK CODES: ABD ICON I I I ITo provide a direct route from #101 to the Mason Lake I I TOTAL LENGTH: 2.00 F.A. PROJ NO. I —1 I I (area. A bypass of the City of Shelton (ID-65). I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 73I76100INEW ROAD FROM JOHN'S PRAIRIE ROAD TO MASON LAKE ROAD I IUI I I [ 4421 4421 4421 [ I PE I I I I I I MJR CLASS of WK: 1 IR/W I [ [ 10.30 miles east of railroad tracks on John's Prairie I I WORK CODES: ABD ICON I I I IRoad to area of Mikkelsen Road on Mason Lake Road I I TOTAL LENGTH: 1.00 F.A. PROJ NO. I -1 I I I(ID-67) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 74I77I00INEW ROAD CONNECTING BINNS SWIGGER LOOP & PHILLIPS RD I IUI I [ I 5741 5741 5741 I [ PE I I I IAPPROX. 1.3 MILES + BRIDGE I I MJR CLASS of WK: 1 IR/W I i [ 11.3 miles of New Construction I I WORK CODES: ICON I I I I(ID-32 Yr-92) I I TOTAL LENGTH: 1.30 F.A. PROJ NO. I —1 I I I I [ UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 75I78I00INEW ROAD FROM MASON LAKE ROAD SOUTHEASTERLY TO I IUI I [ [ 7441 7441 7441 [ [ PE I I I [PICKERING ROAD I I MJR CLASS of WK: 1 IR/W I I I INew Road from Mason Lake Road Southeasterly I I WORK CODES: ABDLI ICON I I I Ito SR-3 at the Pickering Road I I TOTAL LENGTH: 2.20 F.A. PROJ NO. I ®I I I ((ID-92) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 76I80100INEW ROAD MCREAVY TO MASON LAKE ROAD I IUI I [ 11664I 16641 16641 I [ PE I I I IAPPROX. 5 MILES I I MJR CLASS of WK: 1 IR/W I I i (Construct Approx. 5.0 miles of new Road from 2 miles I I WORK CODES: ABD ICON I [ [ [North of Webb Hill Rd to 1/2 mi. North of Simpson I I TOTAL LENGTH: 5.00 F.A. PROJ NO. I —1 [ [ [Recreation Area (ID-55 Yr-92) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1996 TO 2001 Page 12 MASON COUNTY P IPPIF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL R IARIU I ICIFI I OBLIGATION I ISIIN IPROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN 0 ITOICCI DESCRIPTION OF WORK IRINI I T I L I I F I R ITRI LI IRINI 1ST 12ND 13RD 14TH I 0 I 0 IRAP I E I 1ST I4TH I I II Al IYIIIYEAR IYEAR IYEAR 15TH I T I C ICAPP I D I THRU ITHRU T I TI SI I INI I I 16TH I A I A IUATA I R I 3RD I6TH Y I YI SI I IGI I I IYEAR I L I L ITIA I L I YEAR IYEAR 77I82I00INEW FRONTAGE ROADS FOR NEW STATE BELFAIR BY-PASS ROUT I IUI I I I 421 421 421 I I PE I I I (APPROXIMATELY 3 MILES OF NEW ROADS I I MJR CLASS of WK: 1 IR/W I I I ISTUDY TO DETERMINE LOCATIONS FOR NEW FRONTAGE ROAD I I WORK CODES: U ICON I I I IREQUIREMENTS FOR A NEW STATE ROUTE BY-PASSING BELFAIR I I TOTAL LENGTH: 3.00 F.A. PROJ NO. I -I I I ION THE EAST (ID-17) I ( UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 78I81100INEW ROAD FROM TWANOH FALLS PLAT EAST TO TRAIL ROAD I IUI I I I 6611 6611 6611 I I PE I I I IAPPROX. 1.5 MILES I I MJR CLASS of WK: 1 IR/W I I I (Construct appoximatLy 1.5 miles of new road I I WORK CODES: ABD ICON I I I I(ID 94 YR 92) I I TOTAL LENGTH: 1.50 F.A. PROD NO. I ®I I I I I ' UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 79I--I09I14010 OLD OLYMPIC HWY I IUI I I 11200I 12001 12001 I I PE I I I 10.00 TO 1.50 I I MJR CLASS of WK: 4 IR/W I I I ISR 101 to Bloomfield Road I I WORK CODES: ABD ICON I I i IReaLign and Regrade I I TOTAL LENGTH: 1.50 F.A. PROJ NO. 1 -I I I I(ID-96) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1996 TO 2001 Page 13 MASON COUNTY I I I SUMMARY OF COSTS BY FUNDING CATEGORY EXPENDITURE PLAN FUNDING PLAN FEDERAL OBLIGATION PLAN I I I FUNDED PROJECTS I 1st Year 4233 I Local 7074 I Years 1-3 Years 4-6 Totals I 2nd Year 1105 I RAP 1517 I P E 88 0 88 I 3rd Year 1098 I CAPP 1416 I R/W 0 0 0 I 4-6 Year 3758 I TIA 0 I CONST 0 0 0 UATA 0 I Fed. 187 I I I I Totals ... 10194 10194 88 0 88 ------------------------------------------------------------------------------------------------------------------------------------ UNFUNDED PROJECTS I 1st Year 1093 I Local 28253 I Years 1-3 Years 4-6 Totals (Proposed and Unknown) I 2nd Year 2682 I RAP 0 I P E 0 0 0 I 3rd Year 2927 ( CAPP 0 I R/W 0 0 0 I 4-6 Year 21551 I TIA 0 I CONST 0 0 0 UATA 0 I Fed. 0 I I I I Totals ... 28253 28253 0 0 0 ------------------------------------------------------------------------------------------------------------------------------------ TOTAL ALL PROJECTS I 1st Year 5326 I Local 35327 I Years 1-3 Years 4-6 Totals I 2nd Year 3787 I RAP 1517 I P E 88 0 88 I 3rd Year 4025 I CAPP 1416 I R/W 0 0 0 I 4-6 Year 25309 I TIA 0 I CONST 0 0 0 UATA 0 I Fed. 187 I I I I Totals ... 38447 38447 88 0 88 WHEREAS, in compliance with R.C.W. 36.81.121 and W.A.C. 136-14, the Board of Mason County Commissioners hereby certifies that a priority array of potential projects on this County's arterial system was prepared by the County Engineer and available to the Board of County Commissioners during the preparation of a proposed six (6) year comprehensive road construction program for the period January 1, 1996, through December 31, 2001; and, WHEREAS, in further compliance with said law, the Board has held thereon public hearing(s) dated June 27, 1995, to consider same. NOW,THEREFORE,BE IT HEREBY RESOLVED by the Board of Mason County Commissioners,in regular session assembled,that this Six(6)Year Construction Program for Mason County roads be adopted as set forth in detail, for the period mentioned, consisting of pages numbered 1 through 13, which are incorporated and made part of this Resolution. PASSED and unanimously adopted this 11th day of July, 1995. BOARD OF COUNTY COMMISSION S MASON COUNTY, WASHINGTO ATTEST: 4 Chairperson Clerk of the Board 141 hr- Mem r 1 cc: Cmmrs. I Eng'r. I CRAB Urban Arterial Board Member . Dept. of Transp.ILocal Programs Div. h:lwplmaintlsix-yr.sig