Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
117-97 - Res.Six Year Transportation Improvement Program for 1998 through 2003
RESOLUTION NO. 11-97 Six Year Transportation Improvement Program WHEREAS, in compliance with W.A.C. 136-15 Mason County has prepared the attached Six Year Transportation Improvement Program for the period January 1, 1998,through December 31,2003;and, WHEREAS,in compliance with R.C.W. 36.81.121 and W.A.C. 136-14,the Board of Mason County Commissioners hereby certifies that the priority array of potential projects on this County's road system, including bridges, was prepared by the County Commissioners during the preparation of the said Six Year Transportation Improvement Program;and WHEREAS, in further compliance with said law, the Board of County Commissioners has held a public hearing on this 30th day of September, 1997; NOW, THEREFORE, BE IT RESOLVED by the Board of Mason County Commissioners, in regular session assembled, that the attached Six Year Transportation Improvement Program for 1998 through 2003, be adopted, for the period mentioned, consisting of pages numbered. 1 through 6, which are hereby incorporated and made part of this Resolution. BE IT FURTHER RESOLVED that the County Engineer is hereby directed to distribute copies of the Six Year Transportation Improvement Program for 1998-2003 to all required agencies. ADOPTED this 30th day of September, 1997. BOARD OF COUNTY COMMISSIONERS MASON COUNTY,WASHINGTON MARY JO CADY, Chairperson JOHN A. BOLENDER, Commissioner ATTEST: 9 �0 !v C A D. OLSEN, Commissioner REB C,CLA ES. AOGERS Clerk of the Board APPROVED AS TO FORM: DrA MICHAEL CLIFT Deputy Prosecuting Attorney cc: Cmmr. Public Works General Services County Road Admin.Board WSDOT/TransAid C:\WPWIN\FILES\RESOLUn6YEAR-98.DOC 98.DOC Mason County Six Year Transportation Improvement Program Information Key Heading Title Title and effective dates County Number OFM assigned number(LAG Appendix 21.37) Hearing Date Date of public hearing to consider adoption of TIP Adoption Date Date this program was adopted by commission. Resolution Number . Legislative Authority resolution number Column Number 1. Priority. Number indicating the project relative priority for completion. 2. Funct Class. Functional Classification. two digit code denoting federal functional classification. Rural Urban 01 Interstate 11 Interstate 02 Principal Arterial 12 Freeways&Expressways 06 Minor Arterial 14 Other Principal Arterials 07 Principal Collector 16 Minor Arterials 08 Minor Collector 17 Collectors 09 Local Access 19 Local Access 3, Project Identification. Road number,Project Title,Mile Posts,Location description,Work planned,(ID and RAP#) 4. Carry. Indicates if this is a carry over project where construction began in the previous year. 5. Funding. Indicates if specific funding has been earmarked for project. F=funded P=planned U=unfunded 6. Expenditure Plan. Estimated expenditures in thousands by year. 7. Source. Specifies source of project funding:Local,State,or Federal. State Sources: RAP Rural Arterial Program CAPP County Arterial Preservation Program UATA Urban Arterial Trust Account TIA Transportation Improvement Account 8. Federal Obligation Plan. Estimated expenditures in thousands by time frame for: PE=Preliminary Engineering R/W=Right of Way CON=Construction 9. MJR Class of Work. 1 New construction or realignment 7 Capitol Purchase 2 Major widening 8 Non capitol improvements 3 Minor widening 9 Non motor vehicle use 4 Rehabilitation/Reconstruction 10 Transit Capitol Project 5 Resurfacing 11 Transit Operating Project 6 Traffic Control 12 Transit Planning Project 10. Work Codes. Designates the types of work planned for the project A Grading G Sidewalks B Draining 1 Signalization C Light Bituminous Surface J Lighting D A.C. or P.C.C.Pavement L Bridge F Curbs& Gutters 0 Bikeways 11. Total Length. Project length to the nearest hundredth mile. 12. Utility codes. Utilities that are expected to be impacted by the construction project. C Cable TV T Telephone S Sewer(non agency owned) P Power G Gas W Water 0 Other 13, F.A.Proj No. Federal Project Number;composed of three parts-Federal Program,Route number,and sequencer digit. Federal Program Source Codes STP© STP Statewide Competitive S 18 FTA Rural Areas STP(E) STP Transportation Enhancements S3 FTA Discretionary STP(S) STP Safety including Hazard&RR STP(R) STP Rural regionally selected STP(U) STP Urban regionally selected SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1998 TO 2003 MASON COUNTY HEARING DATE : 09/30/97 ADOPTION DATE: 09/30/97 COUNTY NO: 23 RESOLUTION NO: Ear -97 r P IF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL R IU I ICIFI I OBLIGATION I IN (PROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN 0 ICCI DESCRIPTION OF WORK IRINI I T I L I I F I R ITLI IRINI 1ST 12ND 13RD 14TH I 0 I 0 IRAP I E I 1ST I4TH I I Al IYIIIYEAR IYEAR IYEAR 15TH I T I C ICAPP I D I THRU ITHRU T I SI I INI I I 16TH I A I A IUATA I R I 3RD I6TH Y I SI I IGI I I IYEAR I L I L ITIA I L I YEAR IYEAR 11 ICOUNTY WIDE PAVEMENT ON AC PAVEMENT I IFI 2751 2871 3001 9851 18471 9131 9341 I PE I I I I I MJR CLASS of WK: 5 CAPP IR/W I I(ID-1) I I WORK CODES: BD ICON I TOTAL LENGTH: F.A. PROJ NO. I -I - I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 2I ICOUNTY WIDE AC PAVEMENT ON BST PAVEMENT I IFI 1561 1631 1701 5581 10471 5231 5241 I PE I I I I I MJR CLASS of WK: 5 CAPP IR/W I I(ID-2) I I WORK CODES: ICON I I I I I TOTAL LENGTH: F.A. PROJ NO. I _I I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 3I ICOUNTY WIDE BST PAVEMENT ON GRAVEL I IFI 1451 3421 3581 11721 20171 20171 I I PE I I I I I MJR CLASS of WK: 4 IR/W I I I(ID-3) I I WORK CODES: ABC ICON I I I I I TOTAL LENGTH: F.A. PROD NO. I -I - I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 4I ICOUNTY WIDE SAFETY PROJECTS I IFI 3021 3161 3301 10811 20291 20291 I I PE I I I I I MJR CLASS of WK: IR/W I I IIncludes traffic control, drainage, walks, I I WORK CODES: ABHKO ICON I I Ibikeways and guardrails I I TOTAL LENGTH: F.A. PROJ NO. I -I - I (Projects off roadway surfaces (ID-4) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 5I ICOUNTY WIDE MINOR CONSTRUCTION I IFI 1651 1721 1801 5911 11081 11081 I I PE I I I I I MJR CLASS of WK: IR/W I I (Reconstruction of sub-base and resurfacing I I WORK CODES: ABC ICON I I (Intersections - sight distance improvements I I TOTAL LENGTH: F.A. PROJ NO. I _I - I I(ID-5) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 6I ICOUNTY WIDE BRIDGE & LARGE CULVERT CONSTRUCTION I IFI 3361 3511 3671 12031 22571 22571 I I PE I I I I I MJR CLASS of WK: 4 IR/W I I(ID-6) I I WORK CODES: L ICON I I I TOTAL LENGTH: F.A. PROJ NO. I _ I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1998 TO 2003 Page 2 MASON COUNTY ------------------------------------------------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------------------------------------------------ P IF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL R IU I ICIFI I OBLIGATION I IN IPROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN 0 ICCI DESCRIPTION OF WORK IRINI I T I L I I F I R ITLI IRIDI 1ST 12ND 13RD 14TH I 0 I 0 IRAP I E I 1ST I4TH I I Al IYIIIYEAR IYEAR IYEAR 15TH I T I C ICAPP I D I THRU ITHRU T I SI I INI I I 16TH I A I A IUATA I R I 3RD I6TH Y I SI I IGI I I IYEAR I L I L ITIA I L I YEAR IYEAR 7108115500 LYNCH ROAD - 3 I IFI 10451 I I I 10451 10451 I I PE I I 14.95 TO 6.85 I I MJR CLASS of WK: 4 IR/W I I 10.30 North of Bay East to Totten Shores I I WORK CODES: ABD ICON I I IRealign and Regrade I I TOTAL LENGTH: 1.90 F.A. PROJ NO. I -I - I I(ID-45 RAP-49) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 8I08I15500 LYNCH ROAD - 4 I IFI 11001 I I I 11001 11001 I I PE I I 16.85 TO 8.85 I I MJR CLASS of WK: 4 IR/W I I (Totten Shores Road to Arcadia Road I I WORK CODES: ABC ICON I I IRealign and Regrade I I TOTAL LENGTH: 2.00 F.A. PROJ NO. I -I - I I(ID-52 RAP-31) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 9I07I"101 CONNECTOR" STUDY I IFI 9251 8001 I I 17251 17251 I I PE I I IBROCKDALE RD TO SR 3 (VICINITY OF E MASON/KITSAP LINE) I I MJR CLASS of WK: 1 IR/W I I IEIS and feasibility study for an overland route along I I WORK CODES: U ICON I I Ithe north ridge paralleling SR 106. Approx 25 miles . I I TOTAL LENGTH: 25.00 F.A. PROJ NO. I -I - I(ID-97) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 10I08I20900 CRESTVIEW DRIVE I IPI 1101 10011 I I 11111 11111 I I PE I I 10.00 TO 2.02 I I MJR CLASS of WK: 4 IR/W I I IAgate Store to Hillcrest Drive I I WORK CODES: ABC ICON I I IRealign and Regrade I I TOTAL LENGTH: 2.02 F.A. PROJ NO. I -I - I I(ID-59 RAP-48) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 11I07I97500 BELFAIR TAHUYA RD -2 I IFI 611 5481 I I 6091 4851 I 1241 PE 1241 I 16.40 TO 7.26 I I MJR CLASS of WK: 4 IR/W I I ICOIIins Lake Rd to New ACP I I WORK CODES: ABC ICON I I IRealign and Regrade I I TOTAL LENGTH: .86 F.A. PROJ NO. I -i I(ID-8) I I UTILITY CODES: - - ITOT 1241 0 ------------------------------------------------------------------------------------------------------------------------------------ 12I08I10000 CLOQUALLUM ROAD - 1 I IFI 751 6161 I I 6911 5911 I 1001 PE I I 111.75 TO 12.47 I I MJR CLASS of WK: 4 IR/W I I IRock Bluff Curve (1 mile west of Bulb Farm Road) I I WORK CODES: ABD ICON 1001 I IRealign (Relax Curve) I I TOTAL LENGTH: .72 F.A. PROD NO. I -I - I I(ID-51 RAP-41) I I UTILITY CODES: - - ITOT 1001 0 ------------------------------------------------------------------------------------------------------------------------------------ 13I08I28850 PICKERING ROAD - 3 I IPI 1041 501 8911 I 10451 10451 I I PE I I 13.41 TO 4.51 I I MJR CLASS of WK: 4 IR/W I I IHartstene Bridge Road South to Scenic View Road I I WORK CODES: ABC ICON I I IRealign and Regrade I I TOTAL LENGTH: 1.10 F.A. PROJ NO. I -I - I I(ID-47 RAP-42) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1998 TO 2003 Page 3 MASON COUNTY P IF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL R IU I ICIFI I OBLIGATION I IN IPROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN 0 ICCI DESCRIPTION OF WORK IRINI I T I L I I F I R ITLI IRIDI 1ST 12ND 13RD 14TH I 0 I 0 IRAP I E I 1ST I4TH I I Al IYIIIYEAR IYEAR IYEAR 15TH I T I C ICAPP I D I THRU ITHRU T I S I I INI I I 16TH I A I A IUATA I R I 3RD I6TH Y I SI I IGI I I IYEAR I L I L ITIA I L I YEAR IYEAR 14108162310 TRAILS ROAD - 2 I IUI I 431 3921 I 4351 4351 I I PE I 10.80 TO 1.59 I I MJR CLASS of WK: 4 IR/W I I IMile post 0.80 to Trails End Drive I I WORK CODES: ABC ICON I IRealign and Regrade I I TOTAL LENGTH: .79 F.A. PROJ NO. I _I I I(ID-34 RAP-49) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 15I09I14010 OLD OLYMPIC HWY I IUI I 821 7431 I 8251 8251 I I PE I I 10.00 TO 1.50 I I MJR CLASS of WK: 4 IR/W I ISR 101 to Bloomfield Road I I WORK CODES: ABD ICON I IRealign and Regrade I I TOTAL LENGTH: 1.50 F.A. PROJ NO. I I I(ID-96) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 16I08I79800 BEAR CREEK - DEWATTO ROAD - 3 I IUI I 631 5701 I 6331 6331 I I PE I I 18.45 TO 9.60 I I MJR CLASS of WK: 4 IR/W I I 10.37 W. of Tiger Mission Road to start of Chip Seal I I WORK CODES: ABC ICON I I IRealign and Regrade I I TOTAL LENGTH: 1.15 F.A. PROJ NO. I _I _ I I(ID-38 RAP-54) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 17IO8I10000-5.85 ROCK CREEK NO.1 BRIDGE I IUI I 331 1041 I 1371 1371 I I PE I 15.83 TO 5.87 I I MJR CLASS of WK: 4 IR/W I I (Replacement of Bridge plus new approaches I I WORK CODES: L ICON I(ID-10) I I TOTAL LENGTH: .04 F.A. PROD NO. I ®I _ I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 18I07INEW ROAD FROM SR 3 TO GRAPEVIEW LOOP ROAD I IUI I 681 4001 10001 14681 14681 I I PE I I I I I MJR CLASS of WK: 1 IR/W I I (From SR 3 East to Grapeview Loop Rd I I WORK CODES: ABD ICON I I Inear the Cronquist Rd I I TOTAL LENGTH: 1.50 F.A. PROJ NO. I -I - I I(ID-66) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 19I14I90100 SHELTON - MATLOCK ROAD I IUI I 851 8631 I 9481 9481 I I PE I I 10.91 TO 1.38 I I MJR CLASS of WK: 3 IR/W I I (City Limits to Goldsborough Bridge I I WORK CODES: ABD ICON I I IMinor Widening I I TOTAL LENGTH: .47 F.A. PROJ NO. I _I I I(ID-42 RAP-48) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 20I07I96140-2.45 MCLANE COVE BRIDGE I IFI I I 671 6081 6751 5551 I 1201 PE I 120 I 12.15 TO 2.55 I I MJR CLASS of WK: 4 IR/W I I (Replacement of bridge plus new approaches (Realign) I I WORK CODES: L ICON I I I(ID-15) I I TOTAL LENGTH: .40 F.A. PROJ NO. I _I I I I I UTILITY CODES: - - ITOT 01 120 ------------------------------------------------------------------------------------------------------------------------------------ SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1998 TO 2003 Page 4 MASON COUNTY P IF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL R IU I ICIFI I OBLIGATION I IN IPROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN 0 ICCI DESCRIPTION OF WORK IRINI I T I L I I F I R ITLI IRINI 1ST 12ND 13RD 14TH I 0 I 0 IRAP I E I 1ST I4TH I I Al IYIIIYEAR IYEAR IYEAR 15TH I T I C ICAPP I D I THRU ITHRU T I SI I INI I I 16TH I A I A IUATA I R I 3RD I6TH Y I SI I IGI I I IYEAR I L I L ITIA I L I YEAR IYEAR 21108179800 BEAR CREEK - DEWATTO ROAD - 4 I IUI I I 511 4601 5111 5111 I I PE I I I9.75 TO 10.68 I I MJR CLASS of WK: 4 IR/W I (West end of Chip Seal to Old Belfair Highway I I WORK CODES: ABC ICON I I (Realign and Regrade I I TOTAL LENGTH: .93 F.A. PROJ NO. I -I I I(ID-41 RAP-49) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 22I07I91720 JOHN-S PRAIRIE RD I IUI I I 511 4611 5121 5121 I I PE I I 12.73 TO 3.66 I I MJR CLASS of WK: 1 IR/W I I IRR crossing to Lower Gravel Pit I I WORK CODES: ABD ICON I I IRealign and Regrade I I TOTAL LENGTH: .93 F.A. PROJ NO. I -I I(ID-98) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 23I08I28850 PICKERING ROAD - 4 I IUI I I 801 7181 7981 7981 I I PE I I 14.51 TO 5.35 I I MJR CLASS of WK: 4 IR/W I I IScenic View Road to Schneider Road I I WORK CODES: ABC ICON I I IRealign and Regrade I I TOTAL LENGTH: .84 F.A. PROJ NO. I -I - I I(ID-84 RAP-30) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 24IO8I79800 BEAR CREEK - DEWATTO ROAD - 2 I IPI I I 501 5001 5501 5501 I I PE I I 17.45 TO 8.45 I I MJR CLASS of WK: 4 IR/W I I 10.16 E. Gold Creek Road to 0.37 W. Tiger Mission Road I I WORK CODES: ABC ICON I I IRealign and Regrade I I TOTAL LENGTH: 1.00 F.A. PROJ NO. I -I - I I(ID-40 RAP-57) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 25I09I39630 NORTH ISLAND DRIVE - 1 I IUI I I 531 5301 5831 5831 I I PE I I IMP 0.31 TO 1.31 I I MJR CLASS of WK: 4 IR/W I I (End of AC north 1 mile I I WORK CODES: ABD ICON I I IRealign and Regrade I I TOTAL LENGTH: 1.00 F.A. PROD NO. I ®I I I(ID-68) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 26I07I97500 BELFAIR-TAHUYA ROAD - 1 I IUI I I 11020I 10201 10201 I I PE I I 10.00 TO 1.85 I I MJR CLASS of WK: 15 IR/W I I IKay`s Corner northerly 2.00 miles ( I WORK CODES: ABD ICON I I (Horizontal and Vertical realignment I I TOTAL LENGTH: 2.00 F.A. PROD NO. I -I I I(ID-19 RAP-51) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 27IO8I04450 HIGHLAND RD I IUI I I I 9801 9801 9801 I I PE I I 14.65 TO 6.43 I I MJR CLASS of WK: 1 IR/W I I IRealign and Regrade I I WORK CODES: ABD ICON I I 1.72 mi S of Panhandle Lake to 1.5 mi N of Cloquallum I I TOTAL LENGTH: 1.78 F.A. PROJ NO. I -I I(1D-99) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1998 TO 2003 Page 5 MASON COUNTY ------------------------------------------------------------------------------------------------------------------------------------ P IF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL R IU I ICIFI I OBLIGATION I IN IPROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN 0 ICCI DESCRIPTION OF WORK IRINI I T I L I I F I R ITLI IRIDI 1ST 12ND 13RD 14TH I 0 I 0 IRAP I E I 1ST I4TH I I Al IYIIIYEAR IYEAR IYEAR 15TH I T I C ICAPP I D I THRU ITHRU T I SI I INI I I 16TH I A I A IUATA I R I 3RD I6TH Y I SI I IGI I I IYEAR I L I L ITIA I L I YEAR IYEAR ------------------------------------------------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------------------------------------------------ 28I07I96140 GRAPEVIEW LOOP ROAD - 5 I IUI I I I 4561 4561 4561 I I PE I I 16.10 TO 6.93 I I MJR CLASS of WK: 4 IR/W I I ICronquist Road to Nelson Road I I WORK CODES: ABD ICON I I (Realign and Regrade I I TOTAL LENGTH: .83 F.A. PROJ No. I —I — I I(ID-64 RAP-39) I I UTILITY CODES: - - ITOT 01 0 ------------------------------------------------------------------------------------------------------------------------------------ 29I07INEW ROAD "WT-BUDDING ROAD" - PHASE 2 I IUI I I 121801 21801 21801 I I PE I I (APPROXIMATELY 1.5 MILES I I MJR CLASS of WK: 45 IR/W I I INew road from Trails Rd to SR 3 south of SR 106 I I WORK CODES: ABD ICON I I (Phase 2: From end of Phase 1 to SR 3 south of I I TOTAL LENGTH: 4.00 F.A. PROJ NO. I —I I ISR 106 (ID-20) I I UTILITY CODES: PTC - - ITOT 01 0 ------------------------------------------------------------------------------------------------------------------------------------ 30I09I77270 HAVEN WAY - 2 I IUI I I I 7081 7081 7081 I I PE I I 10.91 TO 2.30 I I MJR CLASS of WK: 4 IR/W I I IHAVEN LAKE DRIVE TO END OF AC 1993 PROJECT I I WORK CODES: ABD ICON I I (Realign and Regrade I I TOTAL LENGTH: 1.39 F.A. PROD NO. I ®I — I I(ID-7 Yr-94) I I UTILITY CODES: PT - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 31I07I98250 OLD BELFAIR HWY - 1 I IUI I I I 571 571 571 I I PE I I 10.0 TO 1.04 I I MJR CLASS of WK: 1 IR/W I I ISR 300 to Newkirk Rd I I WORK CODES: ABD ICON I I (Realign and Regrade I I TOTAL LENGTH: 1.04 F.A. PROD NO. I -I - I ((ID-100) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 32I08I86070 SAND HILL RD - 2 I IUI I I I 401 401 401 I I PE I I 12.66 To 3.94 I I MJR CLASS of WK: 4 IR/W I I ITransfer Station to Delmore Road I I WORK CODES: ICON I I (Realign and Regrade I I TOTAL LENGTH: 1.28 F.A. PROJ NO. I -I - I I(ID-89) I I UTILITY CODES: ABD - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 33I07I96140 GRAPEVIEW LOOP ROAD - 4 I IUI I I I 301 301 301 I I PE I I 14.43 TO 5.90 I I MJR CLASS of WK: 4 IR/W I I IGrapeview Store to Cronquest Road I I WORK CODES: ABD ICON I I (Realign and Regrade I I TOTAL LENGTH: 1.47 F.A. PROD NO. I -I I I(ID-63 RAP-61) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 34I07INEW ROAD "WT-BUDDING ROAD" - PHASE 1 I IPI I I I 1261 1261 1261 I I PE I I (APPROXIMATELY 2.5 MILES I I MJR CLASS of WK: 45 IR/W I I INew road from Trails Rd to SR 3 south of SR 106 I I WORK CODES: ABD ICON I I (Phase 1: From Trails Rd out 2.5 miles of proposed I I TOTAL LENGTH: 4.00 F.A. PROJ NO. I -I - I Ialignment. (ID-82) I I UTILITY CODES: PTC - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1998 TO 2003 Page 6 MASON COUNTY ------------------------------------------------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------------------------------------------------ I I I SUMMARY OF COSTS BY FUNDING CATEGORY EXPENDITURE PLAN FUNDING PLAN FEDERAL OBLIGATION PLAN I I I FUNDED PROJECTS I 1st Year 4585 I Local 14348 I Years 1-3 Years 4-6 Totals 2nd Year 3595 I RAP 0 I P E 124 120 244 3rd Year 1772 I CAPP 1458 I R/W 0 0 0 4-6 Year 6198 I TIA 0 I CONTT 100 0 100 I I UATA 0 I I Fed. 344 I I I Totals ... 16150 16150 224 120 344 ------------------------------------------------------------------------------------------------------------------------------------ UNFUNDED PROJECTS I 1st Year 214 I Local 15153 I Years 1-3 Years 4-6 Totals (Proposed and Unknown) I 2nd Year 1425 I RAP 0 I P E 0 0 0 3rd Year 4248 I CAPP 0 I R/W 0 0 0 4-6 Year 9266 I TIA 0 I CONTT 0 0 0 I I UATA 0 i I Fed. 0 I I I Totals ... 15153 15153 0 0 0 ------------------------------------------------------------------------------------------------------------------------------------ TOTAL ALL PROJECTS I 1st Year 4799 I Local 29501 I Years 1-3 Years 4-6 Totals 0 2nd Year 5020 I RAP 0 I P E 124 120 244 3rd Year 6020 I CAPP 1458 I R/W 0 0 0 4-6 Year 15464 I TIA 0 I CONTT 100 0 100 I I UATA 0 I I I Fed. 344 I I I Totals ... 31303 31303 224 120 344