Loading...
HomeMy WebLinkAbout109-97 - Res. Periodic Inspection of Bridges RESOLUTION NO. /�-97 BRIDGE LIMITS WHEREAS, in conformance with procedures adopted by the Washington State Association of Counties, and in the interest of safety, Mason County makes periodic inspections of bridges on the County Road System; and, WHEREAS, inspection and evaluation of Mason County bridges was completed on July 22, 1997; and, WHEREAS, such inspection revealed no measurable deterioration in Mason County bridges; and, WHEREAS, such inspection has determined that two (2) bridges of Mason County's fifty-seven(57) bridges cannot be certified as safe for all legal highway loads. NOW, THEREFORE, BE IT RESOLVED, that the lane limitations continue to be posted to control traffic on the bridges, as listed below, for a period of one (1) year, unless the Board shall, by appropriate action based upon proper certification, modify or remove such restrictions. Max No.of Maximum Bridge No. Bridge Name Load Limit Lanes Sneed Limit 10290-035 Flliboki Bridge ----- 1 ----- Bulb Fann Rd. 10510-0.14 Rock Creek#3 Bridge ----- 1 ----- Bolling Road NOW, THEREFORE, BE IT FURTHER RESOLVED, that the County Engineer shall post the said bridges as listed with the load, speed and/or lane limits, as set forth herein. Violation of these limits shall constitute a misdemeanor in accordance with RCW 3 6.75.270. DATED this 23rd day of September, 1997. BOARD OF COUNTY COMMISSIONERS MASON COUNTY,WASHINGTON MARY JO E;A]Dly, Chairperson / CYNTHIA D. OLSEN, Commissioner JOHN A. BOLENDER, Commissioner ATTEST: Rebecca S. Rogers Clerk of the Board APPROVED AS TO FORM: MICHAEL CLIFT Deputy Prosecuting Attorney cc: Public Works Sheriff Prosecutor