HomeMy WebLinkAbout109-97 - Res. Periodic Inspection of Bridges RESOLUTION NO. /�-97
BRIDGE LIMITS
WHEREAS, in conformance with procedures adopted by the Washington State
Association of Counties, and in the interest of safety, Mason County makes periodic inspections
of bridges on the County Road System; and,
WHEREAS, inspection and evaluation of Mason County bridges was completed on
July 22, 1997; and,
WHEREAS, such inspection revealed no measurable deterioration in Mason County
bridges; and,
WHEREAS, such inspection has determined that two (2) bridges of Mason County's
fifty-seven(57) bridges cannot be certified as safe for all legal highway loads.
NOW, THEREFORE, BE IT RESOLVED, that the lane limitations continue to be
posted to control traffic on the bridges, as listed below, for a period of one (1) year, unless the
Board shall, by appropriate action based upon proper certification, modify or remove such
restrictions.
Max No.of Maximum
Bridge No. Bridge Name Load Limit Lanes Sneed Limit
10290-035 Flliboki Bridge ----- 1 -----
Bulb Fann Rd.
10510-0.14 Rock Creek#3 Bridge ----- 1 -----
Bolling Road
NOW, THEREFORE, BE IT FURTHER RESOLVED, that the County Engineer shall
post the said bridges as listed with the load, speed and/or lane limits, as set forth herein. Violation
of these limits shall constitute a misdemeanor in accordance with RCW 3 6.75.270.
DATED this 23rd day of September, 1997.
BOARD OF COUNTY COMMISSIONERS
MASON COUNTY,WASHINGTON
MARY JO E;A]Dly, Chairperson /
CYNTHIA D. OLSEN, Commissioner
JOHN A. BOLENDER, Commissioner
ATTEST:
Rebecca S. Rogers
Clerk of the Board
APPROVED AS TO FORM:
MICHAEL CLIFT
Deputy Prosecuting Attorney
cc: Public Works
Sheriff
Prosecutor