Loading...
HomeMy WebLinkAbout72A-99 - Res. Annual Construction Program ANNUAL CONSTRUCTION PROGRAM FOR 1999 COUNTY: MASON Date of Submittal of Recommended Program.. 09/29/98 (7) TYPE OF WORK CODES DAY LABOR COMPUTATION Date of Environmental A. GRADING & DRAINING F. SIDEWALKS (A) TOTAL CONSTRUCTION PROGRAM - columns (14) + (15) _ $4,714,000 Assessement.......... 08/28/98 B. BASE & TOP COURSE G. TRAFFIC FACILITIES (B) COMPUTED DAY LABOR LIMIT (see back of page) _ $800,000 Date of Final Adoption. 10/13/98 C. BITUM SURF TREATMENT H. PATHS, TRAILS & BIKEWAYS (C) TOTAL DAY LABOR CONSTRUCTION PROGRAM - column (15) _ $705,000 ordinance\Resolution No. 110-98 D. A.C. / P.C.C. PAVEMENT I. BRIDGES * Line (C) must be smaller than line (B) * AMENDED: 06/30/99 E. CURBS AND GUTTERS J. FERRY FACILITIES Resolution No. 72A-99 (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) 6 YEAR F C TYPE E A SOURCE OF FUNDS ESTIMATED EXPENDITURES ($1,000) ROAD ROAD/PROJECT NAME AND LOCATION LENGTH U L OF N S COUNTY OTHER FUNDS CONSTRUCTION PROGRAM ROAD N A WORK V S FUNDS ITEM ITEM LOG (Include brief termini description or (Miles) C S I E PRELIM. RIGHT GRAND NO. NO. NO. MP's or Bridge #) T S (See work R S AMOUNT PROGRAM ENGR. OF WAY TOTAL codes) N S (1,0001s) (1,000's) SOURCE 595.10 595.20 CONTRACT DAY LABOR All 595_ COUNTY WIDE PROJECTS 1 1 & 2 AC PAVING VAR D E 2393 275 CAPP 2668 2668 15500 Lynch Road MP 0.73 to 2.76 1.55 07 D E 91100 Arcadia Road MP 4.82 to 6.32 1.50 07 D E 97670 McReavy Road MP 2.55 to 5.18 2.50 07 D E 10000 Cloquallum Road MP 8.08 to 10.00 2.01 07 D E 23910 Agate Road MP 4.54 to 6.66 2.12 07 D E 97500 Belfair-Tahuya Road MP 5.18 to 6.40 1.22 07 D E 85870 Larson Lake Road MP 0.00 to 0.67 0.67 08 D E 89100 Larson Boulevard MP 0.00 to 0.52 0.52 08 D E 89250 Larson Lake Drive MP 0.00 to 0.57 0.57 08 D E 41640 Skokomish Valley Road MP 2.48 to 3.88 1.35 08 D E 90100 Shelton-Matlock Road MP 0.91 to 1.80 4.90 07 D E 90100 Shelton-Matlock Road MP 10.95 to 15.56 0.85 07 D E 67900 Drum Street MP 0.00 to 0.07 0.05 09 D E XXXXX Hood Canal Heights MP 0.00 to 0.61 1.00 08 D E Total Miles 20.81 2 3 BST PAVING - 2 shots VAR C E 150 150 150 62670 Anthony Road MP 1.50 to 2.19 0.64 09 C E 79800 Bear Creek-Dewtto Rd MP 0.00 to 1.87 1.87 07 C E 70670 Tahuya-Blacksmith Rd MP 0.00 to 1.50 1.50 08 C E 39410 Wingart Rd MP 0.00 to 0.52 0.52 09 C E Total Miles 4.73 2A 3 BST PAVING - 3rd Shot (1998 2 Shot) 1.35 C E 100 100 100 62670 Anthony Road MP 0.00 to 1.35 1.35 09 C E 3 4 COUNTY WIDE SAFETY PROJECTS VAR FGH E 320 175 145 320 Traffic Control - Drainage - Walkways Bikeways - Guardrail Program 4 5 COUNTY WIDE MINOR CONSTRUCTION VAR AC E 165 165 165 Reconstruction of sub-base and resurfacing Intersections - sight distance improvements PAGE TOTALS==> 3128 275 2843 560 3403 CRAB FORM NO. 3 (REV 11 91) Page 1 of 2 ANNUAL CONSTRUCTION PROGRAM FOR 1999 COUNTY: MASON Date of Submittal of Recommended Program.. 09/29/98 (7) TYPE OF WORK CODES DAY LABOR COMPUTATION Date of Environmental A. GRADING & DRAINING F. SIDEWALKS (A) TOTAL CONSTRUCTION PROGRAM - columns (14) + (IS) _ $4,714,000 Assessement.......... 08/28/98 B. BASE & TOP COURSE G. TRAFFIC FACILITIES (B) COMPUTED DAY LABOR LIMIT (see back of page) _ $800,000 Date of Final Adoption. 10/13/98 C_ BITUM SURF TREATMENT H. PATHS, TRAILS & BIKEWAYS (C) TOTAL DAY LABOR CONSTRUCTION PROGRAM - column (15) _ $705,000 Ordinance\Resolution No. 110-98 D. A.C. / P.C.C. PAVEMENT I. BRIDGES * Line (C) must be smaller than line (B) ** AMENDED: 06/30/99 E. CURBS AND GUTTERS J. FERRY FACILITIES Resolution No. 72A-99 (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) 6 YEAR F C TYPE E A SOURCE OF FUNDS ESTIMATED EXPENDITURES ($1,000) ROAD ROAD/PROJECT NAME AND LOCATION LENGTH U L OF N S COUNTY OTHER FUNDS CONSTRUCTION PROGRAM ROAD N A WORK V S FUNDS ITEM ITEM LOG (Include brief termini description or (Miles) C S I E PRELIM. RIGHT GRAND NO. NO. NO. MP's or Bridge #) T S (See work R S AMOUNT PROGRAM ENGR. OF WAY TOTAL codes) N S (1,0001s) (1,000's) SOURCE 595.10 595.20 CONTRACT DAY LABOR All 595. 175 145 320 5 6 BRIDGE & LARGE CULVERT CONSTRUCTION AND RELATED MITIGATION VAR I I 320 97500 Little Tahuya Creek Culvert MP 9.16 to 9.20 0.04 07 I I 97500 School House Creek Culvert MP 0.20 to 0.24 0.04 07 I I 98250 Bear Creek Culvert MP 3.35 to 3.37 0.02 07 I I 06250 Coffee Creek Culvert MP 0.48 to 0.52 0.04 09 I I 76690 White Creek Culvert MP 2.47 to 2.51 0.04 08 I I ROADS & BRIDGES (New Construction) 6 8 10000 Cloquallum Road -1 MP 11.75 to 12.47 0.72 08 ABD E 891 100 Haz. Elim. 991 991 ROADS & BRIDGES (P\E & R\W only) 7 11 14010 Old Olympic Hwy MP 0.00 to 1.50 1.50 08 ABD E 82 40 42 B2 8 12 62310 Trails Rd MP 0.40 to 1.59 1.19 07 ABD E 43 20 23 43 9 13 79800 Bear Creek-Dewatto Rd MP 7.59 to 9.00 1.41 07 ABD E 63 30 33 63 10 14 10000 Rock Creek Bridge 41 MP 5.83 to 5.87 0.04 07 I I 33 20 13 33 11 15 96140 Grapeview Loop Rd - 3 MP 3.50 to 4.43 0.93 07 ABD E 25 25 25 12 16 96140 Grapeview Loop Rd - 4 MP 4.43 to 5.90 1.47 07 ABD E 25 25 25 13 17 28850 Pickering Rd - 3 MP 3.41 to 4.45 1.04 08 ABD E 25 25 25 PAGE TOTALS==> 1507 100 185 ill 1166 145 1607 PROGRAM TOTALS==> 4635 375 185 111 4009 705 5010 NOTE: As per WAC 136-16-030, a list of all major equipment purchases contemplated for the year 1999 is attatched hereto, with the E R & R Budget Submitted separately and by this reference made a part of this Annual Construction Program. CRAB FORM NO. 3 (REV 11/91) Page 2 of 2