HomeMy WebLinkAbout13-99 - Res. County Road Project 1596 and 1597 SOLUTION NO. & / s
BEFORE BOARD OF COUNTY COMMISSIONERS OF MASON COUNTY, WASHINGTON,
In the matter of initiating county road projects and assigning CRP numbers .
IT IS HEREBY RESOLVED THAT the roads listed below be improved as shown between the points indicated.
These projects are hereby declared to be public necessity and the county road engineer is hereby ordered and authorized to report and proceed thereon as by law
provided. (RCW 36 . 75 , 0505 36 . 80 . 080, 36 . 80 . 070) (Optional References) ,
IT IS FURTHER RESOLVED that appropriations from the officially adopted road fund budget and based on the county engineers estimates are hereby made in the
amount and for the purposes shown:
( 1 ) (2) (3 ) (4) (5) (6) (7) (8) (9)
DAY
L COST ESTIMATE (THOUSANDS) ANNUAL
C A CONST.
TYPE OF O B ENG'R, CONSTRUCTION PROG.
ROAD NAME AND/OR ROAD LOG WORK N O ITEM CRP
ITEM BRIDGE NUMBER NUMBER MP TO MP (see codes) T. R R/W FEDERAL LOCAL NO, NO.
1 , County-wide culvert _______.____ C X 75 3 1596
installation - 1999
2. County-wide sign placement _ ____________ __ H X 25 3 1597
1999
(4) TYPE OF WORK CODE (5) The construction is to be accomplished by contract
A. Preliminary Engineering F . Curbs and Gutters in accordance with RCW 36 .77 . 020 et. seq.
B . Right-of-Way G. Sidewalks
C . Grading, Draining, Surfacing H. Traffic Facilities (6) The construction is to be accomplished by county
D . Light, Bituminous Surface Treatment I. Bridge Construction forces in accordance with RCW 36 .77 . 060 and
E. A. C. or P . C . C . Pavement J. Paths & Trails (RCW 47 , 301 ) WAC 136 . 18 ,
BOARD OF COUNTY COMMISSIONERS OF
ADOPTED this 26th day of January 1999 . MASON COUNTY, WASHINGTON
CYNTtIJA D . OLSEN, Chairperson
ATTEST :
JOTIN A. BOLENDER, Member
Clerk of the Boar
cc: Commissioners
Engineer MARY JO CADY, Member
JOURNAL : Publ. It: cir (Bill Road Dept. )
scv h:\wp\crp\form.wpd