HomeMy WebLinkAbout44-05 - Res. Initiating County Road Projects 1848 and 1849 RESOLUTION NO. : 44 - 05
BEFORE THE BOARD OF COUNTY COMMISSIONERS OF MASON COUNTY, WASHINGTON.
In the matter of initiating county road projects and assigning CRP numbers .
IT IS HEREBY RESOLVED THAT the roads listed below be improved as shown between the points indicated.
These projects are hereby declared to be public necessity and the county road engineer is hereby ordered and authorized to report and proceed thereon as by law
provided . (RCW 36 . 75 . 050 , 36 . 80 . 080 , 36 . 80 . 070) (Optional References) .
IT IS FURTHER RESOLVED that appropriations from the officially adopted road fund budget and based on the county engineers estimates are hereby made in
the amount and for the purposes shown :
( 1 ) (2) (3 ) (4) (5 ) (6) (7) (8) (9)
DAY
L COST ESTIMATE (THOUSANDS) ANNUAL
C A CONST .
TYPE OF O B ENG 'R, CONSTRUCTION PROG,
ROAD NAME AND/OR ROAD LOG WORK N O ------.....--..................................--- ITEM CRP
ITEM BRIDGE NUMBER NUMBER MP TO MP (see codes) T. R R/W FEDERAL LOCAL NO. NO.
1 . HIGHLAND 04450 0.00 1 .0 E X 5 . 0 230. 00 1 1848
2. SHELTON-MATLOCK 90100 13 .23 13 . 72 E X 5 . 0 40.00 1 1849
(4) TYPE OF WORK CODE (5 ) The construction is to be accomplished by contract
A. Preliminary Engineering F . Curbs and Gutters in accordance with RCW 36 . 77. 020 et. seq.
B . Right-of--Way G. Sidewalks
C . Grading, Draining, Surfacing H. Traffic Facilities (6) The construction is to be accomplished by county
D . Light, Bituminous Surface Treatment I . Bridge Construction forces in accordance with RCW 36 . 77 . 060 and
E. A. C . or P . C . C . Pavement J . Paths & Trails (RCW 47 , 301 ) WAC 136 , 18 ,
BOARD OF COUNTY COMMISSIONERS OF
ADOPTED this 17 t h day of Ma Y , 2005 , MASON COUNTY, WASHINGTON
JA L . , Cha son
ATTEST :
i
PIA RING ERICKS Member
Clerk of the Board
cc : Commissioners F �^^ C
Engineer TIM SHELDON, Member
JOURNAL : Publ . It : 05/ 19/05 (Bill Rd Dept. )
rhodin h :\wn10\cm\ac-nave-05 . doc