Loading...
HomeMy WebLinkAbout42-06 - Res. Revised Annual Construction Programt V le Annus 1:e SOILT] L SON NO. 42 =06 ReVfsed A D11 = Constrici ors Pso yrn -TEMP, S9 Chapter 13 6=16 WAC, sets forth the procedures for t�i e ado Construction Program; and, WHEREAS, it comp d a pub is hearing on the N OW JL otion of iance yherewith, -ihe boast of Cou:ity Commissioners has Construction Progra�r this I6th day of May, 2006. EREYORi9 lB IA:, RESOLVED by tl e Board of Mason County Commissioners, in regdiar session assemhied, that attached Revised Annua Construction Program for 2006 be adopted as set forth in detai�, consisting of I through 19, which are incorpo-Aated and made part of this Resoyutiona ATT 0 • ADOPTE I, this 16th day of May 2006. 1 REBECCA S. ROGERS -- Clerk of the board OVEI) AS TO FORYo I/7 f it iNliEr 1 i GARY BURLES6N Prosecuting Arcot ley cc: Cmmr Public Works General Services County Road Admin. Board WSDOT/TransAid tem N o' s 1 'O &RID) OF COUNTY CCOITIVI SSMONERS MASON COUNTY, WASIINGTON • SONS Chairperson JA t L. KAMIN, 06n\missioner ("COI- TIM SHELDON, Commissioner KM H: wp101TextlAnnual-Res.-Revised.doc (1) (A) TOTAL CON (E3)1 CO-3L II ED `C) IOTA= DAY (2) ITEM NUMBER 01� 02 03 04 05 06 07 08 09 10 11 12 1 • 2 3 4 5 6 (3) ROAD LOG NO. 91720 91720 98250 62400 Var 90100 Var 02230 10430 23910 23910 59090 D „ Y LABOR CONST A UCT lON0—® STR�CTOON PROGRAM o columns (14)+(15) DAY LABOR LOMHT (see instructions) _ABM' OR CONSTS1 PROGRMvq o colramn (15) ( ) COKST JC T �� $ii 000Ls $6,356 $953 $417 ** Line (C) must be smaller than Line (B) ROAD/PROJECT NAME AND LOCATION (Include brief termini description or MP's; Bridge #) COUNTY WIDE PROJECTS AC Pawing Johns Prairie Rad MP 0.51 to MP 1.02 Johns Prairie Road MP 1.77 to MP 2.50 Old Belfair Highway MP 1.58 to MP 2.18 BST Paving 0 2 S Rasor Rd lot MP 0.00 to MP 2.36 Countywide Safety improvements Countywide Major CoII. Safety Improv. Shelton Matlock Corridor Safety Improvement Traffic Control - Drainage - Clear Zones - Walkways - Bikeways - Guardrail County Wide Einorr Construction Belfair Street MP 0.00 to MP 0.11 Resurfacing, drainage, sub -base, intersection and sight distance improvements 3ridge & Large Cu inert Construction Beeville Rd Wivel Rd Agate Rd - Malaney Creek - SPSSEG Agate Rd - Uncle John's Creek Creekside Drive ROADSQ��RI MP 2.09 IDES (Construction) 96140 Grapeview Loop Road - 3 MP 3.50 TO 6.93 14010 Skookum Creek Bridge Old Olympic Highway MP 0.42 to 0.44 (5) (6) (7) (8) (9) ** ROGR'-`MST FC R2 08 (1 0) (Miles) 0.51 0.73 0.60 16 07 07 2.36 09 Var \far 2.24 Var 0.11 0.20 0.20 0.20 0.20 0.20 3.43 0.02 Var 07 07 Var 09 09 09 07 07 09 07 08 WORK CODE(S) D D D D FGH G G 1 D K K K K K ABD 1 z z Leu z >' z< w E E E E E E E E E COUNTY FUNDS (1000°s) SOURCES OF FUNDS OHER FUNDS AM9UNT (1000°s) 1 1 0 100 90 20 92 23 72 95 181 135 284 2,310 225 AG r JA DATE OF ENVIROO NCY ACTTCON COUI`L TY> Current '�opulaflon: N ED °ROG. S l l T Il cATA,, ASSESSIEF PROGRAM SOURCE 83 119 99 500 250 104 60 292 690 800 CAPP CAPP CAPP STP State - I&CSP SRFB USFWS/SRFB State -Other RAP BIA Mason 510900 0 December 1, 2005 �9 T DATE at Val\ A. A DOS- T UON December 6, 2005 O .DUN A ACE/RESOLD T AOOR\9 NO. 118-05 DATE OF „ IR `9 D Chi Tc EL T 12-06 (12) (13) (14) ESTIMATED (15) (16) EXPENDITURES ALL 1N $1000's TG`I CONSTRUCTION PRELIM. OF ENGRING WAY 59510 595.20 (10002s) (1000°s) 7 40 40 10 13 11 35 10 22 18 3 5 7 6 18 5 10 CONTRACT ) 83 119 98 380 150 23 156 138 420 120 252 3,000 1,000 DAY LABOR (1000°s) 100 80 80 80 77 GRAND TOTAL ALL 595 84 120 99 100 90 500 270 92 23 176 155 473 135 284 3,000 1,025 PAGE ONE TOTALS, CONSTRUCTION 2,997 CRAB FORM #3, REVISED 08/05 6YP D6 Version 1/26/06 - Page 1 of 2 209 61 5,939 41 7 6,626 constprgm06r3.xis D A Y LABOR CONSTRUCTION:—* (A) TOT a= COWS UCTDOI\ PROGRAM o columns (14)+(15) ( ) CO1PT J T ED DAY LABOR LlMDT (see orgstrruct ors) (C) TOTAL DAY LABOR CONIISSPROG M A li o c; :lumn (15) (1) (2) {3) TEMM NUMBER 13 14 15 16 17 18 19 ROAD LOG NO. (4) NUAL *N $l000°s $6,356 S li RUJCTION PROGRAM FOR 2006 $953 $417 ** Line (C) must be smaller than Line (B) ** ROAD/PROJECT NAME AND LOCATION (Include brief termini description or MP's; Bridge #) (5) (Miles) (6) (7) (8) (9) 10) AGE LCY AMNON: ION: --ATE DAT COUNTY ►- Mason Current Population: RECOEJflJ ENDDED PROGC SUBkf F ED December 1, 2005 I 51, 900 7 OF VBRO V \I T "L ASSESSRh1HN T DATE OF FMK= „DD J°TION ORDINANCE/RESOL TION G'L DATE OF AR! EKDIr (12) December 6, 2005 118-05 12-06 (13) (14) (15) (16) 9 10 11 13 n/a 15420 70390 91720 96140 96140 79800 Var ROADS 82 BRIDGES (PE at R/W Oily Lynch Rd/US 101 - Simmons Road North Shore Road Erosion Repairs Johns Prairie Road MP 2.52 to 3.45 McLane Cove Bridge Grapeview Loop Road MP 2.41 to 2.45 Grapeview Loop Road - 2 MP 1.61 to 3.50 Bear Creek Dewatto Road MP 7.59 - 10.00 Misc Engineering & R/W Costs ) 2.00 Var 0.93 0.04 2.39 2.41 Var 09 08 07 07 07 08 n/a WORK CODE ABDH K ABD I ABD ABD G PAGE TWO TOTALS, CONSTRUCTION PROGRAM TOTALS, CONSTRUCTION WAC 136-16-035, MAINTENANCE SOURCES OF FUNDS COUNTY FUNDS (1000's) OTHER FUNDS AMOUNT f1000's) 25 88 30 177 50 150 520 PROGRAM SOURCE 500 112 45 State STP(R) BR RAP STP(R) 657 ESTIMATED EXPENDITURES ALL IN $1000's RIGHT PRELIM. OF ENGRING WAY 595.10 595 20 (i 000's) (10009s) 250 25 200 75 126 50 150 25C 51 876 301 CONSTRUCTION CONTRACT (1i 000°s) 0 DAY LABOR (1000's) 0 GRAND TOTAL ALL 595 500 25 200 75 177 50 150 �+ 3,654 1,085 362 5,939 417 4,149 7,803 3,915 CRAB FORM #3, REVISED 08/05 6YP D6 Version 1/26/06 - Page 2 of 2 constprgm06r3.xls