HomeMy WebLinkAbout42-06 - Res. Revised Annual Construction Programt
V
le Annus
1:e
SOILT] L SON NO. 42 =06
ReVfsed A D11 = Constrici ors Pso yrn
-TEMP, S9 Chapter 13 6=16 WAC, sets forth the procedures for t�i e ado
Construction Program; and,
WHEREAS, it comp
d a pub is hearing on the
N OW JL
otion of
iance yherewith, -ihe boast of Cou:ity Commissioners has
Construction Progra�r this I6th day of May, 2006.
EREYORi9 lB IA:,
RESOLVED by tl e Board of Mason County
Commissioners, in regdiar session assemhied, that attached Revised Annua
Construction Program for 2006 be adopted as set forth in detai�, consisting of I
through 19, which are incorpo-Aated and made part of this Resoyutiona
ATT
0
•
ADOPTE I, this 16th day of May 2006.
1
REBECCA S. ROGERS --
Clerk of the board
OVEI) AS TO FORYo
I/7 f it iNliEr
1 i
GARY BURLES6N
Prosecuting Arcot ley
cc:
Cmmr
Public Works
General Services
County Road Admin. Board
WSDOT/TransAid
tem N o' s 1
'O &RID) OF COUNTY CCOITIVI SSMONERS
MASON COUNTY, WASIINGTON
•
SONS Chairperson
JA t L. KAMIN, 06n\missioner
("COI-
TIM SHELDON, Commissioner
KM H: wp101TextlAnnual-Res.-Revised.doc
(1)
(A) TOTAL CON
(E3)1 CO-3L II ED
`C) IOTA= DAY
(2)
ITEM NUMBER
01�
02
03
04
05
06
07
08
09
10
11
12
1
•
2
3
4
5
6
(3)
ROAD
LOG
NO.
91720
91720
98250
62400
Var
90100
Var
02230
10430
23910
23910
59090
D „ Y LABOR CONST
A
UCT lON0—®
STR�CTOON PROGRAM o columns (14)+(15)
DAY LABOR LOMHT (see instructions)
_ABM' OR CONSTS1 PROGRMvq o colramn (15)
( )
COKST JC T ��
$ii 000Ls
$6,356
$953
$417
** Line (C) must be smaller than Line (B)
ROAD/PROJECT NAME
AND LOCATION
(Include brief termini description
or MP's; Bridge #)
COUNTY WIDE PROJECTS
AC Pawing
Johns Prairie Rad MP 0.51 to MP 1.02
Johns Prairie Road MP 1.77 to MP 2.50
Old Belfair Highway MP 1.58 to MP 2.18
BST Paving 0 2 S
Rasor Rd
lot
MP 0.00 to MP 2.36
Countywide Safety improvements
Countywide Major CoII. Safety Improv.
Shelton Matlock Corridor Safety Improvement
Traffic Control - Drainage - Clear Zones -
Walkways - Bikeways - Guardrail
County Wide Einorr Construction
Belfair Street MP 0.00 to MP 0.11
Resurfacing, drainage, sub -base,
intersection and sight distance improvements
3ridge & Large Cu inert Construction
Beeville Rd
Wivel Rd
Agate Rd - Malaney Creek - SPSSEG
Agate Rd - Uncle John's Creek
Creekside Drive
ROADSQ��RI
MP 2.09
IDES (Construction)
96140 Grapeview Loop Road - 3 MP 3.50 TO 6.93
14010
Skookum Creek Bridge
Old Olympic Highway MP 0.42 to 0.44
(5)
(6)
(7)
(8)
(9)
**
ROGR'-`MST FC R2 08
(1 0)
(Miles)
0.51
0.73
0.60
16
07
07
2.36 09
Var
\far
2.24
Var
0.11
0.20
0.20
0.20
0.20
0.20
3.43
0.02
Var
07
07
Var
09
09
09
07
07
09
07
08
WORK CODE(S)
D
D
D
D
FGH
G
G
1
D
K
K
K
K
K
ABD
1
z z
Leu
z
>'
z<
w
E
E
E
E
E
E
E
E
E
COUNTY
FUNDS
(1000°s)
SOURCES OF FUNDS
OHER FUNDS
AM9UNT
(1000°s)
1
1
0
100
90
20
92
23
72
95
181
135
284
2,310
225
AG
r
JA
DATE OF ENVIROO
NCY ACTTCON COUI`L TY>
Current '�opulaflon:
N ED °ROG. S l l T Il
cATA,, ASSESSIEF
PROGRAM
SOURCE
83
119
99
500
250
104
60
292
690
800
CAPP
CAPP
CAPP
STP
State - I&CSP
SRFB
USFWS/SRFB
State -Other
RAP
BIA
Mason
510900
0 December 1, 2005
�9 T
DATE at Val\ A. A DOS- T UON December 6, 2005
O .DUN A ACE/RESOLD T AOOR\9 NO. 118-05
DATE OF „ IR `9 D Chi Tc EL T 12-06
(12)
(13) (14)
ESTIMATED
(15)
(16)
EXPENDITURES
ALL 1N $1000's
TG`I CONSTRUCTION
PRELIM. OF
ENGRING WAY
59510 595.20
(10002s) (1000°s)
7
40
40
10
13
11
35
10
22
18
3
5
7
6
18
5
10
CONTRACT
)
83
119
98
380
150
23
156
138
420
120
252
3,000
1,000
DAY LABOR
(1000°s)
100
80
80
80
77
GRAND
TOTAL
ALL 595
84
120
99
100
90
500
270
92
23
176
155
473
135
284
3,000
1,025
PAGE ONE TOTALS, CONSTRUCTION
2,997
CRAB FORM #3, REVISED 08/05 6YP D6 Version 1/26/06 - Page 1 of 2
209
61
5,939
41 7
6,626
constprgm06r3.xis
D A Y LABOR CONSTRUCTION:—*
(A) TOT a= COWS UCTDOI\ PROGRAM o columns (14)+(15)
( ) CO1PT J T ED DAY LABOR LlMDT (see orgstrruct ors)
(C) TOTAL DAY LABOR CONIISSPROG M A li o c; :lumn (15)
(1)
(2)
{3)
TEMM NUMBER
13
14
15
16
17
18
19
ROAD
LOG
NO.
(4)
NUAL *N
$l000°s
$6,356
S li RUJCTION PROGRAM FOR 2006
$953
$417
** Line (C) must be smaller than Line (B)
**
ROAD/PROJECT NAME
AND LOCATION
(Include brief termini description
or MP's; Bridge #)
(5)
(Miles)
(6)
(7)
(8)
(9)
10)
AGE LCY AMNON:
ION:
--ATE
DAT
COUNTY ►- Mason
Current Population:
RECOEJflJ ENDDED PROGC SUBkf F ED December 1, 2005
I 51, 900
7
OF VBRO V \I T "L ASSESSRh1HN T
DATE OF FMK= „DD J°TION
ORDINANCE/RESOL TION G'L
DATE OF AR! EKDIr
(12)
December 6, 2005
118-05
12-06
(13)
(14)
(15)
(16)
9
10
11
13
n/a
15420
70390
91720
96140
96140
79800
Var
ROADS 82 BRIDGES (PE at R/W Oily
Lynch Rd/US 101 - Simmons Road
North Shore Road Erosion Repairs
Johns Prairie Road MP 2.52 to 3.45
McLane Cove Bridge
Grapeview Loop Road MP 2.41 to 2.45
Grapeview Loop Road - 2 MP 1.61 to 3.50
Bear Creek Dewatto Road MP 7.59 - 10.00
Misc Engineering & R/W Costs
)
2.00
Var
0.93
0.04
2.39
2.41
Var
09
08
07
07
07
08
n/a
WORK CODE
ABDH
K
ABD
I
ABD
ABD
G
PAGE TWO TOTALS, CONSTRUCTION
PROGRAM TOTALS, CONSTRUCTION
WAC 136-16-035, MAINTENANCE
SOURCES OF FUNDS
COUNTY
FUNDS
(1000's)
OTHER FUNDS
AMOUNT
f1000's)
25
88
30
177
50
150
520
PROGRAM
SOURCE
500
112
45
State
STP(R)
BR
RAP
STP(R)
657
ESTIMATED
EXPENDITURES
ALL IN $1000's
RIGHT
PRELIM. OF
ENGRING WAY
595.10 595 20
(i 000's) (10009s)
250
25
200
75
126
50
150
25C
51
876
301
CONSTRUCTION
CONTRACT
(1i 000°s)
0
DAY LABOR
(1000's)
0
GRAND
TOTAL
ALL 595
500
25
200
75
177
50
150
�+
3,654
1,085
362
5,939
417
4,149
7,803
3,915
CRAB FORM #3, REVISED 08/05
6YP D6 Version 1/26/06 - Page 2 of 2
constprgm06r3.xls