HomeMy WebLinkAbout08-08 - Res. Initiating County Road Projects 1906-1911-74
RESOLUTION NO.
BEFORE THE BOARD OF COUNTY COMMISSIONERS OF MASON COUNTY, WASHINGTON.
In the matter of initiating county road projects and assigning CRP numbers.
IT IS HEREBY RESOLVED THAT the identified projects listed below are repaired as indicated below.
IT IS FURTHER RESOLVED that appropriations from the officially adopted road fund budget and based on the county engineers estimates are hereby made in the amount and for the purposes shown:
work defined as "construction" in the BARS Manual, Page II-63, et seq, is determined to be necessary and proper; and,
WHEREAS, the projects listed are due to a natural disaster and where not scheduled activities,
THEREFORE these projects are not identified on the officially adopted County Annual Road Program;
SAID WORK is to be performed by day labor/contract in accordance with Washington State Standard Specifications for Road and Bridge Construction as adopted by Mason County.
8-08
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
ITEM
ROAD NAME
ROAD LOG
WORK
APPROX.
M/P
-
PROJECTED
COST FOR
ENGINEERING
PROJECTED
COST FOR
RIGHT OF WAY
PROJECTED
COST FOR
ROAD CONSTRUCTION
CRP
SECTION,
DESCRIPTION OF
TOWNSHIP, RANGE
NUMBER
1.
Finch Creek Road
45140
Bridge Replacement Project
0.18
$ 30, 000
$ 20,000
$ 125,000
1906
S 11, T 22N, R 4W, WM
2.
Sand Hill Road
86070
Repair of road, following
slide
4.05
$ 150,000
$ 20,000
$ 830,000
1907
S 18, T23N, R l W, WM
3.
Dewatto !lolly
Road
76690
Repair of road, following
slide
1.60
$ 150,000
$ 10,000
$ 400,000
1908
S 26, T 23N, R 1 W, WM
4.
Grapeview Loop
Road
96140
Shoulder and road repairs
6.05
$ 100,000
$ 20,000
$ 400,000
1909
S 32, T 22N, RI W, WM
5.
North Shore Road
70390
Repair of road, following
slide
11.121
$ 150,000
$ 40,000
$ 600,000
1910
S 27, T22N, R 3W, WM
6.
North Shore Road
70390
Repair of road, following
slide
11.600
$ 100,000
$ 10,000
$ 350,000
1911
S28, T 22N, R 3W, WM
BE IT FURTHER RESOLVED that the chairman is authorized to sign all pertinent documents related to this CRP'S including, but not limited to signing of right of way plans, authorize right of way acquisition, sign plans for construction, and sign the
contracts.
The County Road projects herein described in HEREBY DECLARED to be a public necessity, and the County Road Engineer is HEREBY ORDERED AND AUTHORIZED to report and proceed thereon as by law, provided and in accordance with WAC 136-18.
ADOPTED this 15th day of January, 2008.
ATTEST:
1 3ECe • . ' •' er c o e oar
cc: Commissioners
Engineer
BOARD OF COUNTY COMMISSIONERS OF
MASON COUNTY, WASHINGTON
1'1M SHELDON, Chairman