HomeMy WebLinkAbout46-11 - Res. County Road Project 1959 Highland Road 1960 Shelton-Matlock RoadResolution No. /th •• 1
BEFORE THE BOARD OF COUNTY COMMISSIONERS OF MASON COUNTY, WASHINGTON.
In the matter of initiating County Road Projects and assigning CRP numbers.
IT IS HEREBY RESOLVED THAT the roads listed below be improved as shown between the points indicated.
These projects are hereby declared to be public necessity and the county road engineer is hereby ordered and authorized to report and proceed
as by law provided. (RCW 36.75.050, 36.80.030, 36.80.070) (Optional References).
IT IS FURTHER RESOLVED that appropriations from the officially adopted road fund budget and based on the county engineers estimates
are hereby made in the amount and for the purposes shown:
Item
Annual
Const.
Item No.
Contract
County
Forces
Road No.,
04450''
Road Name
an ROad
I �
�.L mil .ire
Shelton Matlock Road
M.P
Type of
Work
See Code)
:,
- Girir irirrrr i�.�rrr.-rrrr-
10.1-11.3
(1) (2) (3) (4) (5) (6) (7) (8)
(6) TYPE OF WORK CODE:
A. Grading & Draining
B. Base & Top Course
C. B S.T. / Seals
D. A.C./P.C.C. Pavement
E. Curbs and Gutters
F. Sidewalks
G. Traffic Facilities
H. Paths, Trails, Bikeways
I Bridges
J. Ferry Facilities
ADOPTED this 2nd day of August, 2011
ATTEST:
0 GOUDY, Clerk of th
APPROVE AS TO FORM
TIM WHITEHE
cc: Commissioners
Engineer
JOURNAL. Publ. 1
y
K Environmental Mitigation
L. Fish Passage
rosecuting Attorney 4;r3
1 (Bill Rd Dept.)
Cost Estimate (Thousand $)
Construction
Local 1 Grant
lir
Engr
30
R/W
(10) (11) (12
Section, Township, Range
•
S'ec! VVM
II I Lj
. .. . .i
iiiiriii'..Li inrr�
Sec. 10-11, T 20N, R 5 W, WM
(7) The construction is to be accomplished by contract
in accordance with RCW 36.77.020 et. seq.
(8) The construction is to be accomplished by county
forces in accordance with RCW 36.77.065 and WAC 136.18.30
BOARD OF COUNTY COMMISSIONERS
MAS ( COUNTY, WASHING _ ON
4 diet}
A RING ERICKSON t ommissioner
es'''soprostIffswesp.
Lionamas
JERRY K. LINGLE, Commis er
CRP No
1959
Sit SSSI Sr rim
1960