HomeMy WebLinkAbout53-17 - Res. Initiating County Road Projects 2012 Johns Prairie Road and 2013 Mason Lake RoadBEFORE THE BOARD OF COUNTY COMMISSIONERS OF MASON COUNTY, WASHINGTON.
In the matter of initiating County Road Projects and assigning CRP numbers.
IT IS HEREBY RESOLVED THAT the roads listed below be improved as shown between the points indicated.
RESOLUTION NO: 53-\ 1
These projects are hereby declared to be public necessity and the county road engineer is hereby ordered and authorized to report and proceed
as by law provided. (RCW 36.75.050, 36.80.080, 36.80.070).
IT IS FURTHER RESOLVED that appropriations from the officially adopted road fund budget and based on the county engineers estimates
are hereby made in the amount and for the purposes shown: <::ostEsumate (Tnousand.$)
I I I I i Type of i
6-Year i Work County i
Item Item No. Road No. Road Name M.P i (See Code) Cont. Forces Local FED Engr i R/W i Const Section, Township, Range CRP No.
I I 91720 John's Prairie Rd 0.5-2.6: D 520 79 191 408 79: 0 : 520 S4,5,6,7,8,T20N,R3W 2012
2 I 52210 Maason Lake Rd 1.3-2.8 I D 370 56 134 292 56 I O I 370 S27, 33, 34, T21N, R3W 2013 --------------------------------------------__________ .J___________ -------------------------------- ______ .J _______ .1,_______ ------------------------------------3 : : : ------------------------------------------------------�-------------------------------------------------�-------f-------------------------------------------4 : : : ------ -------------------------------------------------,--------------------------------------------------,-------T-------------------------------------------5 : : : -------------------------------------------------------1--------------------------------------------------4-------+-------------------------------------------6 : l : ------------------------------------------------------.J-------------------------------------------______ .J _______ .1 _______ ------------------------------------7 : l : ------------------------------------------------------�-------------------------------------------------+------f-------------------------------------------8 : : : ------------------------------------------------------,-------------------------------------------------,-------T-------------------------------------------9 : l : --------------- ----------------------------------------4-------------------------------------------------"'4-------+-------------------------------------------
10 : l : ------------------------------------------------------.J-------------------------------------------------.J-------.1.-------------------------------------------
11 : l : ------------------------------------------------------�-------------------------------------------------,-------f----------------------------------- --------
12 : : : ------------------------------------------------------,-------------------------------------------------,-------T-------------------------------------------
13 : : : +-----+-----+----------+-------------+-----4 135 I o I 890
(I)(2)(3)(4)(5)(6) (7)
(7)TYPE OF WORK CODE
A. Grading & Draining F. Sidewalks K. Environmental Mitigation
B.Base & Top Course
C. B.S.T. I Seals
D.HMA Overlay
E.Curbs and Gutters
G. Traffic Facilities L. Fish Passage
H. Paths, Trails, Bikeways
I.Bridges
J.Ferry Facilities
'fL... C:..n� ADOPTED this ?,.() day of � 2017
cc: Commissioners
Engineer
JOURNAL: Publ. lt: 10/5/17 (Bill Rd Dept.)
(8)
325 700
(9)(10)(11) (12) (13)
(7)The construction is to be accomplished by contract
in accordance with RCW 36.77.020 et. seq.
(14)
(8)The construction is to be accomplished by county
forces in accordance with RCW 36.77.065 and WAC 136.18
BOARD OF COUNTY COMMISSIONERS
MASON CO HINGTON
-
�
I-
(15)
L--------
------~----------------------------------------------~-------------------------1 I I I
L_ __ L..-_....J. ______ __. ________ ...._ _ ___.
Terri Drexler, Commisfioner